contractors.fyi
Sign in

Parker Brothers Electric LLC

Panel upgrade electrician working in Seattle.

  • Seattle publishes no contractor license list we can check

18 jobs on Seattle permits, 2023 to 2025: 13 panel upgrades, 4 EV charger installations, 1 solar installation.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?Seattle publishes no contractor license list we can checkThat says nothing about this business either way.Ask them
Jobs on record18 jobs on Seattle permits, 2023 to 2025: 13 panel upgrades, 4 EV charger installations, 1 solar installationOur Seattle permit records cover October 2021 to September 2026.

Records: the state Department of Labor and Industries and City of Seattle permits.

Cost and timing

Permit value (not a price)

Their typical permit lists $5,500 (half list more, half less)

That is the figure written on the permit form, which can be far from what you pay. What panel upgrade jobs cost in Seattle.

Get 2 or 3 written quotes.

Permit timeline

Across Seattle, a panel upgrade permit stays open about 37 days, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. How long panel upgrade jobs take.

Track record

2 jobs in the last 12 months, down from 9 the year before

Q3 2023: 1 jobQ1 2024: 1 jobQ2 2024: 2 jobsQ3 2024: 3 jobsQ4 2024: 2 jobsQ1 2025: 2 jobsQ2 2025: 3 jobsQ3 2025: 2 jobsQ4 2025: 2 jobsBusiest: 3 jobsLatest: 2 jobs20242025
Each bar is 3 months of permits. The tallest is 3 jobs, July to September 2024. Across Seattle, all contractors together had 74% fewer panel upgrade jobs in the last 12 months than in the 12 months before.

Where they work most

  • 981185 jobs
  • 981034 jobs
  • 981443 jobs
  • 981122 jobs
  • 981091 job

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

A row marked ×2 or more stands for that many similar jobs on one day in one ZIP code.

DateWorkZIPOn the permit form
Dec 18, 2025Panel upgradeIn-Kind replacement of wiring, outlets, switches98118$1,000
Nov 17, 2025Panel upgradeThis permit is for the SFR and the AADU Facing Harris Pl S (North Side of Dev Site) [11/17/25 BGO -…98144not stated
Jul 3, 2025EV charger (×2, same day)40-amp Car Charger98103not stated each
Apr 28, 2025Panel upgradeInstall underground conduits for sub panels98118$5,000
Apr 16, 2025Panel upgradeRemodel - Installing new panel, Circuits, Sauna & EV Charger98112$8,000
Apr 16, 2025EV chargerRemodel - Installing new panel, Circuits, Sauna & EV Charger98112$8,000
Feb 17, 2025Panel upgradeElectrical Wiring of Residential Home - Installing 200-amp panel, dedicated appliance circuits in…98103$20,000
Feb 17, 2025EV chargerElectrical Wiring of Residential Home - Installing 200-amp panel, dedicated appliance circuits in…98103$20,000
Dec 20, 2024Panel upgradeInstall subpanel, dedicated circuits for gym equipment, sauna and heater98109$5,000
Nov 20, 2024Panel upgrade300 Amp Panel and Feeders98116$5,000
Sep 27, 2024Panel upgradeAdditional scope of work to permit #6996209-EL - Panel Change, hot tub circuit, deck heaters, and…98102$6,000
Sep 4, 2024Panel upgrade325amp Meter and 200 amp panel98118$5,000
Aug 30, 2024Solar, 12 kWInstalling solar panels under 12 KW with no battery back up98144$10,000
May 1, 2024Panel upgrade325 AMP Service98144$5,000
Apr 4, 2024Panel upgradeHouse remodel - Installing Panel, Installing new lighting, new circuits, switches, receptacles,…98108$15,000
Jan 25, 2024Panel upgradeInstall a new main breaker Eaon 200-amp panel system, Install all new breakers, Install all new…98118$15,999
Sep 13, 2023Panel upgradeRemodel - install conduit to feed DADU, wiring to feed existing usable circuits, new kitchen…98118$10,000

What to ask before you hire

About Parker Brothers Electric LLC

  • Ask for their license number and check it with the state.
  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any panel upgrade electrician

  • Can you show me proof of liability insurance and your bond?
  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Parker Brothers Electric LLC

Five quick questions. We pass your request to Parker Brothers Electric LLC.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Parker Brothers Electric LLC. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians near 98118 and 98103

See all 327 panel upgrade electricians in Seattle, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.