50 jobs on Seattle permits, 2021 to 2025: 42 panel upgrades, 8 EV charger installations. 37th most panel upgrade permits of 327 contractors in Seattle.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?License ACELEES745K8, active in the state's records on Oct 3, 2026Plumbing contractor, journey level specialtyThe same business also holds license CELECCE873OZ (Electrical contractor), active in the state's records.The same business also holds license ACELEES750O6 (Construction contractor), active in the state's records.Checks out
Insurance and bond?Bond $6,000 on file with the state, with no end date (it stays in force until the bond company cancels it)Liability insurance $1,000,000 on file with the state, until Feb 1, 2027.On file
Jobs on record50 jobs on Seattle permits, 2021 to 2025: 42 panel upgrades, 8 EV charger installationsThey are based in Seatac. Work outside Seattle is not in these records.37th most panel upgrade permits of 327 licensed contractors in Seattle. That counts jobs, not quality.Our Seattle permit records cover October 2021 to September 2026.

Records: the state Department of Labor and Industries and City of Seattle permits.

Cost and timing

Permit value (not a price)

Their typical permit lists $7,000 (half list more, half less)

That is the figure written on the permit form, which can be far from what you pay. What panel upgrade jobs cost in Seattle.

Get 2 or 3 written quotes.

Permit timeline

Across Seattle, a panel upgrade permit stays open about 37 days, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. How long panel upgrade jobs take.

Track record

5 jobs in the last 12 months, down from 12 the year before

Q4 2021: 4 jobsQ1 2022: 2 jobsQ2 2022: 2 jobsQ3 2022: 3 jobsQ4 2022: 1 jobQ2 2023: 1 jobQ3 2023: 4 jobsQ4 2023: 8 jobsQ2 2024: 6 jobsQ3 2024: 2 jobsQ4 2024: 4 jobsQ1 2025: 1 jobQ2 2025: 1 jobQ3 2025: 6 jobsQ4 2025: 5 jobsBusiest: 8 jobs2022202320242025
Each bar is 3 months of permits. The tallest is 8 jobs, October to December 2023. Across Seattle, all contractors together had 74% fewer panel upgrade jobs in the last 12 months than in the 12 months before.

Where they work most

  • 981259 jobs
  • 981187 jobs
  • 981085 jobs
  • 981193 jobs
  • 981033 jobs

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Dec 4, 2025EV charger98133$1,900
Oct 24, 2025EV charger98108$1,800
Oct 9, 2025Panel upgradeInstall circuit for HVAC central heat pump unit; Replace 200Amp service panel (pick-up existing…98118$7,000
Oct 9, 2025Panel upgradeInstall circuit for HVAC central heat pump unit; Reconnect hot water heater circuit; Replace 200Amp…98125$10,000
Oct 9, 2025Panel upgradeInstall circuit for HVAC central heat pump unit; Install 200Amp service (pick-up existing only);…98102$10,000
Sep 16, 2025Panel upgradeReplace 200Amp service panel - pick-up existing only; Reconnect furnace circuit for HVAC central…98125$10,000
Sep 16, 2025EV chargerInstall EV charging receptacle98105$1,500
Jul 24, 2025Panel upgradeReplace 200Amp service panel -pick up existing only; install EV car charger; replace/repair a few…98119$17,500
Jul 24, 2025EV chargerReplace 200Amp service panel -pick up existing only; install EV car charger; replace/repair a few…98119$17,500
Jul 6, 2025Panel upgradeInstall circuit for HVAC central heat pump unit; Replace 200Amp service -Pick-up existing only98107$7,000
Jul 6, 2025Panel upgradeInstall circuit for HVAC central heat pump unit; Upgrade 200Amp service - pick-up existing only98125$6,000
May 8, 2025Panel upgradeDisconnect and remove existing service conductors and fittings from meter to panel, and supply and…98118$5,900
Jan 23, 2025EV chargerInstall circuit for EV charger98103not stated
Dec 19, 2024Panel upgradeUpgrade 200Amp service; Install circuit for HVAC central heat pump unit98125$5,000
Dec 19, 2024Panel upgradeUpgrade service to 200Amp service; Install circuit for HVAC central heat pump system98116$5,000
Dec 19, 2024EV chargerUpgrade 200Amp service; Install circuit for HVAC central heat pump unit98125$5,000
Dec 4, 2024Panel upgradeInstall temporary electrical service. Disconnect circuits from existing 200 amp service…98177$1,800
Sep 26, 2024Panel upgradeInstall 200Amp service panel; Install circuit for HVAC heat pump unit; Add 2 GFCI outside…98117$10,500
Aug 27, 2024Panel upgradeInstall 200Amp service; Install circuit for HVAC central heat pump unit98125$8,000
Jun 21, 2024Panel upgradeReplace 100Amp service panel that was damaged by water98133$2,000
May 29, 2024Panel upgrade200Amp Service Change; Circuit for car charger98118$6,300
May 29, 2024EV charger200Amp Service Change; Circuit for car charger98118$6,300
May 15, 2024Panel upgrade200Amp Service Change98144$10,000
May 13, 2024Panel upgradeReplace service panel; install circuit for HVAC heat pump unit98115$4,000
Apr 5, 2024Panel upgradeReplace 200Amp service panel98117$4,500
Dec 20, 2023Panel upgradeRewire basement unit; Move one panel for first floor unit upstairs to the unit98119$19,000
Nov 17, 2023Panel upgradeReplace 200Amp panel; install circuit for HVAC unit98178$7,000
Nov 9, 2023Panel upgradeReplace 200Amp panel; Install circuit for HVAC heat pump98136$8,000
Nov 3, 2023Panel upgradeReplace 200Amp service panel; Install circuit for HVAC unit98125$8,000
Oct 31, 2023EV charger98125$1,200
Oct 24, 2023Panel upgradeReplace 200Amp service; Install circuit for HVAC unit98125$10,000
Oct 11, 2023Panel upgradeReplace 200Amp service; Install circuit for HVAC system98178$7,000
Oct 6, 2023Panel upgradeReplace 200Amp service; install circuit for HVAC heat pump system98108$8,000
Sep 29, 2023Panel upgradeReplace 200Amp service panel98146$10,000
Sep 18, 2023Panel upgradeInstall 200Amp service; Install circuit for HVAC unit98116$23,000
Sep 11, 2023Panel upgradeInstall 200Amp Service98105$7,000
Jul 10, 2023Panel upgradeService Change98108$4,500
May 16, 2023Panel upgradeReplace existing 400Amp service, reconnect existing feeders (5)98117$20,000
Dec 22, 2022Panel upgradeReplace 125Amp service panel98102$3,300
Sep 28, 2022Panel upgradeInstall 200 Amp Service; install HVAC circuitNot listed$6,000

What to ask before you hire

About AC Electric Service

  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any panel upgrade electrician

  • Can you show me proof of liability insurance and your bond?
  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from AC Electric Service

Five quick questions. We pass your request to AC Electric Service.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to AC Electric Service. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians near 98125 and 98118

See all 327 panel upgrade electricians in Seattle, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.