contractors.fyi
Sign in

Samco Construction Inc

Panel upgrade electrician based in San Francisco. Licensed since 2007.

  • License active
  • Workers' comp on file

18 jobs on San Francisco permits, 2021 to 2026: 11 panel upgrades, 3 remodels, 2 heat pump installations, 1 home addition, 1 ADU. 334th most panel upgrade permits of 1,063 contractors in San Francisco.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?License 899541, active in the state's records on Sep 23, 2026General building, electricalNo complaints or citations on the board's public record.Checks out
Workers' comp?Workers' comp policy on file with the stateThis covers their crew if someone is hurt. It is not insurance for your home.On file
In business?Licensed since 2007
Jobs on record18 jobs on San Francisco permits, 2021 to 2026: 11 panel upgrades, 3 remodels, 2 heat pump installations, 1 home addition, 1 ADU334th most panel upgrade permits of 1,063 licensed contractors in San Francisco. That counts jobs, not quality.Our San Francisco permit records cover September 2021 to September 2026.

Records: the state license board and City of San Francisco permits.

State license board record

No complaints or citations on the board's public record.

Source: California Contractors State License Board, checked Oct 4, 2026. Look up license 899541 on CSLB

Cost and timing

Permit value (not a price)

Their typical permit lists $5,000 (half list more, half less)

That is the figure written on the permit form, which can be far from what you pay. What panel upgrade jobs cost in San Francisco.

Get 2 or 3 written quotes.

Permit timeline

Across San Francisco, a panel upgrade permit stays open about 77 days, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. The permit itself is usually issued the same day. How long panel upgrade jobs take.

Track record

4 jobs in the last 12 months, down from 5 the year before

Q4 2021: 1 jobQ1 2022: 1 jobQ2 2022: 1 jobQ1 2024: 3 jobsQ2 2024: 2 jobsQ3 2024: 1 jobQ4 2024: 2 jobsQ1 2025: 1 jobQ2 2025: 2 jobsQ1 2026: 2 jobsQ2 2026: 1 jobQ3 2026: 1 jobBusiest: 3 jobsLatest: 1 job20222023202420252026
Each bar is 3 months of permits. The tallest is 3 jobs, January to March 2024. Across San Francisco, all contractors together had 21% fewer panel upgrade jobs in the last 12 months than in the 12 months before.

Where they work most

  • 941074 jobs
  • 941243 jobs
  • 941143 jobs
  • 941342 jobs
  • 941272 jobs

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Jul 24, 2026Panel upgradeUfer ground, wiring for 3 bedrooms, 3.5 bathrooms,upgrade to 200a service, services no & sizes…94107not stated
May 15, 2026Panel upgradeReplace grounding for meter for 400amp service94124not stated
Feb 9, 2026RemodelIn-kind remodeling of 1st floor kitchen and bathroom94107$15,000
Jan 27, 2026Panel upgradeMeter reset 125 amp service upgrade94124not stated
Jun 18, 2025Panel upgradeSeparate adu wiring unit new subpanel94134not stated
Apr 10, 2025Panel upgradeUpgrade 50amp panel to 125amp panel94133$5,000
Jan 30, 2025Panel upgradeReplace (e) 200 amp 5 meter panel (like for like)94121$8,000
Oct 28, 2024Panel upgradeReplace existing 200 amp service panel94127$1,000
Oct 1, 2024AdditionRenovate(e)sfd,horizontal addition at rear & front of bldg, vertical addition by removing gable…94107$480,000
Jul 25, 2024RemodelIn-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with…94107$26,000
Jun 10, 2024Panel upgradeReplace existing 100 a main panel94110$1,000
Apr 5, 2024ADUConvert exisitng conditional space on 1st floor into adu per state program.per ordinance…94134$10,000
Mar 8, 2024Heat pumpInstall (3) heat pumps for unit 92 for 1.5 ton, unit 96 and unit 98 for 3 ton94114not stated
Feb 22, 2024Panel upgradeRef 202304044990- unit 147 to rewire entire unit to include replace outlets, switches, lights and…94114$20,000
Feb 22, 2024Heat pumpRef 202304044990- install new heat pump system for 2nd floor unit 14794114not stated
Apr 1, 2022RemodelTo comply with nov 202184367 - legalize 2nd floor kitchen "remodel" w/wall infill; legalize ground…94124$25,000
Feb 18, 2022Panel upgradeInstall ufer ground to new foundation94127$20,000
Dec 20, 2021Panel upgradeService upgrade to 200amp94132$1,500

What to ask before you hire

About Samco Construction Inc

  • Ask what the warranty covers and for how long, in writing.

Worth asking any panel upgrade electrician

  • Can you show me proof of liability insurance and your bond?
  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Samco Construction Inc

Five quick questions. We pass your request to Samco Construction Inc.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Samco Construction Inc. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians near 94107 and 94124

See all 1,063 panel upgrade electricians in San Francisco, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.