contractors.fyi
Sign in

So Cal Construction Enterprises Inc

ADU builder based in San Gabriel. Licensed since 2004.

  • License active
  • Workers' comp on file

39 jobs on Los Angeles permits, 2023 to 2026: 15 ADUs, 10 home additions, 9 remodels, 3 roofing jobs, 2 solar installations. 12th most ADU permits of 271 contractors in Los Angeles.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?License 832488, active in the state's records on Sep 23, 2026General buildingNo complaints or citations on the board's public record.Checks out
Workers' comp?Workers' comp policy on file with the stateThis covers their crew if someone is hurt. It is not insurance for your home.On file
In business?Licensed since 2004
Jobs on record39 jobs on Los Angeles permits, 2023 to 2026: 15 ADUs, 10 home additions, 9 remodels, 3 roofing jobs, 2 solar installationsThey are based in San Gabriel. Work outside Los Angeles is not in these records.12th most ADU permits of 271 licensed contractors in Los Angeles. That counts jobs, not quality.Our Los Angeles permit records cover September 2023 to September 2026.

Records: the state license board and City of Los Angeles permits.

State license board record

No complaints or citations on the board's public record.

Source: California Contractors State License Board, checked Oct 4, 2026. Look up license 832488 on CSLB

Cost and timing

Permit value (not a price)

Their typical permit lists $179,000 (half list more, half less)

That is the figure written on the permit form, which can be far from what you pay. What ADU jobs cost in Los Angeles.

Get 2 or 3 written quotes.

Permit timeline

Across Los Angeles, a ADU permit stays open about about 12 months, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. Waiting for the permit adds about about 4 months. How long ADU jobs take.

Track record

16 jobs in the last 12 months, about the same as 16 the year before

Q3 2023: 2 jobsQ4 2023: 1 jobQ2 2024: 4 jobsQ3 2024: 1 jobQ1 2025: 5 jobsQ2 2025: 4 jobsQ3 2025: 9 jobsQ4 2025: 4 jobsQ1 2026: 4 jobsQ2 2026: 2 jobsQ3 2026: 3 jobsBusiest: 9 jobs202420252026
Each bar is 3 months of permits. The tallest is 9 jobs, July to September 2025. Across Los Angeles, all contractors together had 1% more ADU jobs in the last 12 months than in the 12 months before.

Where they work most

  • 9001112 jobs
  • 900039 jobs
  • 900446 jobs
  • 900635 jobs
  • 913642 jobs

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Jul 18, 2026Reroof, 12 squares (1,200 sq ft)90003$10,080
Jul 18, 2026Remodel, 12 squares (1,200 sq ft)90003$10,080
Jul 18, 2026RemodelReplacement of damaged framing members (less than 10% of replacement cost of building) for single…90003$12,801
May 18, 2026Solar, 2.7 kW[ePlan] Roof mounted solar PV1 system with 6 modules and 3 microinverters90033not stated
May 18, 2026Solar, 2.4 kW[ePlan] Roof mounted solar PV1 system with 6 modules and 3 microinverters91364not stated
Feb 10, 2026ADUNEW DETACHED TWO ACCESSORY DWELLING UNITS PER CA Govt90063$168,000
Jan 26, 2026AdditionMajor remodel and addition to existing 1-story single family dwelling90003$49,790
Jan 26, 2026ADUNew detached two story two unit accessory dwelling units per state law90003$180,000
Jan 9, 2026ADU, 884 sq ftCONSTRUCT NEW 2 STORY DETACH 2-ADUs PER STATE LAW EACH UNIT: 884 SQFT90044$220,000
Dec 27, 2025AdditionConvert the existing SFD into a new Duplex with an addition90063$32,000
Dec 27, 2025ADUTwo detached ADU90063$180,000
Nov 16, 2025ADUConstruct a new detached 2 story structure with 2 new adu90044$190,000
Oct 23, 2025AdditionInterior remodel and addition to an existing sfd to convert it into a90044$48,900
Sep 21, 2025AdditionMajor remodel and convert existing sfd to duplex, no parking required90011$120,000
Sep 21, 2025ADUProposed new two story two unit accessory dwelling unit per state law90011$175,000
Sep 21, 2025ADUNew 1 story (2) unit adu per ca govt code 65852.2 (e)(1)(c), no parkin90011$232,000
Sep 13, 2025AdditionNew addition to an (e) sfd90063$90,000
Sep 13, 2025ADU(n) detached adu90063$50,000
Aug 27, 2025RemodelInterior remodel consist of convetrt existing single family dwelling with attached carport to a…91364$60,000
Aug 21, 2025AdditionAddition and convert (e) single family dwelling to (n) 1-story duplex90003$35,000
Jul 16, 2025AdditionConvert an existing single family dwelling into a new duplex with a fr90023$60,000
Jul 16, 2025ADUConstruct a 2-story detached duplex (2 adu's) one adu at each floor pe90023$220,000
Jun 30, 2025Reroof, 8 squares (800 sq ft)90044$5,500
May 14, 2025RemodelInterior remodel and addition to an existing sfd to convert it into a new duplex90044$48,900
May 3, 2025ADU(N) 1-STORY 2-ACCESSORY DWELLING UNITS PER GCS65852.2(e)(1)(D) & LAMC90011$179,000
Apr 24, 2025RemodelINTERIOR REMODEL & convert AN EXISTING S.F.D. to A NEW DUPLEX. 1 OF 290044$44,500
Mar 28, 2025Reroof, 17 squares (1,700 sq ft)90011$3,400
Mar 6, 2025RemodelMajor remodel and addition to existing 1-story single family dwelling to become a duplex90003$49,790
Feb 26, 2025RemodelMajor remodel and convert existing sfd to duplex, no parking required per ab2097, and per wfpp…90011$120,000
Jan 29, 2025AdditionConvert existing sfd into new duplex with addition90003$80,000
Jan 29, 2025ADUNEW DETACHED 2-STORY 2 NEW ADUs, ONE UNIT PER LEVEL. ADU CHECKED PER90003$160,000
Sep 25, 2024ADU(N) 2-STORY 2-UNIT ACCESSORY DWELLING UNIT PER CA Govt90011$30,600
Jun 14, 2024AdditionConvert an (e) single story sfd into a new duplex with a rear addition90011$25,654
Jun 14, 2024ADUTWO NEW DETACHED ADUs PER CA Govt90011$182,709
May 16, 2024RemodelKitchen (2)/bathroom (2) remodel for residential buildings (no structural changes). "COMPLY WITH…90011$15,000
May 15, 2024ADUConvert existing detached garage to accessory dwelling90031$75,000
Nov 30, 2023RemodelInterior remodel (walls & ceiling) for new office and packaging area in existing urm building90001$40,000
Sep 27, 2023Addition2 (n) 1-story ADUs per GCS 65852.2(e)(1)(A) and LAMC 12.22 A.33 (c)(d)90011$175,278
Sep 27, 2023ADU2 (n) 1-story ADUs per GCS 65852.2(e)(1)(A) and LAMC 12.22 A.33 (c)(d)90011$175,278

What to ask before you hire

About So Cal Construction Enterprises Inc

  • Ask what the warranty covers and for how long, in writing.

Worth asking any ADU builder

  • Can you show me proof of liability insurance and your bond?
  • Do you handle the plans, engineering and utility hookups, or do I?
  • How long from permit to the final inspection on your last three ADUs?
  • What is the payment schedule, and what is extra?

Get a quote from So Cal Construction Enterprises Inc

Five quick questions. We pass your request to So Cal Construction Enterprises Inc.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to So Cal Construction Enterprises Inc. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More ADU builders near 90011 and 90003

See all 271 ADU builders in Los Angeles, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.