contractors.fyi
Sign in

Adu Concepts

ADU builder based in Tarzana. Licensed since 2016.

  • License active
  • Workers' comp on file

37 jobs on Los Angeles permits, 2023 to 2026: 23 ADUs, 6 home additions, 3 seismic retrofits, 3 remodels, 2 roofing jobs. 6th most ADU permits of 271 contractors in Los Angeles.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?License 1018294, active in the state's records on Sep 23, 2026General engineering, general buildingNo complaints or citations on the board's public record.Checks out
Workers' comp?Workers' comp policy on file with the stateThis covers their crew if someone is hurt. It is not insurance for your home.On file
In business?Licensed since 2016
Jobs on record37 jobs on Los Angeles permits, 2023 to 2026: 23 ADUs, 6 home additions, 3 seismic retrofits, 3 remodels, 2 roofing jobsThey are based in Tarzana. Work outside Los Angeles is not in these records.6th most ADU permits of 271 licensed contractors in Los Angeles. That counts jobs, not quality.Our Los Angeles permit records cover September 2023 to September 2026.

Records: the state license board and City of Los Angeles permits.

State license board record

No complaints or citations on the board's public record.

Source: California Contractors State License Board, checked Oct 4, 2026. Look up license 1018294 on CSLB

Cost and timing

Permit value (not a price)

Their typical permit lists $100,000 (half list more, half less)

That is the figure written on the permit form, which can be far from what you pay. What ADU jobs cost in Los Angeles.

Get 2 or 3 written quotes.

Permit timeline

Across Los Angeles, a ADU permit stays open about about 12 months, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. Waiting for the permit adds about about 4 months. How long ADU jobs take.

Track record

8 jobs in the last 12 months, down from 13 the year before

Q3 2023: 1 jobQ4 2023: 3 jobsQ1 2024: 3 jobsQ2 2024: 5 jobsQ3 2024: 4 jobsQ4 2024: 4 jobsQ1 2025: 8 jobsQ2 2025: 1 jobQ3 2025: 1 jobQ1 2026: 3 jobsQ2 2026: 2 jobsQ3 2026: 2 jobsBusiest: 8 jobs202420252026
Each bar is 3 months of permits. The tallest is 8 jobs, January to March 2025. Across Los Angeles, all contractors together had 1% more ADU jobs in the last 12 months than in the 12 months before.

Where they work most

  • 900255 jobs
  • 900424 jobs
  • 900312 jobs
  • 913562 jobs
  • 900492 jobs

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

A row marked ×2 or more stands for that many similar jobs on one day in one ZIP code.

DateWorkZIPOn the permit form
Sep 14, 2026ADU, 325 sq ftConvert (E) 325 sqft Storage space into ADU per GCS 65852.2 and90038$25,000
Sep 1, 2026ADUConvert portion of existing unit #1 into a 508 sf adu of an (e)90034$10,000
Jun 22, 2026ADUNew detached adu91335$90,000
May 4, 2026ADUConvert gym area into ADU of (E) apartment.PER GCS 65852.2(e)(190066$22,000
Feb 13, 2026ADUConvert Existing 4-Tuck-Under Parking to Attached ADU in existi90025$125,000
Feb 13, 2026ADUConvert Existing Tuck Under Parking into One ADU per ordinance90025$125,000
Jan 16, 2026ADUConvert existing garage to ADU90019$100,000
Sep 23, 2025ADUNew Detached ADU per ordinance90248$120,000
Apr 22, 2025Seismic retrofitSoft-Story seismic retrofit per LABC Chapter 93: VERIFY PROPOSED WORK DONE UNDER ADU CONVERSION…90025not stated
Mar 21, 2025Seismic retrofit (×2, same day)Soft-Story seismic retrofit per LABC Chapter 93: Verification of proposed work done under ADU…90025not stated each
Feb 27, 2025ADUNew detached ADU91601$120,000
Feb 10, 2025Reroof, 28 squares (2,800 sq ft)Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq91306$5,600
Feb 2, 2025ADUConvert (e) detached garage into a (n) 340 sf adu per gcs 6585290016$129,600
Jan 22, 2025AdditionConvert (E) storage space to accessory dwelling unit per LAMC 1290031$45,000
Jan 22, 2025ADUConvert (E) storage space to accessory dwelling unit per LAMC 1290031$45,000
Jan 9, 2025ADUNew 2 story detached ADUs( 2 units) (26'9"x38') and garage90008$250,000
Dec 30, 2024ADUNew 16'-5" x 37'-8" dettached accessory dwelling unit per gcs 65852.291367$80,000
Dec 26, 2024ADUNew 2-story, 2-unit detached accessory dwelling units90024$200,000
Dec 14, 2024ADUNew 2 story detached accessory dwelling unit with an attached s90043$162,000
Oct 25, 2024ADUNew detached ADUs with garage at first floor per state law GCS90042$275,000
Sep 5, 2024AdditionConversion of an (E) attached garage into two ADUs per state l90042$275,000
Sep 5, 2024ADUConversion of an (E) attached garage into two ADUs per state l90042$275,000
Jul 17, 2024Addition**ePlan** Addition and Remodel of (E) Single Family Dwelling91356$100,000
Jul 17, 2024ADUPROPOSED 2 STORY ADU PER GCS 65852.2(e)(1)(B) AND LAMC 12.22 A.391356$360,000
May 29, 2024Addition**ePlanLA** Convert existing aingle family dwelling into ADU and addit90049$75,000
May 29, 2024ADU**ePlanLA** Convert existing aingle family dwelling into ADU and addit90049$75,000
May 2, 2024AdditionConvert existing storage to ADU in existing apartment91405$40,000
May 2, 2024ADUConvert existing storage to ADU in existing apartment91405$40,000
Apr 2, 2024Reroof, 24 squares (2,400 sq ft)Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq91406$7,000
Mar 6, 2024ADUConvert storage space in (E) apartment to accessory dwelling uni90006$40,000
Feb 15, 2024Addition, 310 sq ftConvert storage/laundry to ADU in Multi-Family - 310 sqft91325$40,000
Feb 15, 2024ADU, 310 sq ftConvert storage/laundry to ADU in Multi-Family - 310 sqft91325$40,000
Dec 18, 2023Remodel1- bathroom remodel for residential buildings (no structural changes)90042$2,500
Nov 20, 2023ADUCONVERT (E) STORAGE ROOM TO AN ATTACHED ADU PER CA Govt90062$40,000
Oct 6, 2023Remodel1Kitchen/bathroom (2 ) remodel for residential buildings (no structural changes)91604$25,000
Aug 8, 2023RemodelInterior remodel to existing single-family dwelling including foundation reinforcement of footings,…91343$30,000

What to ask before you hire

About Adu Concepts

  • Ask what the warranty covers and for how long, in writing.

Worth asking any ADU builder

  • Can you show me proof of liability insurance and your bond?
  • Do you handle the plans, engineering and utility hookups, or do I?
  • How long from permit to the final inspection on your last three ADUs?
  • What is the payment schedule, and what is extra?

Get a quote from Adu Concepts

Five quick questions. We pass your request to Adu Concepts.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Adu Concepts. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More ADU builders near 90025 and 90042

See all 271 ADU builders in Los Angeles, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.