contractors.fyi
Sign in

Huft Heating and Air Conditioning Inc

Panel upgrade electrician working in Sacramento.

  • No license matched this business by name in the state's records

293 jobs on Sacramento permits, 2021 to 2026: 156 panel upgrades, 94 heat pump installations, 42 EV charger installations, 1 pool or spa. 4th most panel upgrade permits of 377 contractors in Sacramento.

What the public records show

From the city's permits, one question at a time.

QuestionRecords showMark
Licensed?No license matched this business by name in the state's recordsAsk them
Jobs on record293 jobs on Sacramento permits, 2021 to 2026: 156 panel upgrades, 94 heat pump installations, 42 EV charger installations, 1 pool or spa4th most panel upgrade permits of 377 contractors in Sacramento. That counts jobs, not quality.Our Sacramento permit records cover September 2021 to August 2026.

Records: City of Sacramento permits.

Cost and timing

Permit value (not a price)

Their typical permit lists $6,092 (half list more, half less)

That is the figure written on the permit form, which can be far from what you pay. What panel upgrade jobs cost in Sacramento.

Get 2 or 3 written quotes.

Track record

94 jobs in the last 12 months, up from 43 the year before

Q3 2021: 2 jobsQ4 2021: 9 jobsQ1 2022: 13 jobsQ2 2022: 12 jobsQ3 2022: 10 jobsQ4 2022: 19 jobsQ1 2023: 10 jobsQ2 2023: 22 jobsQ3 2023: 14 jobsQ4 2023: 8 jobsQ1 2024: 12 jobsQ2 2024: 18 jobsQ3 2024: 7 jobsQ4 2024: 3 jobsQ1 2025: 13 jobsQ2 2025: 18 jobsQ3 2025: 22 jobsQ4 2025: 15 jobsQ1 2026: 26 jobsQ2 2026: 27 jobsQ3 2026: 13 jobsBusiest: 27 jobs20222023202420252026
Each bar is 3 months of permits. The tallest is 27 jobs, April to June 2026. Across Sacramento, all contractors together had 3% more panel upgrade jobs in the last 12 months than in the 12 months before.

Where they work most

  • 9583151 jobs
  • 9581834 jobs
  • 9582227 jobs
  • 9581625 jobs
  • 9581723 jobs

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Aug 19, 2026Panel upgradeNo details on the permit95831$1,207
Aug 19, 2026EV chargerNo details on the permit95831$1,207
Aug 14, 2026Heat pump95835$17,515
Aug 13, 2026Panel upgradeEPC - Run 8-3 romex from main panel through crawl space to designated location out front Staple and…95818$2,011
Aug 13, 2026EV chargerEPC - Run 8-3 romex from main panel through crawl space to designated location out front Staple and…95818$2,011
Aug 11, 2026Heat pumpNo Duct Work Permitted95831$19,524
Jul 29, 2026Heat pump95822$17,300
Jul 28, 2026Panel upgradeEPC - From main panel, pull 8/3 AWG with ground copper wire through future tubing into 4-square box…95834$2,202
Jul 28, 2026EV chargerEPC - From main panel, pull 8/3 AWG with ground copper wire through future tubing into 4-square box…95834$2,202
Jul 28, 2026Panel upgradeNo details on the permit95819$2,624
Jul 28, 2026EV chargerNo details on the permit95819$2,624
Jul 20, 2026EV chargerINSTALL NEW 40 AMP DEDICATED CIRCUIT FOR EV CHARGER/ BACK TO BACK/ HARDWIRED. Water conserving…95835$1,150
Jul 15, 2026Heat pumpNo Duct Work Permitted95817$20,109
Jun 30, 2026Heat pump95823$16,386
Jun 22, 2026EV chargerEPC - Install 40 amp GFCI breaker95835not stated
Jun 22, 2026Heat pump95816$19,553
Jun 19, 2026Heat pump95835$18,437
Jun 18, 2026Heat pump95834$24,357
Jun 18, 2026Heat pump95834$18,116
Jun 12, 2026Panel upgrade95831$9,986
Jun 9, 2026Heat pump95826$28,105
Jun 5, 2026Heat pump95835$19,087
Jun 3, 2026Panel upgrade95822$8,786
Jun 2, 2026Heat pump95822$18,331
May 28, 2026Heat pump95819$16,847
May 26, 2026Heat pump95823$17,761
May 20, 2026Panel upgradeNo details on the permit95831$2,500
May 20, 2026EV chargerNo details on the permit95831$2,500
May 19, 2026Panel upgrade95821$12,471
May 19, 2026Heat pump95835$17,363
May 15, 2026Panel upgradeNo details on the permit95835$1,121
May 15, 2026EV chargerNo details on the permit95835$1,121
May 11, 2026Heat pump95819$15,944
May 6, 2026Heat pump95815$12,321
Apr 29, 2026Panel upgrade95831$8,349
Apr 20, 2026Heat pump95831$19,963
Apr 16, 2026Heat pump95835$20,156
Apr 14, 2026Heat pump95831$18,598
Apr 8, 2026Heat pump95818$27,954
Apr 3, 2026Heat pump95816$22,252

What to ask before you hire

About Huft Heating and Air Conditioning Inc

  • Ask for the license number and check it with the state.
  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any panel upgrade electrician

  • Can you show me proof of liability insurance and your bond?
  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Huft Heating and Air Conditioning Inc

Five quick questions. We pass your request to Huft Heating and Air Conditioning Inc.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Huft Heating and Air Conditioning Inc. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians near 95831 and 95818

See all 377 panel upgrade electricians in Sacramento, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.