contractors.fyi
Sign in

Neptune Electric Co

Panel upgrade electrician based in Seattle.

  • License active
  • Bond on file

16 jobs on Seattle permits, 2022 to 2025: 15 panel upgrades, 1 EV charger installation. 111th most panel upgrade permits of 327 contractors in Seattle.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?License NEPTUEC913KG, active in the state's records on Oct 3, 2026Electrical contractorChecks out
Insurance and bond?Bond $4,000 on file with the state, with no end date (it stays in force until the bond company cancels it)The state keeps no liability insurance records for electrical contractors, so ask for a certificate.Bond on file
Jobs on record16 jobs on Seattle permits, 2022 to 2025: 15 panel upgrades, 1 EV charger installation111th most panel upgrade permits of 327 licensed contractors in Seattle. That counts jobs, not quality.Our Seattle permit records cover October 2021 to September 2026.

Records: the state Department of Labor and Industries and City of Seattle permits.

Cost and timing

Permit value (not a price)

Their typical permit lists $6,000 (half list more, half less)

That is the figure written on the permit form, which can be far from what you pay. What panel upgrade jobs cost in Seattle.

Get 2 or 3 written quotes.

Permit timeline

Across Seattle, a panel upgrade permit stays open about 37 days, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. How long panel upgrade jobs take.

Track record

Jobs per quarter

Q1 2022: 5 jobsQ2 2022: 1 jobQ3 2022: 3 jobsQ3 2023: 1 jobQ4 2023: 1 jobQ3 2024: 1 jobQ1 2025: 1 jobQ3 2025: 3 jobsBusiest: 5 jobsLatest: 3 jobs2022202320242025
Each bar is 3 months of permits. The tallest is 5 jobs, January to March 2022.

Where they work most

  • 981156 jobs
  • 981992 jobs
  • 981072 jobs
  • 981441 job
  • 981161 job

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Sep 12, 2025Panel upgradeReplace service conductor from 200a meter to new panel98144$3,500
Sep 8, 2025Panel upgradeAdd 50a sub panel for future circuits98115$4,000
Aug 19, 2025EV chargerInstall 40a ev charger circuit98115$2,000
Mar 23, 2025Panel upgradeInstall 300 amp service equipment to accommodate increased load in dedu, add new 200a feeder to dadu98199$10,000
Jul 16, 2024Panel upgradeInstall 200a service equipment, feeder and main panel on basement98116$6,000
Dec 22, 2023Panel upgradeReplace 200a panel Install wiring in house and garage98125$20,000
Jul 26, 2023Panel upgradeReplace 100a service equiplment with 125a, add feeder to new panel98103$5,000
Sep 23, 2022Panel upgradeInstall sub panel above garage and wire adu98199$15,000
Aug 9, 2022Panel upgradeRelocate and upgrade service at new approved location98112$25,000
Jul 25, 2022Panel upgradeReplace split bus 200a panel in basement98117$4,000
Jun 20, 2022Panel upgradeReplace damaged 200a panel in basement98115$3,500
Mar 10, 2022Panel upgradeReplace 125a main panel in basement98115$3,000
Mar 7, 2022Panel upgradeRelocate electrical service equipment, relocate main panel, rewire upstairs98107$25,000
Feb 7, 2022Panel upgradeReplace 100a main lug panel in apt#698107$2,000
Jan 31, 2022Panel upgradeUpgrade meter/panel to 200a rewire main floor outlets and lights98115$12,000
Jan 24, 2022Panel upgradeInstall 100a feeder to dadu sub panel98115$10,000

What to ask before you hire

About Neptune Electric Co

  • Ask for a certificate of liability insurance.
  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any panel upgrade electrician

  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Neptune Electric Co

Five quick questions. We pass your request to Neptune Electric Co.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Neptune Electric Co. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians near 98115 and 98199

See all 327 panel upgrade electricians in Seattle, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.