contractors.fyi
Sign in

Dliu Construction

Panel upgrade electrician based in San Francisco. Licensed since 2017.

  • License active
  • Workers' comp on file

32 jobs on San Francisco permits, 2021 to 2025: 16 panel upgrades, 15 remodels, 1 roofing job. 222nd most panel upgrade permits of 1,063 contractors in San Francisco.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?License 1024020, active in the state's records on Sep 23, 2026General buildingNo complaints or citations on the board's public record.Checks out
Workers' comp?Workers' comp policy on file with the stateThis covers their crew if someone is hurt. It is not insurance for your home.On file
In business?Licensed since 2017
Jobs on record32 jobs on San Francisco permits, 2021 to 2025: 16 panel upgrades, 15 remodels, 1 roofing job222nd most panel upgrade permits of 1,063 licensed contractors in San Francisco. That counts jobs, not quality.Our San Francisco permit records cover September 2021 to September 2026.

Records: the state license board and City of San Francisco permits.

State license board record

No complaints or citations on the board's public record.

Source: California Contractors State License Board, checked Oct 4, 2026. Look up license 1024020 on CSLB

Cost and timing

Permit timeline

Across San Francisco, a panel upgrade permit stays open about 77 days, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. The permit itself is usually issued the same day. How long panel upgrade jobs take.

Track record

0 jobs in the last 12 months, down from 9 the year before

Q4 2021: 2 jobsQ1 2022: 2 jobsQ2 2022: 4 jobsQ3 2022: 5 jobsQ4 2022: 1 jobQ2 2023: 5 jobsQ3 2023: 2 jobsQ2 2024: 2 jobsQ4 2024: 2 jobsQ1 2025: 2 jobsQ2 2025: 5 jobsBusiest: 5 jobsBusiest: 5 jobs2022202320242025
Each bar is 3 months of permits. The tallest is 5 jobs, July to September 2022. Across San Francisco, all contractors together had 21% fewer panel upgrade jobs in the last 12 months than in the 12 months before.

Where they work most

  • 941127 jobs
  • 941276 jobs
  • 941325 jobs
  • 941224 jobs
  • 941173 jobs

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

A row marked ×2 or more stands for that many similar jobs on one day in one ZIP code.

DateWorkZIPOn the permit form
Jun 5, 2025RemodelRemodel all 5 full bathrooms at (e) location94132$60,000
Jun 5, 2025Panel upgradeRemodel 5 bathrooms94132not stated
May 19, 2025Panel upgrade (×3, same day)94117not stated
Jan 14, 2025RemodelComplete upper level interior remodel94121$200,000
Jan 14, 2025Panel upgradeInstall new 200a main panel and one subpanel94121not stated
Dec 19, 2024RemodelRemodel existing kitchen same layout94122$12,000
Dec 19, 2024Panel upgradeRef to bldg pa 202412197151: remodel kitchen, add subpanel for kitchen electric update (70 amp)94122not stated
May 24, 2024Remodel2nd fl - remodel of kitchen, bathroom & bedroom; remodel of (e) bathroom interior only with no…94132$150,000
May 24, 2024Panel upgradeRemodel kitchen and bathroom at g/f94132not stated
Sep 21, 2023RemodelMinor residential interior remodel single family residence to remodel e bathrooms and e kithen on…94127$78,000
Sep 21, 2023Panel upgradeNew wire of whole house, add one subpanel 40 lights, 20 switches, 20 receptacles, 4 fans, 1 d/w, 1…94127not stated
Jun 20, 2023RemodelRemodel (e) kitchen94112$10,000
Jun 20, 2023Panel upgradeUpgrade first floor house wiring94112not stated
May 24, 2023ReroofMinor residential interior remodel of sfr, ground flr remodel for habitable space for total of 2…94112$250,000
May 24, 2023RemodelMinor residential interior remodel of sfr, ground flr remodel for habitable space for total of 2…94112$250,000
May 24, 2023Panel upgradeFull house electrical wire update, add 1 sub panel 30 lights, 10 switches, 20 receptacles, 4 fans,…94112not stated
Dec 28, 2022Panel upgradeNo details on the permit94116not stated
Sep 23, 2022RemodelRemodel bathron on 2nd fl; remodel (e) non-bearing kitchen wall on 2nd fl; add media room and…94127$85,000
Sep 23, 2022Panel upgradeRemodel kitchen, bathrooms, update 100 amp to 200 amp service94127not stated
Aug 8, 2022RemodelInterior remodel of 2nd fl kitchen and bath94116$150,000
Aug 8, 2022Panel upgradeRewire whole house with 1 sub panel 70 amp94116not stated
Jul 5, 2022RemodelRemodel extg bathroom, not move any wall at 1st floor94112$10,000
Jun 8, 2022RemodelRemodel bathrooms on (e) 3/f & 2/f94127$150,000
Jun 8, 2022Panel upgradeUpdate main pnel to 200a94127not stated
May 27, 2022RemodelInterior remodel94114$60,000
May 27, 2022Panel upgradeRelocate subpanel in unit and add lights and outlets94114not stated
Feb 2, 2022Remodel1st fl: add 2 bedrooms, a media room, 2 full baths, & remodel foyer area94122$110,000
Feb 2, 2022Panel upgradeAdd 2 bedrooms, a media room, 2 full bath94122not stated
Nov 19, 2021RemodelNo details on the permit94112$125,000
Oct 19, 2021RemodelRemodel gr fl 2nd bath to full bath, add 1 full bath at gr fl, remodel 2nd fl bath to 2 full bath94132$25,000

What to ask before you hire

About Dliu Construction

  • Ask what the warranty covers and for how long, in writing.

Worth asking any panel upgrade electrician

  • Can you show me proof of liability insurance and your bond?
  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Dliu Construction

Five quick questions. We pass your request to Dliu Construction.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Dliu Construction. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians near 94112 and 94127

See all 1,063 panel upgrade electricians in San Francisco, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.