contractors.fyi
Sign in

Velectric LLC

Panel upgrade electrician working in Austin.

  • License active

16 panel upgrade jobs on Austin permits, 2023 to 2026. 84th most panel upgrade permits of 327 contractors in Austin.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?Texas electrical contractor license 37722, valid until Jan 6, 2027We matched it by the phone on their permits.Checks out
Jobs on record16 panel upgrade jobs on Austin permits, 2023 to 2026Every permit we have for them is panel upgrade.84th most panel upgrade permits of 327 contractors in Austin. That counts jobs, not quality.Our Austin permit records cover September 2021 to September 2026.

Records: City of Austin permits.

Cost and timing

Permit timeline

Across Austin, a panel upgrade permit stays open about 62 days, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. Waiting for the permit adds about 6 days. How long panel upgrade jobs take.

Track record

5 jobs in the last 12 months, up from 2 the year before

Q1 2023: 2 jobsQ2 2023: 2 jobsQ3 2023: 1 jobQ4 2023: 1 jobQ1 2024: 1 jobQ2 2024: 1 jobQ3 2024: 2 jobsQ4 2024: 1 jobQ1 2026: 2 jobsQ2 2026: 1 jobQ3 2026: 2 jobsBusiest: 2 jobsBusiest: 2 jobs2023202420252026
Each bar is 3 months of permits. The tallest is 2 jobs, January to March 2023. Across Austin, all contractors together had 17% more panel upgrade jobs in the last 12 months than in the 12 months before.

Where they work most

  • 787313 jobs
  • 787342 jobs
  • 787592 jobs
  • 787321 job
  • 787461 job

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Aug 27, 2026Panel upgradeEmergency Main service repair78732not stated
Aug 17, 2026Panel upgradeThis job was an emergency disconnect; therefore the job has been completed78734not stated
Jun 15, 2026Panel upgradeEmergency Inspection was performed work complete78746not stated
Feb 19, 2026Panel upgradeRequest to disconnect Replace main panel on unit A and Unit B due to no main disconnect78745not stated
Feb 18, 2026Panel upgradeRemoving existing electrical panel and meter enclosure78759not stated
Oct 14, 2024Panel upgradeRequest to disconnect Remove existing Main disconnect with new 200 amp main breaker panel78747not stated
Sep 23, 2024Panel upgradeRequest to disconnect Replacing main panel with new 225 amp main breaker panel78735not stated
Sep 4, 2024Panel upgradeRemove Federal Pacific panel and replace with new 150 amp main breaker panel78744not stated
May 22, 2024Panel upgrade*Request to disconnect* Replace Federal Pacific panel and Existing 150 amp meter78731not stated
Jan 10, 2024Panel upgradeRequest to Disconnect Repair main panel due to: no main breaker78731not stated
Nov 3, 2023Panel upgrade**Emergency Permit** PEC is requiring a new meter and riser only to reconnect power78750not stated
Jul 13, 2023Panel upgradeRepair electrical panel due to winter storm damage78723not stated
May 30, 2023Panel upgradeRepair main panel due to old wiring and breakers78734not stated
Apr 24, 2023Panel upgradeReplace old electrical main panel due to outdated panel78731not stated
Feb 12, 2023Panel upgrade2023 Winter Weather Event Damage78759not stated
Feb 12, 2023Panel upgradeWinter Weather Event 2023. Rebuild Service78751not stated

What to ask before you hire

About Velectric LLC

  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any panel upgrade electrician

  • Can you show me proof of liability insurance and your bond?
  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Velectric LLC

Five quick questions. We pass your request to Velectric LLC.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Velectric LLC. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians near 78731 and 78734

See all 327 panel upgrade electricians in Austin, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.