contractors.fyi
Sign in

Advanced Construction

ADU builder based in Sherman Oaks. Licensed since 2001.

  • License active
  • Workers' comp on file

21 jobs on Los Angeles permits, 2023 to 2026: 14 ADUs, 4 remodels, 1 pool or spa, 1 solar installation, 1 roofing job. 13th most ADU permits of 271 contractors in Los Angeles.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?License 801955, active in the state's records on Sep 23, 2026General buildingNo complaints or citations on the board's public record.Checks out
Workers' comp?Workers' comp policy on file with the stateThis covers their crew if someone is hurt. It is not insurance for your home.On file
In business?Licensed since 2001
Jobs on record21 jobs on Los Angeles permits, 2023 to 2026: 14 ADUs, 4 remodels, 1 pool or spa, 1 solar installation, 1 roofing jobThey are based in Sherman Oaks. Work outside Los Angeles is not in these records.13th most ADU permits of 271 licensed contractors in Los Angeles. That counts jobs, not quality.Our Los Angeles permit records cover September 2023 to September 2026.

Records: the state license board and City of Los Angeles permits.

State license board record

No complaints or citations on the board's public record.

Source: California Contractors State License Board, checked Oct 4, 2026. Look up license 801955 on CSLB

Cost and timing

Permit value (not a price)

Their typical permit lists $393,250 (half list more, half less)

That is the figure written on the permit form, which can be far from what you pay. What ADU jobs cost in Los Angeles.

Get 2 or 3 written quotes.

Permit timeline

Across Los Angeles, a ADU permit stays open about about 12 months, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. Waiting for the permit adds about about 4 months. How long ADU jobs take.

Track record

3 jobs in the last 12 months, down from 9 the year before

Q3 2023: 3 jobsQ1 2024: 2 jobsQ2 2024: 4 jobsQ4 2024: 1 jobQ1 2025: 3 jobsQ2 2025: 4 jobsQ3 2025: 1 jobQ2 2026: 3 jobsBusiest: 4 jobsLatest: 3 jobs202420252026
Each bar is 3 months of permits. The tallest is 4 jobs, April to June 2024. Across Los Angeles, all contractors together had 1% more ADU jobs in the last 12 months than in the 12 months before.

Where they work most

  • 916013 jobs
  • 916043 jobs
  • 900163 jobs
  • 900192 jobs
  • 900112 jobs

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Jun 18, 2026ADUNew two story 23'-2" x 17' accessory dwelling unit per lamc 12.22 a.3391331$115,000
May 26, 2026ADUNew 2-story ADU at rear of the lot per GCS 65852.2(e)(1)(D) AND LAMC 190731$205,000
Apr 9, 2026ADUNew 2-story sfd w/ attached 2 car garage and attached adu per gov code91601$391,000
Sep 11, 2025ADUNew 45'9-1/2" x 38' three story sfd with attached accessory dwelling91606$600,000
Jun 6, 2025Pool or spaNew 21'-4" x 12'-4" pool and 9'-0" x 12'-4" spa per standard pl91604$30,000
Jun 6, 2025ADUNew 2-story sfd with attached 2-car garage and adu per lamc 1291604$710,000
May 25, 2025ADUConvert detached garage into accessory dwelling unit per lamc 12.22 a90062$25,000
Apr 28, 2025ADUNew 3 story sfd with 1st floor adu (1263 sf) per 12.22 a33 c & e90016$704,000
Mar 30, 2025ADUNew 2- Story two ADUs90016$63,000
Mar 10, 2025ADUNew 3-story duplex and adu (877sf) (rear) 2 of 290019$583,757
Feb 26, 2025RemodelRemodel (e) 1-story sfd, all work per wfpp90003$20,000
Oct 10, 2024ADUNew two story sfd and attached adu and one car garage 2 of 290019$445,000
Jun 24, 2024ADU(N) 3-STORY DUPLEX AND ADU ATTACHED PER GCS 65852.2(e)(1)(C) (REAR BLD90016$150,000
Jun 11, 2024ADUNew 3 story duplex with adu (937 sf) per 12.22 a33 c & e (rear)90011$395,500
May 22, 2024Remodel*No fee Department ErrorSupplemental permit to 21014-20000-04517 to revise work decription to…91344not stated
May 7, 2024Solar, 2.97 kWNEW 2-STORY SFD WITH ATTACHED 2-CAR GARAGE AND ADU PER LAMC 12.22.A.33(c)-(d). NFPA 13DSOLAR…91604$710,000
Jan 16, 2024ADUNew 3 story sfd with attached garage and adu per 12.22 a 33 c & e91601$591,000
Jan 13, 2024ADUCONVERT (E) 36'-0" x 38'-0" ATTACHED GARAGE TO AN ACCESSORY DWELLING U90011$100,000
Sep 26, 2023Reroof, 22 squares (2,200 sq ft)Re-roof with Class A or B material weighing less than 6 pounds per sq90044$10,000
Aug 9, 2023RemodelNo details on the permit90044$5,000
Jul 11, 2023RemodelSupplemental to 21010-10000-04029 to add 1/2 bathroom and remodel another bathroom on the first…91601$3,000

What to ask before you hire

About Advanced Construction

  • Ask what the warranty covers and for how long, in writing.

Worth asking any ADU builder

  • Can you show me proof of liability insurance and your bond?
  • Do you handle the plans, engineering and utility hookups, or do I?
  • How long from permit to the final inspection on your last three ADUs?
  • What is the payment schedule, and what is extra?

Get a quote from Advanced Construction

Five quick questions. We pass your request to Advanced Construction.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Advanced Construction. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More ADU builders near 91601 and 91604

See all 271 ADU builders in Los Angeles, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.