contractors.fyi
Sign in

Lights On Electric LLC

Panel upgrade electrician based in Bothell.

  • License active
  • Bond on file

16 jobs on Seattle permits, 2022 to 2025: 13 panel upgrades, 3 EV charger installations. 123rd most panel upgrade permits of 327 contractors in Seattle.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?License LIGHTEL937PK, active in the state's records on Oct 3, 2026Electrical contractorChecks out
Insurance and bond?Bond $4,000 on file with the state, with no end date (it stays in force until the bond company cancels it)The state keeps no liability insurance records for electrical contractors, so ask for a certificate.Bond on file
Jobs on record16 jobs on Seattle permits, 2022 to 2025: 13 panel upgrades, 3 EV charger installationsThey are based in Bothell. Work outside Seattle is not in these records.123rd most panel upgrade permits of 327 licensed contractors in Seattle. That counts jobs, not quality.Our Seattle permit records cover October 2021 to September 2026.

Records: the state Department of Labor and Industries and City of Seattle permits.

Cost and timing

Permit value (not a price)

Their typical permit lists $5,000 (half list more, half less)

That is the figure written on the permit form, which can be far from what you pay. Kitchen jobs alone: typical permit $7,500 (6 permits, a small sample). What panel upgrade jobs cost in Seattle.

Get 2 or 3 written quotes.

Permit timeline

Across Seattle, a panel upgrade permit stays open about 37 days, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. How long panel upgrade jobs take.

Track record

2 jobs in the last 12 months, down from 6 the year before

Q1 2022: 2 jobsQ3 2022: 2 jobsQ1 2023: 1 jobQ3 2023: 1 jobQ1 2024: 1 jobQ2 2024: 1 jobQ4 2024: 1 jobQ2 2025: 3 jobsQ3 2025: 2 jobsQ4 2025: 2 jobsBusiest: 3 jobs2022202320242025
Each bar is 3 months of permits. The tallest is 3 jobs, April to June 2025. Across Seattle, all contractors together had 74% fewer panel upgrade jobs in the last 12 months than in the 12 months before.

Where they work most

  • 981991 job
  • 981221 job
  • 981031 job
  • 981261 job

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Oct 20, 2025Panel upgradeOutdoor panel on post for sauna powerNot listed$2,000
Oct 8, 2025EV chargerAdd 30 amp/24 amp ev chargingNot listed$2,000
Aug 20, 2025Panel upgradeNew panel, existing meter baseNot listed$10,000
Jul 25, 2025Panel upgradeExisting Tri-plex, converting storage to bedroom new panel remodel [11-12-25 D Rankin - Unit on…98199$50,000
May 6, 2025Panel upgradeNew overhead service upgradedNot listed$5,000
Apr 6, 2025Panel upgradeBasement remodel[4/16/2025 JBC Added 60amp Feeder for moved panel]98122$5,000
Apr 1, 2025Panel upgradeKitchen remodel, new panel98103$5,000
Oct 7, 2024Panel upgradeSun room remodeledNot listed$5,000
May 20, 2024Panel upgradePrimary remodel, kitchen, new panel, bath's remodeledNot listed$10,000
Feb 15, 2024Panel upgradeNew overhead meter main, outdoor panel, kitchen remodelNot listed$10,000
Sep 19, 2023EV chargerMaster bed and bath addition98126$5,000
Jan 24, 2023Panel upgradeMaster bedroom and bathroom addition and sub panelNot listed$5,000
Sep 19, 2022Panel upgradeBathroom remodels, 6-3 in walls for future erv in garageNot listed$5,000
Sep 19, 2022Panel upgradeKitchen remodel, sub panel in garage to make room for AFCI breakersNot listed$5,000
Mar 3, 2022EV chargerCar charger 50 A. OutletsNot listed$1,500
Jan 14, 2022Panel upgradeSub panel and kitchen remodelNot listed$5,000

What to ask before you hire

About Lights On Electric LLC

  • Ask for a certificate of liability insurance.
  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any panel upgrade electrician

  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Lights On Electric LLC

Five quick questions. We pass your request to Lights On Electric LLC.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Lights On Electric LLC. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians near 98199 and 98122

See all 327 panel upgrade electricians in Seattle, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.