317 jobs on Seattle permits, 2021 to 2026: 146 solar installations, 90 panel upgrades, 81 EV charger installations. 6th most solar system permits of 33 contractors in Seattle.

What the records show vs. what they say

The public record next to the business's own words.

QuestionRecords showThey sayMark
Licensed?License NORTHES876MA, active in the state's records on Oct 3, 2026Electrical contractorShows license NORTHES876MA on its websiteChecks out
Insurance and bond?Bond $4,000 on file with the state, with no end date (it stays in force until the bond company cancels it)The state keeps no liability insurance records for electrical contractors, so ask for a certificate.Bond on file
In business?Says established in 2011 by Master Electrician Derek White
Jobs on record317 jobs on Seattle permits, 2021 to 2026: 146 solar installations, 90 panel upgrades, 81 EV charger installationsThey are based in Kenmore. Work outside Seattle is not in these records.6th most solar system permits of 33 licensed contractors in Seattle. That counts jobs, not quality.Our Seattle permit records cover October 2021 to September 2026.Of their 146 solar system permits, 41 mention a battery.

In their words

  • Services: Solar energy systems, Battery backup systems, Electrical work, EV charging
    and 3 moreSPAN smart panel upgrades, Tesla Solar Roof installation, Fuel cell systems
  • Warranty: S
  • Warranty: A
  • Warranty: Y
  • Warranty: S
  • Warranty:
  • Warranty: W
  • Warranty: A
  • Warranty: R
  • Warranty: R
  • Warranty: A
  • Warranty: N
  • Warranty: T
  • Warranty: I
  • Warranty: E
  • Warranty: S
  • Warranty:
  • Warranty: P
  • Warranty: A
  • Warranty: G
  • Warranty: E
  • Warranty:
  • Warranty: A
  • Warranty: V
  • Warranty: A
  • Warranty: I
  • Warranty: L
  • Warranty: A
  • Warranty: B
  • Warranty: L
  • Warranty: E
  • Certified: NABCEP-accredited company (a maker's or trade group's program; each lists its members on its own website)
  • Certified: First company in Washington NABCEP-accredited
  • Works in: Washington State, King County, Snohomish County, Kitsap County, Pierce County, Skagit County, Seattle, Bellevue and 7 more

Records: the state Department of Labor and Industries and City of Seattle permits. They say: nwsolar.com, read October 2026, summed up by us. We checked the site is theirs (it shows their license on record). We have not checked that the claims are true.

Cost and timing

Rebates

They say: 30% Income Tax Credit available for solar and battery systems

Permit value (not a price)

Their typical permit lists $20,000 (half list more, half less)

That is the figure written on the permit form, which can be far from what you pay. Over their last 12 months (12 permits) it was $25,211. What solar system jobs cost in Seattle.

Get 2 or 3 written quotes.

Permit timeline

Across Seattle, a solar system permit stays open about 43 days, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. How long solar system jobs take.

Track record

17 jobs in the last 12 months, down from 66 the year before

Q4 2021: 17 jobsQ1 2022: 16 jobsQ2 2022: 35 jobsQ3 2022: 24 jobsQ4 2022: 21 jobsQ1 2023: 19 jobsQ2 2023: 38 jobsQ3 2023: 16 jobsQ4 2023: 15 jobsQ1 2024: 12 jobsQ2 2024: 10 jobsQ3 2024: 11 jobsQ4 2024: 14 jobsQ1 2025: 14 jobsQ2 2025: 19 jobsQ3 2025: 19 jobsQ4 2025: 11 jobsQ1 2026: 1 jobQ3 2026: 5 jobsBusiest: 38 jobsLatest: 5 jobs20222023202420252026
Each bar is 3 months of permits. The tallest is 38 jobs, April to June 2023. Across Seattle, all contractors together had 68% fewer solar system jobs in the last 12 months than in the 12 months before.

Where they work most

  • 9810339 jobs
  • 9812532 jobs
  • 9811530 jobs
  • 9811224 jobs
  • 9810521 jobs

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Sep 21, 2026Solar, 11.5 kW(31) tesla solar panel 420w modules (02) tesla powerwall3 with 11.5kw built-in inverter (01) tesla…98119$69,113
Aug 31, 2026Solar, 11.5 kW36) silfab solar sil-440 qd modules (02) tesla powerwall 3 with 11.5kw built-in inverter (12) tesla…98177$65,098
Aug 17, 2026EV chargerInside electrical room install 50 amp breaker disconnect to unit 301. Inside disconnect install…98119$2,000
Jul 9, 2026Solar, 12.76 kW12.76kw dc/ 10.12kw ac roof mounted pv system:(29) silfab solar sil-440 qd modules(29) enphase…98144$21,875
Jul 6, 2026SolarInstallation of (3)Silfab 520-QM Solar panels, (2)Tesla Powerwall 3s, (1)Tesla BUG, (1)SPAN 40…98103$22,652
Feb 3, 2026Solar(39)Silfab 440-QD Solar Panels, (2)Tesla PVIs [2/2/26 BGO - Approved PV Plan Set] [6/8/2026 BGO -…98118$19,200
Dec 29, 2025EV chargerElectric vehicle charging station install98109not stated
Dec 23, 2025Solar(2) FRANKLINWH APOWER 2 BATTERY storage system added to existing solar [12/12/25 BGO - Fees…98126$19,200
Dec 15, 2025Solar, 15.400 kW15.400KW DC/ 15.200KW AC ROOF MOUNTED PV SYSTEM [12/15/25 BGO - Approved PV Plan Set] (35)…98115$19,200
Dec 10, 2025Panel upgradePanel upgrade (like for like)98133$3,000
Nov 20, 2025Solar(2) Tesla PW3s (1) Tesla DC Expansion with Tesla Backup Gateway 3 [11/18/25 BGO - Approved ESS…98112$27,771
Nov 13, 2025Solar, 10.120 kW(n) 10.120kw dc/ 7.600kw ac roof mounted pv system (23) silfab solar sil-440 qd modules (01) tesla…98177$5,000
Nov 11, 2025EV chargerEV charger to be powered by 60 amp Eaton BR breaker98136$1,379
Nov 6, 2025Solar(30) Silfab 440-QD Prime NTC [11/06/25 BGO - Approved PV+ESS Plan Set]  (1) Powerwall 3…98115$30,829
Nov 6, 2025Solar, 10.12 kW10.12kW PV system, utilizing Silfab 440 QD Prime NTC solar modules and Tesla Stand Alone PVI. 1x…98133$34,135
Oct 7, 2025Solar, 10.56 kWPV System Details: 10.56kW PV system, utilizing Silfab 440 QD Prime NTC solar modules98103$28,667
Oct 1, 2025Panel upgradePanel change - like for like - Randy Nelson 1443398118not stated
Sep 22, 2025Solar, 7.920 kW(n) 7.920kw dc/5.940kw ac roof mounted pv system (18) silfab solar sil-440 qd modules (18) enphase…98126$24,394
Sep 17, 2025Panel upgradeInstallation of 30 circuit 100 Amp sub panel98125$3,293
Sep 17, 2025SolarSolar PV system: (14) Silfab 440-QD Prime NTC98112$19,404
Sep 16, 2025Solar, 6.160 kW98109$17,371
Sep 16, 2025Solar, 12 kWInstallation of roof-mounted PV system <12 kW, Silfab 440 QD Prime NTC solar modules98136$20,314
Sep 16, 2025SolarInstallation of roof-mounted PV system, 18 Silfab 440W modules98136$22,876
Sep 12, 2025SolarInstallation of roof-mounted PV system, 10 Silfab 440W modules with 10 Enphase IQ8M-72-2-US…98102$13,993
Aug 21, 2025EV charger, 11.5 kWInstallation of ESS system: 1 Tesla PW3 11.5 kW. Solar under permit 7101606-EL. [8/21/2025 BGO -…98103$8,565
Aug 18, 2025SolarInstallation of manual transfer switch for Anker battery F38000Plus - Solar on seperate permit…98133$1,325
Aug 14, 2025Solar, 5.720 kW98103$15,575
Aug 11, 2025Panel upgradeNo details on the permit98102not stated
Aug 8, 2025Panel upgradeInstallation of 1X EcoFlow Delta Pro Battery, and 1X EcoFlow Smart Home Panel (old OTC…98115$4,600
Aug 7, 2025Panel upgrade98103$3,000
Aug 1, 2025EV chargerInstallation of 2 EV circuits and 1 20amp 120v outlet98112$5,444
Jul 24, 2025Solar, 15.840 kWInstallation of 1 Tesla PW3, roof-mounted PV system, 36 Silfab 440W modules, 15.840 kW DC…98102$20,790
Jul 24, 2025Solar, 6.60 kW98126$17,847
Jul 23, 2025Solar, 9.24 kW98103$22,149
Jul 14, 2025Panel upgradePanel upgrade98105$3,500
Jul 2, 2025Solar, 5.72 kW5.72kW AC solar system installation with 54kWh of ESS installation utilizing (1) Tesla Powerwall 3…98112$4,600
Jun 30, 2025Solar, 11.5 kWInstallation of roof-mounted PV system, 57 modules 440W. 2 Tesla PW3 with 11.5 kW built-in…98112$19,200
Jun 23, 2025Panel upgradePanel upgrade98115$10,000
Jun 18, 2025Panel upgradeLike for like upgrade of existing panel[9/5/2025 JBC Credited (1)125amp Service Panel and added (2)…98112$3,500
Jun 18, 2025Solar, 20.240 kW98133$4,800

What to ask before you hire

About Northwest Electric & Solar

  • Ask for a certificate of liability insurance.
  • Ask which rebates apply to your job and who files the paperwork.
  • Ask for the workmanship warranty in writing: how many years, and what it covers.
  • Check each certification on the maker's or group's own website. Contractors must renew them.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any solar installer

  • What size system, which panels and inverter, and what will it make in a year?
  • Is my roof good for 25 more years, and what if it needs work first?
  • Who handles the permit and the utility's approval to turn it on?

Get a quote from Northwest Electric & Solar

Five quick questions. We pass your request to Northwest Electric & Solar.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Northwest Electric & Solar. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More solar installers near 98103 and 98125

See all 33 solar installers in Seattle, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.