contractors.fyi
Sign in

Potter, Roger Construction

ADU builder working in Nashville.

  • Nashville publishes no contractor license list we can check

10 jobs on Nashville permits, 2024 to 2026: 7 ADUs, 2 pools and spas, 1 home addition. 13th most ADU permits of 59 contractors in Nashville.

What the public records show

From the city's permits, one question at a time.

QuestionRecords showMark
Licensed?Nashville publishes no contractor license list we can checkThat says nothing about this business either way.Ask them
Jobs on record10 jobs on Nashville permits, 2024 to 2026: 7 ADUs, 2 pools and spas, 1 home addition13th most ADU permits of 59 contractors in Nashville. That counts jobs, not quality.Our Nashville permit records cover September 2023 to September 2026.

Records: City of Nashville permits.

Cost and timing

Permit value (not a price)

Their typical permit lists $151,860 (half list more, half less)

That is the figure written on the permit form, which can be far from what you pay. What ADU jobs cost in Nashville.

Get 2 or 3 written quotes.

Permit wait

Across Nashville, ADU permits usually take 40 days to be issued

How long ADU jobs take.

Track record

4 jobs in the last 12 months, about the same as 4 the year before

Q1 2024: 1 jobQ2 2024: 1 jobQ1 2025: 1 jobQ2 2025: 3 jobsQ4 2025: 1 jobQ1 2026: 1 jobQ3 2026: 2 jobsBusiest: 3 jobs202420252026
Each bar is 3 months of permits. The tallest is 3 jobs, April to June 2025. Across Nashville, all contractors together had 45% more ADU jobs in the last 12 months than in the 12 months before.

Where they work most

  • 372127 jobs
  • 372042 jobs
  • 372051 job

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Jul 2, 2026ADUTo amend permit #2024088560 to convert 2nd floor space to a detached accessory dwelling unit…37212$6,500
Jul 2, 2026Pool or spaTo amend permit #2024088560 to convert 2nd floor space to a detached accessory dwelling unit…37212$6,500
Feb 25, 2026ADUTo construct a DADU according to submitted plans37212$151,860
Nov 24, 2025ADU(New permit for previously expired permit #T2024107001) To construct an accessory building with…37205$192,788
Jun 12, 2025ADU, 750 sq ftTo construct a two-story detached accessory garage (750 sq ft footprint) with a pool cabana,…37212$105,543
Jun 12, 2025Pool or spa, 750 sq ftTo construct a two-story detached accessory garage (750 sq ft footprint) with a pool cabana,…37212$105,543
May 1, 2025AdditionTo construct an addition to the rear of existing single family home37212$399,506
Feb 4, 2025ADU**** To construct a dethatched garage with finished accessory space above37212$161,646
Jun 18, 2024ADUTo construct a dadu square footage is 997 Garage sq footage is 700 Living sq footage37204$133,023
Mar 18, 2024ADUTo construct a dadu square footage is 700 footprint Garage sq footage is 644 Living sq footage is…37204$171,899

What to ask before you hire

About Potter, Roger Construction

  • Ask for their license number and check it with the state.
  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any ADU builder

  • Can you show me proof of liability insurance and your bond?
  • Do you handle the plans, engineering and utility hookups, or do I?
  • How long from permit to the final inspection on your last three ADUs?
  • What is the payment schedule, and what is extra?

Get a quote from Potter, Roger Construction

Five quick questions. We pass your request to Potter, Roger Construction.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Potter, Roger Construction. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More ADU builders near 37212 and 37204

See all 59 ADU builders in Nashville, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.