contractors.fyi
Sign in

Casassa Electrical Design LLC

Panel upgrade electrician based in Seattle.

  • License active
  • Bond on file

17 jobs on Seattle permits, 2022 to 2025: 12 panel upgrades, 5 EV charger installations. 133rd most panel upgrade permits of 327 contractors in Seattle.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?License CASASED834CH, active in the state's records on Oct 3, 2026Electrical contractor, residential specialtyChecks out
Insurance and bond?Bond $4,000 on file with the state, with no end date (it stays in force until the bond company cancels it)The state keeps no liability insurance records for electrical contractors, so ask for a certificate.Bond on file
Jobs on record17 jobs on Seattle permits, 2022 to 2025: 12 panel upgrades, 5 EV charger installations133rd most panel upgrade permits of 327 licensed contractors in Seattle. That counts jobs, not quality.Our Seattle permit records cover October 2021 to September 2026.

Records: the state Department of Labor and Industries and City of Seattle permits.

Cost and timing

Permit value (not a price)

Their typical permit lists $6,500 (half list more, half less)

That is the figure written on the permit form, which can be far from what you pay. What panel upgrade jobs cost in Seattle.

Get 2 or 3 written quotes.

Permit timeline

Across Seattle, a panel upgrade permit stays open about 37 days, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. How long panel upgrade jobs take.

Track record

Jobs per quarter

Q1 2022: 2 jobsQ2 2022: 3 jobsQ3 2022: 1 jobQ4 2022: 3 jobsQ1 2023: 1 jobQ2 2023: 1 jobQ4 2023: 1 jobQ2 2024: 1 jobQ1 2025: 1 jobQ2 2025: 1 jobQ3 2025: 1 jobQ4 2025: 1 jobBusiest: 3 jobsLatest: 1 job2022202320242025
Each bar is 3 months of permits. The tallest is 3 jobs, April to June 2022.

Where they work most

  • 981183 jobs
  • 981442 jobs
  • 981171 job
  • 981191 job
  • 981991 job

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Oct 8, 2025Panel upgrade200-amp service upgrade98144$7,000
Sep 11, 2025Panel upgrade200-amp panel change out to new 200-amp panelNot listed$5,000
Apr 28, 2025Panel upgrade200-amp panel change-out98144$5,000
Jan 7, 2025EV charger60-Amp Car Charger Installation98117$2,000
Jun 19, 2024EV charger60-amp car charger addition98118$2,000
Nov 2, 2023Panel upgradeService Upgrade from 125-amp to 200-ampNot listed$10,000
Apr 14, 2023Panel upgradeReplacing two knob and tube circuits in attic98118$10,000
Jan 18, 2023Panel upgradeFull house remodel98119$50,000
Dec 9, 2022EV charger50-amp car charger circuit98199$3,000
Nov 2, 2022Panel upgradePanel change from 200-amp to 200-amp main breaker panel98118$6,000
Oct 18, 2022Panel upgradeService upgrade to 200-ampsNot listed$9,000
Sep 13, 2022Panel upgradeService upgrade from 125-amp to 200-amp98115$7,000
May 28, 2022Panel upgrade200-amp panel move/replacement. 60-amp car charger circuit additionNot listed$5,000
May 28, 2022EV charger200-amp panel move/replacement. 60-amp car charger circuit additionNot listed$5,000
Apr 10, 2022EV charger20-amp dedicated circuit for sump pump98105$5,000
Mar 20, 2022Panel upgradeService Upgrade to 200-amps98116$5,000
Mar 7, 2022Panel upgrade200-amp service upgradeNot listed$4,000

What to ask before you hire

About Casassa Electrical Design LLC

  • Ask for a certificate of liability insurance.
  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any panel upgrade electrician

  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Casassa Electrical Design LLC

Five quick questions. We pass your request to Casassa Electrical Design LLC.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Casassa Electrical Design LLC. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians near 98118 and 98144

See all 327 panel upgrade electricians in Seattle, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.