High End Electric

, mostly panel upgrade work

  • 372 jobs in Sacramento, 2021 to 2026
  • Typical permit value $3,900
  • 302 of 372 jobs are panel upgrades

Sacramento publishes no contractor license list we can check, so this page counts permits only. Ask for the license number and check it with the state before you hire.

Jobs by type of work

Most recent jobs

DateWorkZIPStated value
2026-08-21Panel upgrade40 Amp EV charger circuit installation in garage, behind the main electrical panel , hardwired directly to the charger, using 6 feet of 8 aw95834$1,150
2026-08-21EV charger40 Amp EV charger circuit installation in garage, behind the main electrical panel , hardwired directly to the charger, using 6 feet of 8 aw95834$1,150
2026-08-21Panel upgrade40 amp, GFCI breaker, for a Ev charger circuit installation. Installed a 8 awg copper (8/2 NMB romex), directly. Mer the crawl space, from t95817$1,600
2026-08-21EV charger40 amp, GFCI breaker, for a Ev charger circuit installation. Installed a 8 awg copper (8/2 NMB romex), directly. Mer the crawl space, from t95817$1,600
2026-08-21Panel upgrade40 Amp EV charger circuit installation. Installation of 8 awg THHN (4 feet) + 10 awg ground (4 feet) ; that is wired direct from the 40 amp 95835$1,150
2026-08-21EV charger40 Amp EV charger circuit installation. Installation of 8 awg THHN (4 feet) + 10 awg ground (4 feet) ; that is wired direct from the 40 amp 95835$1,150
2026-08-10Panel upgradeE-Permit: existing 100 A service - Overhead service, new main panel 200 Amps, New Install weather head/masthead work.95838$4,500
2026-08-10Panel upgradeE-Permit: existing 100 A service - Overhead service, new main panel 200 Amps, New Install weather head/masthead work.95838$4,500
2026-08-10EV chargerEPC - Electric Vehicle Charger Circuit. Water conserving fixtures are required to be installed throughout this residence per SB 407 (Note: R95818$1,800
2026-08-05EV chargerEPC - Electric Vehicle Circuit. Water conserving fixtures are required to be installed throughout this residence per SB 407 (Note: Residence95826$1,800
2026-07-30Panel upgradeE-Permit: existing 100 A service - Overhead service, new main panel 200 Amps, New Install weather head/masthead work.95820$3,700
2026-07-30Panel upgradeE-Permit: existing 100 A service - Overhead service, new main panel 200 Amps, New Install weather head/masthead work, rewiring 900 sq ft.95819$21,500

More panel upgrade electricians near 95820

Get quotes from up to 3 panel upgrade electricians

Tell us about the job. Within one business day we email you up to 3 contractors who do this work near your ZIP code, and pass your request to them. You decide who to hire.

When do you want to start?

We got your request

Within one business day we will email you up to 3 contractors who fit, and pass your request to them.

Paying for your panel upgrade

Most people use a home equity line, a personal loan or the contractor's own financing. Compare the three.

Circuit breakers in a neatly wired electrical panelSee all 377 panel upgrade electriciansRanked by jobs in Sacramento