contractors.fyi
Sign in

Shipley Electric, LLC

Panel upgrade electrician working in Austin.

  • License active

96 jobs on Austin permits, 2021 to 2026: 72 panel upgrades, 23 EV charger installations, 1 solar installation. 12th most panel upgrade permits of 327 contractors in Austin.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?Texas electrical contractor license 35244, valid until May 18, 2027We matched it by the business name in the same city, Austin.Checks out
Jobs on record96 jobs on Austin permits, 2021 to 2026: 72 panel upgrades, 23 EV charger installations, 1 solar installation12th most panel upgrade permits of 327 contractors in Austin. That counts jobs, not quality.Our Austin permit records cover September 2021 to September 2026.

Records: City of Austin permits.

Cost and timing

Permit timeline

Across Austin, a panel upgrade permit stays open about 62 days, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. Waiting for the permit adds about 6 days. How long panel upgrade jobs take.

Track record

9 jobs in the last 12 months, down from 12 the year before

Q3 2021: 1 jobQ4 2021: 10 jobsQ1 2022: 2 jobsQ2 2022: 5 jobsQ3 2022: 9 jobsQ4 2022: 4 jobsQ1 2023: 10 jobsQ2 2023: 8 jobsQ3 2023: 6 jobsQ4 2023: 5 jobsQ1 2024: 7 jobsQ2 2024: 5 jobsQ3 2024: 3 jobsQ4 2024: 5 jobsQ1 2025: 3 jobsQ2 2025: 2 jobsQ3 2025: 2 jobsQ1 2026: 3 jobsQ2 2026: 5 jobsQ3 2026: 1 jobBusiest: 10 jobsLatest: 1 job20222023202420252026
Each bar is 3 months of permits. The tallest is 10 jobs, October to December 2021. Across Austin, all contractors together had 17% more panel upgrade jobs in the last 12 months than in the 12 months before.

Where they work most

  • 7873320 jobs
  • 787578 jobs
  • 787046 jobs
  • 787466 jobs
  • 787506 jobs

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Jul 1, 2026Panel upgradeInstall AE Meter with riser from existing main panel on power pole78745not stated
Jun 23, 2026Panel upgradeReplace Meter and Main Service Panel78752not stated
Jun 4, 2026Panel upgradeRiser - 200 Amp Meter - 200 Amp Main Panel Installation78745not stated
May 21, 2026Panel upgrade200 Amp Meter - 200 Amp Main Panel - EV charger78758not stated
May 21, 2026EV charger200 Amp Meter - 200 Amp Main Panel - EV charger78758not stated
Apr 16, 2026Panel upgradeInstall 200 Amp Meter/ 200 Amp Main Disconnect/ 200 Amp Main Panel78727not stated
Mar 31, 2026Panel upgradeNo details on the permit78731not stated
Mar 19, 2026Panel upgradeReplace 200 Amp Meter & Main Panel78749not stated
Jan 9, 2026Panel upgrade, 336 sq ftReplace meter and main panel - 336 sq ft78705not stated
Jul 18, 2025Panel upgradeService Upgrade to 200 Amps78731not stated
Jul 18, 2025Panel upgrade200 Amp Service Equipment78733not stated
May 12, 2025Panel upgradeOverhead Service Rebuild to 200 Amp Meter & Main Service Panel78757not stated
Apr 28, 2025Panel upgradeReplace meter and main service panel to 200 amps with main breaker78758not stated
Mar 5, 2025Panel upgradeReplace Meter and Main Service Panel - 200 Amp78733not stated
Feb 24, 2025Panel upgradeNo ESPA needed - add EV Charger at main panel - Eligible for AE Rebate78757not stated
Feb 24, 2025EV chargerNo ESPA needed - add EV Charger at main panel - Eligible for AE Rebate78757not stated
Dec 22, 2024EV chargerInstallation of EV Charger - Eligible for AE rebate78733not stated
Dec 22, 2024Panel upgrade200 Amp Main Panel Replacement - Meter & Riser included (Approved ESPA Attached)78733not stated
Dec 22, 2024Panel upgradeRebuild 200 Amp Service - Meter & Main Service Panel Approved ESPA attached78745not stated
Nov 19, 2024Panel upgradeReplace 200 Amp Main Panel with 200 Amp Smart Panel - Whole Home Energy Management System (SPAN)78757not stated
Oct 20, 2024Panel upgradeReplacing Main Service Panel & Combining 2x Meters on Same Home to Become 1x Meter78748not stated
Aug 26, 2024EV chargerEV charger install - AE rebate eligible78703not stated
Aug 6, 2024EV chargerInstall EV charger - eligible for rebate78749not stated
Aug 1, 2024Panel upgradeEmergency Disconnect - replace Federal Pacific panel and upgrade meter to 200 amps78731not stated
Jun 27, 2024Panel upgradeReplace meter with 200 Amp/ Panel with SPAN smart panel/ new riser78704not stated
May 31, 2024Panel upgradeInstall 200 amp service panel w/ 200 amp main service panel78746not stated
May 31, 2024EV chargerInstall 200 amp service panel w/ 200 amp main service panel78746not stated
Apr 23, 2024Panel upgradeReplace Riser/ Meter/ Panel - Add 200 Amp Main Disconnect on outside of home78731not stated
Apr 19, 2024Panel upgradeMain Panel Replacement - Failed Main Beaker No meter work - No ESPA required Emergency…78733not stated
Mar 17, 2024Panel upgradeReplace Main Panel only - no meter work - emergency disconnect on 2-6-2024 Disconnect / Reconnect78733not stated
Mar 13, 2024Panel upgradeReplace old panel with current panel78733not stated
Mar 12, 2024Panel upgradeEmergency Disconnect - Replace Zesco Panel78757not stated
Mar 11, 2024Panel upgradeReplace Federal Pacific panel with Square D Main 200 amp78733not stated
Mar 11, 2024Panel upgradeRequest to Disconnect Replace Main Panel - No Meter work required78750not stated
Mar 8, 2024Panel upgradeEmergency disconnect - panel replacement78753not stated
Jan 19, 2024Panel upgradeReplace Main service panel due to rust and intermittent circuits78750not stated
Nov 28, 2023Panel upgradeReplace Main Electrical Panel with SPAN Smart(er) Panel. Add 200 Amp Main Disconnect. No meter…78723not stated
Nov 16, 2023Panel upgradeReplace Federal Pacific main panel78746not stated
Oct 11, 2023Panel upgradeMove meter drop to main home and upgrade to 200 amp meter and panel with main breaker78733not stated
Oct 9, 2023Panel upgradeNew service drop to main house78704not stated

What to ask before you hire

About Shipley Electric, LLC

  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any panel upgrade electrician

  • Can you show me proof of liability insurance and your bond?
  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Shipley Electric, LLC

Five quick questions. We pass your request to Shipley Electric, LLC.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Shipley Electric, LLC. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians near 78733 and 78757

See all 327 panel upgrade electricians in Austin, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.