contractors.fyi
Sign in

Griffin Electric Inc

Panel upgrade electrician working in Sacramento.

  • No license matched this business by name in the state's records

51 jobs on Sacramento permits, 2021 to 2026: 34 panel upgrades, 17 EV charger installations. 42nd most panel upgrade permits of 377 contractors in Sacramento.

What the public records show

From the city's permits, one question at a time.

QuestionRecords showMark
Licensed?No license matched this business by name in the state's recordsAsk them
Jobs on record51 jobs on Sacramento permits, 2021 to 2026: 34 panel upgrades, 17 EV charger installations42nd most panel upgrade permits of 377 contractors in Sacramento. That counts jobs, not quality.Our Sacramento permit records cover September 2021 to August 2026.

Records: City of Sacramento permits.

Cost and timing

Permit value (not a price)

Their typical permit lists $4,000 (half list more, half less)

That is the figure written on the permit form, which can be far from what you pay. What panel upgrade jobs cost in Sacramento.

Get 2 or 3 written quotes.

Track record

5 jobs in the last 12 months, down from 9 the year before

Q4 2021: 3 jobsQ2 2022: 1 jobQ3 2022: 2 jobsQ4 2022: 4 jobsQ1 2023: 2 jobsQ2 2023: 10 jobsQ3 2023: 6 jobsQ4 2023: 1 jobQ1 2024: 3 jobsQ2 2024: 1 jobQ3 2024: 4 jobsQ4 2024: 4 jobsQ1 2025: 3 jobsQ2 2025: 1 jobQ3 2025: 1 jobQ1 2026: 1 jobQ2 2026: 3 jobsQ3 2026: 1 jobBusiest: 10 jobsLatest: 1 job20222023202420252026
Each bar is 3 months of permits. The tallest is 10 jobs, April to June 2023. Across Sacramento, all contractors together had 3% more panel upgrade jobs in the last 12 months than in the 12 months before.

Where they work most

  • 9583510 jobs
  • 958227 jobs
  • 958335 jobs
  • 958194 jobs
  • 958174 jobs

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Jul 2, 2026Panel upgradeE-Permit: existing 200 A service - Overhead service, adding 4 outlets (120V), adding 1 ceiling…95819$3,700
May 11, 2026Panel upgrade95822$5,550
Apr 3, 2026Panel upgradeEpc - install cust95818$1,894
Apr 3, 2026EV chargerEpc - install cust95818$1,894
Mar 2, 2026Panel upgrade95826$5,500
Aug 11, 2025Panel upgradeE-Permit: existing 100 A service - Overhead service, Reuse Existing weather head/masthead work,…95833$2,022
Apr 14, 2025Panel upgrade95820$2,363
Mar 11, 2025Panel upgrade95833$7,000
Mar 7, 2025Panel upgradeMPU from 100a to 200a, repair panel due to burnt buss bar95822$6,800
Jan 6, 2025Panel upgradeElectrical Permit: Upgrade panel from 100 amps to 200 amps95822$5,119
Dec 18, 2024EV chargerInstall 32a EV charger on exterior of home95817not stated
Oct 22, 2024Panel upgrade, 1102 squares (110,200 sq ft)E-Permit: existing 125 A service - Overhead service, Reuse Existing weather head/masthead work,…95819$19,186
Oct 11, 2024Panel upgradeInstall 50A, LV2 EV CHARGER. Install 200a subpanel95816$1,313
Oct 11, 2024EV chargerInstall 50A, LV2 EV CHARGER. Install 200a subpanel95816$1,313
Aug 16, 2024Panel upgradeElectrical Permit: Remove and replace (E) 125A Zinsco main service panel95831$5,014
Jul 23, 2024EV chargerInstall dedicated 40a circuit for EV charger95831$3,183
Jul 9, 2024Panel upgradeNo details on the permit95819$1,348
Jul 9, 2024EV chargerNo details on the permit95819$1,348
Apr 8, 2024Panel upgrade95838$5,321
Feb 2, 2024Panel upgrade95816$19,826
Jan 18, 2024Panel upgradeInstall cust, supplied 240M 48A LVL2 EV Charger on (Nidedicated 240v 60A 2P breaker/circuit in…95835$2,263
Jan 18, 2024EV chargerInstall cust, supplied 240M 48A LVL2 EV Charger on (Nidedicated 240v 60A 2P breaker/circuit in…95835$2,263
Nov 16, 2023Panel upgrade95838$5,747
Sep 12, 2023Panel upgradeInstall cust provided 240v 32amp juicebox level 2 ev charger on new 40a 2p 240v dedicated breaker…95817$1,597
Sep 12, 2023EV chargerInstall cust provided 240v 32amp juicebox level 2 ev charger on new 40a 2p 240v dedicated breaker…95817$1,597
Aug 16, 2023EV chargerINSTALL 240V 50A LEVEL 2 EV CHARGER ON A NEW 70A 240V 2P DEDICATED CIRCUIT INSIDE GARAGE. Water…95817$1,028
Aug 10, 2023Panel upgradeAA: existing 100 A service - Underground service, new main panel 200 Amps, N/A weather…95833$7,663
Jul 3, 2023Panel upgradeRemove existing 100A 120/240V 1PH - surface mount, overhead feed, Service Panel and replace with…95815$5,903
Jul 3, 2023EV chargerRemove existing 100A 120/240V 1PH - surface mount, overhead feed, Service Panel and replace with…95815$5,903
Jun 28, 2023Panel upgrade95815$5,903
Jun 20, 2023Panel upgradeInstall C/S 240V 48A EV Charger LVL2 on dedicated 240V 60A circuit in existing 200A 120/240V 1PH…95834$1,084
Jun 20, 2023EV chargerInstall C/S 240V 48A EV Charger LVL2 on dedicated 240V 60A circuit in existing 200A 120/240V 1PH…95834$1,084
Jun 2, 2023Panel upgradeNo details on the permit95835not stated
Jun 2, 2023EV chargerNo details on the permit95835not stated
May 25, 2023Panel upgradeInstall 240V 50A EV Charger on a dedicated 70S 2P circuit95835$2,655
May 25, 2023EV chargerInstall 240V 50A EV Charger on a dedicated 70S 2P circuit95835$2,655
Apr 19, 2023Panel upgradeNo details on the permit95835$1,722
Apr 19, 2023EV chargerNo details on the permit95835$1,722
Apr 14, 2023Panel upgradeE-Permit: existing 200 A service - Overhead service, Replacement weather head/masthead work,…95833$2,655
Feb 7, 2023Panel upgradeNo details on the permit95822$1,598

What to ask before you hire

About Griffin Electric Inc

  • Ask for the license number and check it with the state.
  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any panel upgrade electrician

  • Can you show me proof of liability insurance and your bond?
  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Griffin Electric Inc

Five quick questions. We pass your request to Griffin Electric Inc.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Griffin Electric Inc. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians near 95835 and 95822

See all 377 panel upgrade electricians in Sacramento, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.