contractors.fyi
Sign in

Jarh Builders Corporation

ADU builder based in Paramount. Licensed since 2021.

  • License active
  • No workers' comp: the business told the state it has no employees

32 jobs on Los Angeles permits, 2023 to 2026: 14 ADUs, 10 remodels, 5 solar installations, 3 home additions. 14th most ADU permits of 271 contractors in Los Angeles.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?License 1074687, active in the state's records on Sep 23, 2026General buildingNo complaints or citations on the board's public record.Checks out
Workers' comp?No workers' comp: the business told the state it has no employeesThis covers their crew if someone is hurt. It is not insurance for your home.Ask them
In business?Licensed since 2021
Jobs on record32 jobs on Los Angeles permits, 2023 to 2026: 14 ADUs, 10 remodels, 5 solar installations, 3 home additionsThey are based in Paramount. Work outside Los Angeles is not in these records.14th most ADU permits of 271 licensed contractors in Los Angeles. That counts jobs, not quality.Our Los Angeles permit records cover September 2023 to September 2026.

Records: the state license board and City of Los Angeles permits.

State license board record

No complaints or citations on the board's public record.

Source: California Contractors State License Board, checked Oct 4, 2026. Look up license 1074687 on CSLB

Cost and timing

Permit value (not a price)

Their typical permit lists $135,000 (half list more, half less)

That is the figure written on the permit form, which can be far from what you pay. What ADU jobs cost in Los Angeles.

Get 2 or 3 written quotes.

Permit timeline

Across Los Angeles, a ADU permit stays open about about 12 months, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. Waiting for the permit adds about about 4 months. How long ADU jobs take.

Track record

20 jobs in the last 12 months, up from 8 the year before

Q2 2023: 1 jobQ2 2024: 2 jobsQ3 2024: 2 jobsQ4 2024: 3 jobsQ1 2025: 2 jobsQ3 2025: 3 jobsQ4 2025: 6 jobsQ1 2026: 8 jobsQ2 2026: 4 jobsQ3 2026: 1 jobBusiest: 8 jobs202420252026
Each bar is 3 months of permits. The tallest is 8 jobs, January to March 2026. Across Los Angeles, all contractors together had 1% more ADU jobs in the last 12 months than in the 12 months before.

Where they work most

  • 900037 jobs
  • 900116 jobs
  • 900493 jobs
  • 900023 jobs
  • 900662 jobs

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

A row marked ×2 or more stands for that many similar jobs on one day in one ZIP code.

DateWorkZIPOn the permit form
Sep 15, 2026ADUNEW 2-STORY ADUs (2UNITS) PER GCS 65852.2(e)(1)(D) AND LAMC 1290003$290,600
Jun 25, 2026AdditionMajor remodel keeping one wall of (e) sfd and (e) detached garage90066$200,000
Jun 18, 2026ADU(ePLAN) New detached 2-story accessory dwelling unit, 1 ADU on each fl90037$221,400
Jun 8, 2026ADUTwo new 33'-11.5" x 15'-4.5" detached accessory dwelling units on top90011$190,400
May 4, 2026Remodel(E) 1 STORY SINGLE FAMILY RESIDENCE . MAJOR REMODEL WITH FLOOR AREA ADDITION AND 2ND FLOOR…90049$915,000
Mar 5, 2026ADUSTORAGE CONVERSION TO ADU PER GCS 65852.2(e)(1)(C) CONVERSI90026$150,000
Mar 4, 2026ADUNEW 1- STORY DETACHED ADU #1 (Two ADUs per State Law, CA Govt90011$69,185
Feb 26, 2026ADUNEW 1-STORY DETACHED ADU #2 (Two ADUs per State Law, CA Govt90011$69,185
Feb 9, 2026ADUNew proposed two-story adu one on top of the other pergsc 658590003$226,000
Feb 7, 2026ADU(N) 2-STORY 2-UNIT ACCESSORY DWELLING UNIT CA Govt90018$200,000
Feb 6, 2026ADUProposed four car garage on ground floor & adu at the second floor per90744$120,000
Jan 8, 2026Solar (×2, same day)Supplemental to #21010-10000-06231 to update title 24 to show all electric, without pv system90011not stated
Dec 23, 2025ADUNEW DETACHED ACCESSORY DWELLING UNIT PER CA Govt90002$71,000
Dec 23, 2025ADUConvert attached garage of an (e) duplex to an accessory dwelling unit90002$70,000
Dec 18, 2025ADUProposed new 2 story building, adu over carport structure at the back90002$120,000
Oct 8, 2025AdditionDemo all interior walls & portions of ceiling w/ (e) roof & exterior w91604$280,000
Oct 1, 2025AdditionCONVERTING EXISTING ONE STORY DETACHED GARAGE TO AN ADU WITH ADDTION p90003$120,000
Oct 1, 2025ADUCONVERTING EXISTING ONE STORY DETACHED GARAGE TO AN ADU WITH ADDTION p90003$120,000
Sep 23, 2025ADUNEW TWO-UNIT, 2-STORY ADU PER GCS 65852.2(e)(1)(D) AND LAMC 12.290003$300,000
Aug 7, 2025SolarSupplemental to 23010-10000-04686- to revised title 24 report- removal of pv combo from required…90003not stated
Jul 30, 2025RemodelAddition of an attached adu on the second floor and remodel and replace the (e) two car carport…90062$167,600
Feb 28, 2025RemodelKITCHEN and 2--BATHROOM remodel for residential buildings (no structural changes)90744$25,000
Feb 10, 2025SolarSupplemental to: 24010-10000-00593 to remove solar panel pv systems per revised t2490062not stated
Dec 30, 2024SolarSupplemental permit 21010-10000-03434.removal of solar panels per revised title 24 energy report90003$5,000
Nov 14, 2024RemodelRemodel of existing single family dwelling to remove a load bearing wall between the kitchen and…90042$3,500
Oct 10, 2024Remodel<ePLAN>ADDITION AND MAJOR REMODEL TO (E) DUPLEX TO ADD A 2ND STORY AND CREATE AN ATTACHED GARAGE:…90011$738,000
Sep 24, 2024Remodel1 Kitchen/bathroom (2 ) remodel for residential buildings (no structural changes). Window…90042$19,000
Sep 11, 2024Remodel***e-plan***major remodel and addition with open trellis at rear of building, from one single…90272$650,600
May 28, 2024Remodel**ePlan**INTERIOR REMODEL OF (E) S.F.D. W/ ATTACHED GARAGE, SCOPE OF WORK TO INCLUDE: INTERIOR…90049$25,000
Apr 3, 2024RemodelReplace 10 window(s). Same size, location, number, type90049$23,001
Jun 30, 2023RemodelMajor remodel keeping one wall of (e) sfd and (e) detached garage90066$200,000

What to ask before you hire

About Jarh Builders Corporation

  • Ask who will do the work. Anyone they pay to work on your home must be covered by workers' comp.
  • Ask what the warranty covers and for how long, in writing.

Worth asking any ADU builder

  • Can you show me proof of liability insurance and your bond?
  • Do you handle the plans, engineering and utility hookups, or do I?
  • How long from permit to the final inspection on your last three ADUs?
  • What is the payment schedule, and what is extra?

Get a quote from Jarh Builders Corporation

Five quick questions. We pass your request to Jarh Builders Corporation.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Jarh Builders Corporation. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More ADU builders near 90003 and 90011

See all 271 ADU builders in Los Angeles, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.