contractors.fyi
Sign in

All-electric California

Panel upgrade electrician based in San Francisco. Licensed since 2021.

  • License active
  • Workers' comp on file

138 jobs on San Francisco permits, 2022 to 2026: 68 panel upgrades, 47 heat pump installations, 21 EV charger installations, 2 solar installations. 41st most panel upgrade permits of 1,063 contractors in San Francisco.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?License 1078011, active in the state's records on Sep 23, 2026General building, electrical, heating and air, plumbingNo complaints or citations on the board's public record.Checks out
Workers' comp?Workers' comp policy on file with the stateThis covers their crew if someone is hurt. It is not insurance for your home.On file
In business?Licensed since 2021
Jobs on record138 jobs on San Francisco permits, 2022 to 2026: 68 panel upgrades, 47 heat pump installations, 21 EV charger installations, 2 solar installations41st most panel upgrade permits of 1,063 licensed contractors in San Francisco. That counts jobs, not quality.Our San Francisco permit records cover September 2021 to September 2026.

Records: the state license board and City of San Francisco permits.

State license board record

No complaints or citations on the board's public record.

Source: California Contractors State License Board, checked Oct 4, 2026. Look up license 1078011 on CSLB

Cost and timing

Permit value (not a price)

Nearly half of their recent permits list $10,000

4 of their 10 panel upgrade permits with a value in the last 12 months list exactly that, which looks like a set figure rather than a price. What panel upgrade jobs cost in San Francisco.

Get 2 or 3 written quotes.

Permit timeline

Across San Francisco, a panel upgrade permit stays open about 77 days, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. The permit itself is usually issued the same day. How long panel upgrade jobs take.

Track record

32 jobs in the last 12 months, down from 41 the year before

Q1 2022: 4 jobsQ2 2022: 10 jobsQ3 2022: 2 jobsQ4 2022: 9 jobsQ1 2023: 3 jobsQ2 2023: 2 jobsQ3 2023: 4 jobsQ4 2023: 10 jobsQ1 2024: 11 jobsQ2 2024: 5 jobsQ3 2024: 5 jobsQ4 2024: 14 jobsQ1 2025: 8 jobsQ2 2025: 11 jobsQ3 2025: 9 jobsQ4 2025: 10 jobsQ1 2026: 3 jobsQ2 2026: 15 jobsQ3 2026: 3 jobsBusiest: 15 jobs20222023202420252026
Each bar is 3 months of permits. The tallest is 15 jobs, April to June 2026. Across San Francisco, all contractors together had 21% fewer panel upgrade jobs in the last 12 months than in the 12 months before.

Where they work most

  • 9411037 jobs
  • 9413316 jobs
  • 9412216 jobs
  • 9411813 jobs
  • 9411713 jobs

Jobs by kind of work

Latest jobs

DateWorkZIP
Aug 17, 2026Panel upgradeAdd five new circuits to electrify dwelling94110
Aug 17, 2026Heat pumpWork category: 1m; replace forced air gas furnace heating system with an air to water heat pump…94110
Aug 2, 2026EV chargerNo details on the permit94116
Jun 25, 2026Heat pumpWork category: 2pa; replace (5) gas water heaters in mechanical room with (5) hybrid heat pump…94110
Jun 24, 2026Heat pumpUninstall existing dhw boiler tl00-199nskx and install sanco2 heat pump water heater system with 3…94109
Jun 21, 2026Heat pumpWork category: 11p; replace existing dhw boiler with sanco2 heat pump water heater system: 3 ganged…94109
Jun 15, 2026Panel upgradeNo details on the permit94110
Jun 5, 2026Heat pumpWork category: 1m; install harvest system for space heating/water heating, with 1 heat pump water…94127
May 22, 2026Panel upgradeInstall nema 14-50r receptacle from subpanel in service hallway for ev charger94118
May 22, 2026EV chargerInstall nema 14-50r receptacle from subpanel in service hallway for ev charger94118
May 19, 2026Panel upgradeInstall 48a ev charger with concealed wire from subpanel in garage94127
May 19, 2026EV chargerInstall 48a ev charger with concealed wire from subpanel in garage94127
May 13, 2026Panel upgradeUnit 2059 a: install (1) new 240v/30a branch circuit from (e) subpanel to (1) new nema 14-30r…94133
Apr 9, 2026Heat pump94122
Apr 8, 2026Panel upgradeInstall heat pump water heater to replace gas water heater94122
Apr 6, 2026Panel upgradeNo details on the permit94118
Apr 2, 2026Panel upgradeInstall ev power switching panelboard in common area94112
Apr 2, 2026EV chargerInstall ev power switching panelboard in common area94112
Jan 29, 2026Solar, 8.8 kWSolar permit: installing 20 solar pv modules, 440 watts per module, total no94118
Jan 23, 2026Panel upgradeNo details on the permit94112
Jan 23, 2026EV chargerNo details on the permit94112
Dec 22, 2025Heat pumpWork category: 1m; install heat pumps to replace gas loads94117
Dec 19, 2025Heat pumpWork category: 1m; install harvest system for space heating/water heating, with (2) heat pump water…94118
Dec 9, 2025Heat pump94122
Dec 2, 2025Panel upgradeNo details on the permit94112
Dec 2, 2025Heat pump94127
Nov 28, 2025Heat pumpWork category: 1p; install heat pump water heater (plug-in model) to replace gas water heater in…94112
Nov 17, 2025Panel upgradeNo details on the permit94117
Nov 3, 2025Heat pump94116
Oct 31, 2025Heat pumpWork category: 1p; install heat pump water heater (65 gal) to replace existing gas water heater94122
Oct 14, 2025Heat pumpWork category: 1p; replace existing gas water heater with plug in heat pump water heater in same…94117
Sep 26, 2025Heat pumpWork category: 1m; install heat pump water heater (sanco2) with 119-gal buffer tank and potable…94131
Sep 22, 2025Panel upgradeNo details on the permit94131
Sep 22, 2025EV chargerNo details on the permit94131
Sep 2, 2025Heat pumpWork category: 1p; install air-to-water heat pump in back yard, 80 gallon thermal storage tank in…94110
Aug 20, 2025Panel upgradeNo details on the permit94118
Aug 20, 2025EV chargerNo details on the permit94118
Aug 19, 2025Panel upgradeInstall heat pump in backyard, electric range circuit and receptacle in kitchen, from garage…94110
Aug 18, 2025Panel upgradeUnit is 2059a powell st94133
Jul 1, 2025Panel upgradeNo details on the permit94133

What to ask before you hire

About All-electric California

  • Ask what the warranty covers and for how long, in writing.

Worth asking any panel upgrade electrician

  • Can you show me proof of liability insurance and your bond?
  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from All-electric California

Five quick questions. We pass your request to All-electric California.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to All-electric California. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians near 94110 and 94133

See all 1,063 panel upgrade electricians in San Francisco, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.