contractors.fyi
Sign in

Bridge Electric Inc

Panel upgrade electrician based in Seattle.

  • License active
  • Bond on file

20 jobs on Seattle permits, 2021 to 2025: 14 panel upgrades, 6 EV charger installations. 116th most panel upgrade permits of 327 contractors in Seattle.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?License BRIDGEI878OW, active in the state's records on Oct 3, 2026Electrical contractorChecks out
Insurance and bond?Bond $4,000 on file with the state, with no end date (it stays in force until the bond company cancels it)The state keeps no liability insurance records for electrical contractors, so ask for a certificate.Bond on file
Jobs on record20 jobs on Seattle permits, 2021 to 2025: 14 panel upgrades, 6 EV charger installations116th most panel upgrade permits of 327 licensed contractors in Seattle. That counts jobs, not quality.Our Seattle permit records cover October 2021 to September 2026.

Records: the state Department of Labor and Industries and City of Seattle permits.

Cost and timing

Permit value (not a price)

Their typical permit lists $5,250 (half list more, half less)

That is the figure written on the permit form, which can be far from what you pay. What panel upgrade jobs cost in Seattle.

Get 2 or 3 written quotes.

Permit timeline

Across Seattle, a panel upgrade permit stays open about 37 days, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. How long panel upgrade jobs take.

Track record

Jobs per quarter

Q4 2021: 2 jobsQ2 2022: 1 jobQ4 2022: 1 jobQ1 2023: 1 jobQ2 2023: 1 jobQ3 2023: 1 jobQ4 2023: 3 jobsQ2 2024: 2 jobsQ3 2024: 3 jobsQ4 2024: 2 jobsQ1 2025: 1 jobQ2 2025: 1 jobQ3 2025: 1 jobBusiest: 3 jobs2022202320242025
Each bar is 3 months of permits. The tallest is 3 jobs, October to December 2023.

Where they work most

  • 981165 jobs
  • 981364 jobs
  • 981072 jobs
  • 981182 jobs
  • 981331 job

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Jul 2, 2025Panel upgradeSwap existing 200A Panel for new98136$3,500
May 21, 2025Panel upgradeDemo (7) existing Panels and replace with new Panels98133$15,000
Feb 25, 2025Panel upgradeChanging out (18) existing Challenger apartment panels & (1) existing Challenger house panel for…98103$30,000
Dec 4, 2024Panel upgradeRemodel of existing kitchen, includes new subpanel98107$8,000
Oct 22, 2024Panel upgradeReplacing zinsco unit 1 panel with square d 125a mlo equivalent panel98136$1,500
Jul 25, 2024Panel upgradeNo details on the permit98116$5,000
Jul 24, 2024Panel upgradeRemodel of main level powder bath & master closet98116$17,000
Jul 19, 2024Panel upgradeRemodel/Addition of existing SFR 200A panel swap - Increasing panel size from 30 space to 40 space98116$21,000
May 17, 2024EV chargerNEW CONSTRUCTION OF 6 - TOWNHOMES WITH 3 - EV READY PARKING SPOTS [05/17/24 BGO - Approved Service…98115$95,000
May 1, 2024Panel upgrade200A meter and panel replacement due to failure of overheard aerial conductors98126$5,000
Nov 14, 2023Panel upgradeReplace existing 100amp Federal Pacific Snap Loc panel with new 100amp main breaker panelNot listed$2,500
Oct 24, 2023Panel upgradeHouse panel for groundwater pump98117$1,500
Oct 5, 2023Panel upgradeReplacing existing 100amp service and zinsco panel with new 200amp service and panel98118$5,500
Jul 6, 2023EV chargerInstalled GFCI Protected 240V/50A Circuit for EV Charger98118$1,000
May 25, 2023EV chargerEV Circuit & Outdoor unit98116$4,000
Mar 24, 2023EV charger50A/240V EV Charger Circuit98136$1,957
Oct 11, 2022EV charger2 new Circuits for EV Chargers98116$1,500
May 2, 2022EV chargerNew construction SFR, Lake, 8/16/2022, EV ready is 298112$28,000
Dec 2, 2021Panel upgradeDemo 200A Zinsco Panel and replace with new 200A Square D Panel98136$2,500
Oct 25, 2021Panel upgradeLower Unit Remodel - 125A Panel Change98107$10,000

What to ask before you hire

About Bridge Electric Inc

  • Ask for a certificate of liability insurance.
  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any panel upgrade electrician

  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Bridge Electric Inc

Five quick questions. We pass your request to Bridge Electric Inc.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Bridge Electric Inc. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians near 98116 and 98136

See all 327 panel upgrade electricians in Seattle, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.