contractors.fyi
Sign in

Bolter Construction

Panel upgrade electrician based in San Francisco. Licensed since 1984.

  • License 463620, contr bond susp in the state's records on Sep 23, 2026
  • No workers' comp: the business told the state it has no employees

12 jobs on San Francisco permits, 2022 to 2025: 10 panel upgrades, 2 heat pump installations.

The state showed this license as "contr bond susp" on Sep 23, 2026. Do not hire until that is cleared.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?License 463620, contr bond susp in the state's records on Sep 23, 2026General building, electrical, plumbingProblem
Workers' comp?No workers' comp: the business told the state it has no employeesThis covers their crew if someone is hurt. It is not insurance for your home.Ask them
In business?Licensed since 1984
Jobs on record12 jobs on San Francisco permits, 2022 to 2025: 10 panel upgrades, 2 heat pump installationsOur San Francisco permit records cover September 2021 to September 2026.

Records: the state license board and City of San Francisco permits.

State license board record

No complaints or citations on the board's public record.

Source: California Contractors State License Board, checked Oct 4, 2026. Look up license 463620 on CSLB

Cost and timing

Permit value (not a price)

Their typical permit lists $1,500 (half list more, half less)

That is the figure written on the permit form, which can be far from what you pay. What panel upgrade jobs cost in San Francisco.

Get 2 or 3 written quotes.

Permit timeline

Across San Francisco, a panel upgrade permit stays open about 77 days, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. The permit itself is usually issued the same day. How long panel upgrade jobs take.

Track record

Jobs per quarter

Q3 2022: 1 jobQ3 2023: 1 jobQ3 2024: 9 jobsQ1 2025: 1 jobBusiest: 9 jobs202320242025
Each bar is 3 months of permits. The tallest is 9 jobs, July to September 2024.

Where they work most

  • 941179 jobs
  • 941122 jobs
  • 941141 job

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

A row marked ×2 or more stands for that many similar jobs on one day in one ZIP code.

DateWorkZIPOn the permit form
Feb 18, 2025Heat pumpWork category: 3pa; remodel ex94117not stated
Sep 14, 2024Panel upgradeRemove existing 100amp service and sub panel94112$2,500
Sep 6, 2024Heat pumpWork category: 1p; replace existing gas gravity furnace with a new heat pump and add a minisplit…94114not stated
Jul 22, 2024Panel upgrade (×6, same day)94117$1,500 each
Jul 5, 2024Panel upgradeRemove the unsafe100amp/220v "federal pacific" main panel, leave existing meter94112$5,000
Sep 25, 2023Panel upgradeRemove the existing 200amp/220v main disconnect and it's 5 apartment meters and house meter94117not stated
Aug 8, 2022Panel upgradeReplace 100amp / 220v sub-panel in existing location94117not stated

What to ask before you hire

About Bolter Construction

  • Do not hire until the state shows the license as active.
  • Ask who will do the work. Anyone they pay to work on your home must be covered by workers' comp.
  • Ask what the warranty covers and for how long, in writing.

Worth asking any panel upgrade electrician

  • Can you show me proof of liability insurance and your bond?
  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Bolter Construction

Five quick questions. We pass your request to Bolter Construction.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Bolter Construction. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians near 94117 and 94112

See all 1,063 panel upgrade electricians in San Francisco, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.