contractors.fyi
Sign in

Boyer Electric

Panel upgrade electrician based in Woodinville.

  • License active
  • Bond on file

71 jobs on Seattle permits, 2021 to 2025: 44 panel upgrades, 27 EV charger installations. 33rd most panel upgrade permits of 327 contractors in Seattle.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?License BOYEREC101LE, active in the state's records on Oct 3, 2026Electrical contractorChecks out
Insurance and bond?Bond $4,000 on file with the state, with no end date (it stays in force until the bond company cancels it)The state keeps no liability insurance records for electrical contractors, so ask for a certificate.Bond on file
Jobs on record71 jobs on Seattle permits, 2021 to 2025: 44 panel upgrades, 27 EV charger installationsThey are based in Woodinville. Work outside Seattle is not in these records.33rd most panel upgrade permits of 327 licensed contractors in Seattle. That counts jobs, not quality.Our Seattle permit records cover October 2021 to September 2026.

Records: the state Department of Labor and Industries and City of Seattle permits.

Cost and timing

Permit value (not a price)

Their typical permit lists $2,750 (half list more, half less)

That is the figure written on the permit form, which can be far from what you pay. What panel upgrade jobs cost in Seattle.

Get 2 or 3 written quotes.

Permit timeline

Across Seattle, a panel upgrade permit stays open about 37 days, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. How long panel upgrade jobs take.

Track record

3 jobs in the last 12 months, down from 7 the year before

Q4 2021: 2 jobsQ1 2022: 8 jobsQ2 2022: 4 jobsQ3 2022: 4 jobsQ4 2022: 7 jobsQ1 2023: 1 jobQ2 2023: 9 jobsQ3 2023: 3 jobsQ4 2023: 7 jobsQ1 2024: 9 jobsQ2 2024: 4 jobsQ3 2024: 3 jobsQ4 2024: 1 jobQ1 2025: 4 jobsQ3 2025: 2 jobsQ4 2025: 3 jobsBusiest: 9 jobsLatest: 3 jobs2022202320242025
Each bar is 3 months of permits. The tallest is 9 jobs, April to June 2023. Across Seattle, all contractors together had 74% fewer panel upgrade jobs in the last 12 months than in the 12 months before.

Where they work most

  • 9810310 jobs
  • 9811210 jobs
  • 981178 jobs
  • 981198 jobs
  • 981056 jobs

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Dec 31, 2025Panel upgradeInstall new 300-amp main service and (13) apartment panels to replace existing fuse panels …98102$24,630
Dec 17, 2025Panel upgrade1200amp service line/load swap, no new loads98103not stated
Oct 1, 2025Panel upgradeAdding (1) 20A circuit next to panel for sub metering equipment98117not stated
Sep 23, 2025Panel upgradeUpgrading existing service, (1) 300amp service98102$7,300
Jul 28, 2025EV chargerAdding (1) new 50Amp circuit for EV outlet98103not stated
Mar 19, 2025Panel upgradeInstallation of (1) house Panel & Meter; (1) 60amp Feeder98119$3,000
Feb 7, 2025Panel upgrade125amp service repair98115not stated
Jan 16, 2025Panel upgradeReplace existing Zinsco MDU & metering & house panel for condo building [1/16/25 KEF - Plan set…98116$43,200
Jan 3, 2025Panel upgradeReplacing (11) 125amp unit panels98117$19,000
Dec 5, 2024EV chargerAdding (1) 240volt 30amp circuit for hard wired EV charger98177not stated
Jul 31, 2024Panel upgradeReplacing (1) 125amp subpanel in garage as a result of water damage98119not stated
Jul 16, 2024Panel upgradeUnit #700 - Replacing (1) 125-amp Panel98122$1,200
Jul 15, 2024Panel upgradeUnit #4 - Replacing (1) 125amp panel98119not stated
May 30, 2024EV chargerExtending (1) 20-amp circuit for car charger98112not stated
May 3, 2024EV chargerInstalling (1) 40-amp outlet for EV charger98103$1,500
Apr 23, 2024EV chargerAdding (1) 50-amp circuit for EV Charger98112not stated
Apr 5, 2024Panel upgradeReplacing (3) 125-amp panels in units #2, 3 and 5 [4/8/2024 PGF This is feeder work, not service98107$3,300
Mar 29, 2024EV chargerWiring for (1) 50-amp EV Charger98109not stated
Mar 13, 2024Panel upgradeReplacing 125-amp service conductors in the mast98103$1,000
Mar 6, 2024Panel upgradeReplacement of (1) 200-amp panel, switches, outlets, fixture and exhaust fan98112$3,500
Mar 1, 2024Panel upgradeReplacing (5) 125-amp panels98107$5,500
Feb 21, 2024EV chargerAdding (1) 50-amp EV charger outlet in carport98112$2,500
Feb 19, 2024Panel upgradeReplace (1) Zinsco panel98199$2,200
Feb 9, 2024Panel upgradeReplace (1) 125-amp panel98109$1,100
Jan 23, 2024Panel upgradeNo details on the permit98112$6,600
Jan 10, 2024Panel upgradeReplace service entrance mast damaged by tree fall (1) 125amp service entrance repair98144not stated
Dec 22, 2023Panel upgrade125-amp panel replacement98103not stated
Dec 7, 2023Panel upgradeReplacing (1) 200-amp service98103$3,500
Dec 5, 2023Panel upgradeReplace (1) 100-amp panel [1/17/24 KEF - Unit 202]98119$1,050
Dec 4, 2023Panel upgradeReplacing (1) 200-amp panel and (2) 100-amp panels98109$2,000
Nov 7, 2023Panel upgrade60-amp panel replacement [ This appears to be a 125A panel replacement - 1/31/2024 - ACC -]98105not stated
Oct 30, 2023Panel upgradeRepair existing feeder conduit to 125amp panel to Apt B; damaged by car98144not stated
Oct 9, 2023EV chargerInstall EV Charger98122$2,000
Jul 18, 2023Panel upgradeAdding (1) new circuit from panel to Range98117not stated
Jul 14, 2023EV chargerAdding (1) 50amp EV Circuit98117not stated
Jul 3, 2023EV chargerAltering (1) circuit for EV Charger98112not stated
Jun 22, 2023EV chargerAdding (1) circuit for EV charger in garage98105not stated
Jun 2, 2023Panel upgradeReplacement 200amp service & 50amp EV chrg circuit98117$4,200
Jun 2, 2023EV chargerReplacement 200amp service & 50amp EV chrg circuit98117$4,200
May 23, 2023EV chargerWire for EV Charger98105$2,000

What to ask before you hire

About Boyer Electric

  • Ask for a certificate of liability insurance.
  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any panel upgrade electrician

  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Boyer Electric

Five quick questions. We pass your request to Boyer Electric.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Boyer Electric. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians near 98103 and 98112

See all 327 panel upgrade electricians in Seattle, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.