contractors.fyi
Sign in

Brs Permitting

Solar installer working in Seattle.

  • Seattle publishes no contractor license list we can check

245 jobs on Seattle permits, 2022 to 2025: 235 solar installations, 10 panel upgrades.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?Seattle publishes no contractor license list we can checkThat says nothing about this business either way.Ask them
Jobs on record245 jobs on Seattle permits, 2022 to 2025: 235 solar installations, 10 panel upgradesOur Seattle permit records cover October 2021 to September 2026.Of their 235 solar system permits, 2 mention a battery.

Records: the state Department of Labor and Industries and City of Seattle permits.

Cost and timing

Permit value (not a price)

Their typical permit lists $2,200 (half list more, half less)

That is the figure written on the permit form, which can be far from what you pay. What solar system jobs cost in Seattle.

Get 2 or 3 written quotes.

Permit timeline

Across Seattle, a solar system permit stays open about 43 days, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. How long solar system jobs take.

Track record

0 jobs in the last 12 months, down from 63 the year before

Q3 2022: 1 jobQ4 2022: 4 jobsQ1 2023: 20 jobsQ2 2023: 43 jobsQ3 2023: 25 jobsQ4 2023: 17 jobsQ1 2024: 28 jobsQ2 2024: 33 jobsQ3 2024: 11 jobsQ4 2024: 17 jobsQ1 2025: 13 jobsQ2 2025: 22 jobsQ3 2025: 11 jobsBusiest: 43 jobsLatest: 11 jobs202320242025
Each bar is 3 months of permits. The tallest is 43 jobs, April to June 2023. Across Seattle, all contractors together had 68% fewer solar system jobs in the last 12 months than in the 12 months before.

Where they work most

  • 9811735 jobs
  • 9810621 jobs
  • 9811521 jobs
  • 9810316 jobs
  • 9819915 jobs

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Sep 5, 2025Solar, 12.32 kW12.32 kW PV Solar Panel Installation on Roof - 28 panels [9-4-25 DR - Fee corrected, waved plan…98103$4,600
Aug 27, 2025Solar, 6.16 kW98144$2,200
Aug 25, 2025Solar, 3.52 kW98118$2,200
Aug 19, 2025Solar, 6.9 kW6.9 kW PV Solar Panel Installation on Roof98105$2,200
Aug 12, 2025Solar, 6.6 kW6.6 kW PV Solar Panel Installation on Roof -15 panels98112$2,200
Aug 6, 2025Solar, 5.28 kW98126$2,200
Jul 30, 2025Solar, 9.24 kW98117$4,600
Jul 30, 2025Solar, 6.88 kW98125$2,200
Jul 23, 2025SolarNo details on the permit98103$18,199
Jul 16, 2025Panel upgradeMPU REQUIRED - Replace and relocate meter with new 200A surface mount meter/main combination panel98146$5,500
Jul 16, 2025Solar, 6.16 kW98146$2,200
Jun 25, 2025Solar, 7.92 kW7.92kW PV Solar Panel Installation on Roof- 18 panels {6-24-25 DR - The stated value of the…98177$4,600
Jun 24, 2025Solar, 4.84 kW98144$2,200
Jun 24, 2025Solar, 5.28 kW98106$2,200
Jun 17, 2025Panel upgradeMPU REQUESTED - Replace meter with new 200A surface mount meter/main combination panel98116$6,000
Jun 17, 2025Panel upgradeMPU REQUIRED - Replace meter with new 200A surface mount meter/main combination panel with feed…98133$9,595
Jun 13, 2025Solar, 9.68 kW9.68 kW PV Solar Panel Installation on Roof- 22 panels98118$4,600
Jun 13, 2025Solar, 3.52 kW3.52 kW PV Solar Panel Installation on Roof - 8 panels PURLIN UPGRADE REQUIRED. MPU REQUIRED98133$2,200
Jun 12, 2025Solar, 11.44 kW11.44kW PV Solar Panel Installation on Roof- 26 panels [6-12-25 DR - Waved review, system is less…98115$4,600
Jun 11, 2025Solar, 12.76 kW(10/9/25DH: work done under #7101282-EL. OK close)12.76 kW PV Solar Panel Installation on Roof- 29…98144$4,600
Jun 11, 2025Solar, 6.6 kW98116$2,200
Jun 10, 2025Solar, 12.32 kW98117$4,600
Jun 10, 2025Solar, 10.58 kW10.58 kW PV Solar Panel Installation on Roof - 23 panels STRUCTURAL NOTES Exterior conduit required…98126$4,600
Jun 6, 2025SolarRemoval and reinstallation of rooftop mounted photovoltaic solar system98102$2,200
Jun 5, 2025Solar, 3.96 kW98103$2,200
Jun 4, 2025Solar, 5.28 kW98122$2,200
Jun 4, 2025Solar, 7.48 kW98178$2,200
Jun 4, 2025Solar, 4.4 kW10 panels to be retrofit added to the existing system, 4.4 Kw PV Solar Panel Installation on Roof98117$2,200
May 13, 2025Solar, 11.44 kW11.44 kW PV Solar Panel Installation on Roof- 26 Panels [5-9-25 DR - Fee corrected98178$4,600
Apr 29, 2025Solar, 3.52 kW98117$2,200
Apr 24, 2025Solar, 3.22 kW98117$2,200
Apr 10, 2025Solar, 6.6 kW98118$2,200
Apr 10, 2025Solar, 7.04 kW98126$2,200
Mar 28, 2025Solar, 10.56 kW10.56 kW PV Solar Panel Installation on Roof [3-28-25 DR - Fee corrected for 2025 fee schedule,…98122$4,600
Mar 6, 2025Solar, 8.28 kW8.28 kW PV Solar Panel Installation on Roof -reroof required [3-6-25 DR - Permit fee to be…98106$4,600
Mar 6, 2025Solar, 7.36 kW98117$2,200
Feb 25, 2025Solar, 13.8 kW13.8 kW PV Solar Panel Installation on Roof- 30 panels [2-24-25 DR - Fee is undervalued at a value…98103$4,600
Feb 21, 2025Solar, 7.82 kW7.82 kW PV Solar Panel Installation on Roof [2-21-25 DR - Fee corrected per the new 2025 fee…98116$4,600
Jan 31, 2025Panel upgradeExisting main electrical panel does not have adequate working clearances as required by NEC 110.26…98199$7,365
Jan 30, 2025Solar, 7.31 kW98199$2,200

What to ask before you hire

About Brs Permitting

  • Ask for their license number and check it with the state.
  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any solar installer

  • Can you show me proof of liability insurance and your bond?
  • What size system, which panels and inverter, and what will it make in a year?
  • Is my roof good for 25 more years, and what if it needs work first?
  • Who handles the permit and the utility's approval to turn it on?

Get a quote from Brs Permitting

Five quick questions. We pass your request to Brs Permitting.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Brs Permitting. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More solar installers near 98117 and 98106

See all 33 solar installers in Seattle, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.