John's Electric
license ELECT14-013230, mostly panel upgrade work
- 16 jobs in Cleveland, 2022 to 2026
- Typical permit value $3,500
- All 16 jobs are panel upgrades
Cleveland publishes no contractor license list we can check, so this page counts permits only. Ask for the license number and check it with the state before you hire.
Jobs by type of work
Most recent jobs
| Date | Work | ZIP |
|---|---|---|
| 2026-07-13 | Panel upgradeINSTALL 900 SQUARE: Install new 100amp service and rewire house to 2026 NEC electrical code ***BUILDING PERMIT NO BRB26-022069*** | 44105 |
| 2025-11-11 | Panel upgrade1,000 SQ. FT. INSTAL METER BASE/SERVICE. MAST AND BREAKER PANEL. INSTALL DUPLEX RECEPTACLES, SWITCHES AND LIGHT FIXTURES THROUGH-OUT HOUSE I | 44102 |
| 2025-10-07 | Panel upgrade1000 SQ FT - INSTALL 100 AMP METER BASE DISCONNECT FOR 1ST FLOOR INSTALL 200 AMP METER BASE DISCONNECT AND 200 AMP MAIN LUG PANEL FOR 2ND FL | 44102 |
| 2025-10-07 | Panel upgrade975 SQ FT - INSTALL 3 METER BASE DISCONNECTS 100 AMPS INSTALL 3 -100 AMP MAIN LUG PANELS. REWIRE ALL 3 UNITS TO 2025 NEC CODE. BUILDING PERM | 44110 |
| 2025-09-29 | Panel upgrade900 SQ. FT. CORRECT VIOLATION ON THE METERBASE/SERVICE PANEL | 44110 |
| 2025-05-30 | Panel upgradeMETR BASE/ SERVICE PANEL INSPECTION: INSTALL 3 100 AMP METER BASE DISCONNECTS INSTALL 3 100 AMP MAIN LUG PANELS REWIRE 3 UNITS TO 2025 NEC C | 44108 |
| 2025-05-30 | Panel upgradeMETER BASE / SERVICE PANEL INSPECTION: 900 SQUARE FEET INSTALL 100AMP DISCONNECT | 44105 |
| 2025-03-05 | Panel upgrade950 MAIN BREAKER PANELS FROM METER BASE WITH NEW 100 AMP ENTRY WIRE. RE-WIRE UPPER UNIT TO 2025 NEC CODE ADD 10 CIRCUITS FOR LOWER UNIT | 44120 |
| 2024-07-17 | Panel upgrade2,000 SQ FT - TOTAL REWIRE DUPLEX TO CODE, INSTALL 2 100 AMP METER BASE/DISCONNECTS, INSTALL 2 1-0 AMP MAIN LUG PANELS. BUILDING PERMIT NO. | 44103 |
| 2024-04-30 | Panel upgrade925 SQ FT - INSTALL NEW METER BASE/DISCONNECT AND 100 AMP MAIN LUG PANEL. REWIRE HOUSE TO CODE. | 44105 |
| 2024-04-30 | Panel upgrade950 SQ FT - INSTALL NEW METER BASE/DISCONNECT 100 AMP AND MAIN LUG 100 AMP PANEL REWIRE HOUSE TO CODE. | 44108 |
| 2024-01-30 | Panel upgrade950 SQ FT - REPLACE FEDERAL PACIFIC PANEL. | 44105 |
More panel upgrade electricians near 44105
- B.b.c. Electric Co Inc (the)
- Flt Construction, LLC
- A-1 Electric & Development
- Ks Electric LLC
- Cleveland Electrical LLC
- Teamwork Construction LLC
Get quotes from up to 3 panel upgrade electricians
Tell us about the job. Within one business day we email you up to 3 contractors who do this work near your ZIP code, and pass your request to them. You decide who to hire.
We got your request
Within one business day we will email you up to 3 contractors who fit, and pass your request to them.
Paying for your panel upgrade
Most people use a home equity line, a personal loan or the contractor's own financing. Compare the three.
See all 125 panel upgrade electriciansRanked by jobs in Cleveland