contractors.fyi
Sign in

Mamos Construction & Design

ADU builder based in Woodland Hills. Licensed since 2022.

  • License active
  • Workers' comp on file

17 jobs on Los Angeles permits, 2023 to 2026: 7 ADUs, 4 home additions, 3 roofing jobs, 3 remodels. 53rd most ADU permits of 271 contractors in Los Angeles.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?License 1092889, active in the state's records on Sep 23, 2026General buildingNo complaints or citations on the board's public record.Checks out
Workers' comp?Workers' comp policy on file with the stateThis covers their crew if someone is hurt. It is not insurance for your home.On file
In business?Licensed since 2022
Jobs on record17 jobs on Los Angeles permits, 2023 to 2026: 7 ADUs, 4 home additions, 3 roofing jobs, 3 remodelsThey are based in Woodland Hills. Work outside Los Angeles is not in these records.53rd most ADU permits of 271 licensed contractors in Los Angeles. That counts jobs, not quality.Our Los Angeles permit records cover September 2023 to September 2026.

Records: the state license board and City of Los Angeles permits.

State license board record

No complaints or citations on the board's public record.

Source: California Contractors State License Board, checked Oct 4, 2026. Look up license 1092889 on CSLB

Cost and timing

Permit value (not a price)

Their typical permit lists $60,000 (half list more, half less)

That is the figure written on the permit form, which can be far from what you pay. What ADU jobs cost in Los Angeles.

Get 2 or 3 written quotes.

Permit timeline

Across Los Angeles, a ADU permit stays open about about 12 months, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. Waiting for the permit adds about about 4 months. How long ADU jobs take.

Track record

10 jobs in the last 12 months, up from 5 the year before

Q3 2023: 1 jobQ4 2023: 1 jobQ4 2024: 1 jobQ1 2025: 3 jobsQ3 2025: 1 jobQ4 2025: 2 jobsQ1 2026: 2 jobsQ2 2026: 5 jobsQ3 2026: 1 jobBusiest: 5 jobs202420252026
Each bar is 3 months of permits. The tallest is 5 jobs, April to June 2026. Across Los Angeles, all contractors together had 1% more ADU jobs in the last 12 months than in the 12 months before.

Where they work most

  • 900353 jobs
  • 900643 jobs
  • 913162 jobs
  • 916052 jobs
  • 900192 jobs

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

A row marked ×2 or more stands for that many similar jobs on one day in one ZIP code.

DateWorkZIPOn the permit form
Aug 27, 2026AdditionProposed two story addition to (e) 1 story single famiyl dwelling91316$165,000
May 19, 2026Reroof, 24 squares (2,400 sq ft)Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq91316$9,000
May 11, 2026RemodelRemodel to convert the (e) breakfast room to a (n) bedroom90035$45,000
Apr 28, 2026AdditionTwo story ADU addition to the existing detached garage per LAMC 12.22A90064$70,000
Apr 28, 2026ADUTwo story ADU addition to the existing detached garage per LAMC 12.22A90064$70,000
Apr 27, 2026AdditionTwo story addition and new 2nd floor to (e) 1 story SFD. 1 of 290064$180,000
Feb 23, 2026Addition**proposed conversion of garage to two accessory dwelling units90035$175,000
Feb 23, 2026ADU**proposed conversion of garage to two accessory dwelling units90035$175,000
Nov 14, 2025ADU (×2, same day)Convert existing attached garage to new accessory dwelling uni91605$60,000 each
Aug 14, 2025ADUConvert (e) detached carport into 2 accessory dwelling units pe90044$90,000
Mar 28, 2025ADUConvert (e) attached garage to second (n) accessory dwelling unit per90019$30,000
Mar 14, 2025ADUConvert the existing attached 4 car garage into an ADU90019$30,000
Feb 24, 2025RemodelRemodel unit 1F on first floor of an (E) non-sprinklered two-story duplex and convert 525 sf…90037$30,000
Nov 21, 2024Reroof, 3900 squares (390,000 sq ft)Re-roof with Class A or B material weighing less than 6 pounds per sq90011$12,000
Dec 19, 2023Reroof"COMPLY WITH DEPARTMENT ORDER effective date10/23/2023. PERMIT WILL EXPIRE 30 DAYS FROM ISSUANCE…91356$9,500
Jul 19, 2023Remodel2 kitchen / 1 bathroom remodels90018not stated

What to ask before you hire

About Mamos Construction & Design

  • Ask what the warranty covers and for how long, in writing.

Worth asking any ADU builder

  • Can you show me proof of liability insurance and your bond?
  • Do you handle the plans, engineering and utility hookups, or do I?
  • How long from permit to the final inspection on your last three ADUs?
  • What is the payment schedule, and what is extra?

Get a quote from Mamos Construction & Design

Five quick questions. We pass your request to Mamos Construction & Design.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Mamos Construction & Design. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More ADU builders near 90035 and 90064

See all 271 ADU builders in Los Angeles, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.