contractors.fyi
Sign in

Raincap Construction + Electric

Panel upgrade electrician based in Seattle.

  • License active
  • Insurance and bond on file

58 jobs on Seattle permits, 2021 to 2024: 42 panel upgrades, 16 EV charger installations. 38th most panel upgrade permits of 327 contractors in Seattle.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?License RAINCCI931PT, active in the state's records on Oct 3, 2026Construction contractorChecks out
Insurance and bond?Bond $30,000 on file with the state, with no end date (it stays in force until the bond company cancels it)Liability insurance $1,000,000 on file with the state, until Aug 19, 2027.On file
Jobs on record58 jobs on Seattle permits, 2021 to 2024: 42 panel upgrades, 16 EV charger installations38th most panel upgrade permits of 327 licensed contractors in Seattle. That counts jobs, not quality.Our Seattle permit records cover October 2021 to September 2026.

Records: the state Department of Labor and Industries and City of Seattle permits.

Cost and timing

Permit value (not a price)

Their typical permit lists $7,000 (half list more, half less)

That is the figure written on the permit form, which can be far from what you pay. Kitchen jobs alone: typical permit $27,000 (4 permits, a small sample). What panel upgrade jobs cost in Seattle.

Get 2 or 3 written quotes.

Permit timeline

Across Seattle, a panel upgrade permit stays open about 37 days, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. How long panel upgrade jobs take.

Track record

Jobs per quarter

Q4 2021: 8 jobsQ1 2022: 3 jobsQ2 2022: 11 jobsQ3 2022: 5 jobsQ4 2022: 3 jobsQ1 2023: 7 jobsQ2 2023: 4 jobsQ3 2023: 4 jobsQ4 2023: 7 jobsQ2 2024: 2 jobsQ3 2024: 2 jobsQ4 2024: 2 jobsBusiest: 11 jobsLatest: 2 jobs202220232024
Each bar is 3 months of permits. The tallest is 11 jobs, April to June 2022.

Where they work most

  • 981032 jobs
  • 981251 job
  • 981121 job
  • 981171 job
  • 981261 job

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Dec 5, 2024EV chargerAdd an EV charger98103$1,600
Nov 11, 2024Panel upgradeMoving panel location [C.Kenefick 11/14/24 - second feeder added to permit98103$5,000
Sep 20, 2024Panel upgradeEV charger install with sub panelNot listed$7,600
Sep 20, 2024EV chargerEV charger install with sub panelNot listed$7,600
Jun 3, 2024Panel upgradeInspection only for compliance with service upgradeNot listednot stated
Apr 18, 2024Panel upgradePanel replacement98125$4,000
Dec 29, 2023Panel upgrade200 amp panel changeNot listed$2,400
Dec 29, 2023Panel upgradePanel change at the main houseNot listed$5,500
Oct 30, 2023EV chargerWire new car charger and feeder at the detached garageNot listed$3,000
Oct 25, 2023Panel upgradeReplace older 200 amp meter w/new 200 amp meter/panel w/disconnectNot listed$2,000
Oct 25, 2023Panel upgradeWire up new car chargerNot listed$1,900
Oct 25, 2023EV chargerAdd car chargerNot listed$1,500
Oct 25, 2023EV chargerWire up new car chargerNot listed$1,900
Aug 21, 2023EV chargerAdd car charger Add dining room lightNot listed$2,000
Jul 31, 2023EV chargerAdding car charger to garageNot listed$2,500
Jul 10, 2023Panel upgradeNo details on the permitNot listed$28,000
Jul 10, 2023EV chargerUpgrade current electrical system to 200 amps. Add heat pump circuit for connection. Add car…Not listed$7,500
May 23, 2023EV chargerUpgrade service to 200 amps. Add car charger. Add one 15 or 20 amp circuit98112$2,800
Apr 19, 2023EV chargerAdding car charger and replacing bath fans98117$3,000
Apr 18, 2023Panel upgrade200 amp service upgrade98126$5,000
Apr 17, 2023Panel upgrade200 amp service upgrade, panel located in basementNot listed$5,000
Mar 13, 2023Panel upgradeBasement remodel/ Upsizing 200 amp panel (service is already 200 amps)/ Replacing some main floor…Not listed$20,000
Mar 6, 2023Panel upgradeAdding a 125 amp service to existing home and DADU [C.Kenefick 12/28/23 - fees added to permit,…Not listed$7,000
Feb 14, 2023Panel upgradeUpdating service to 200 ampsNot listed$7,000
Feb 1, 2023Panel upgradeUpdating service to 200 amps and installing new Meter/Main (40 space) outdoors as there is no good…Not listed$5,000
Feb 1, 2023EV chargerUpdating service to 200 amps and installing new Meter/Main (40 space) outdoors as there is no good…Not listed$5,000
Jan 12, 2023Panel upgrade200 amp service upgradeNot listed$5,000
Jan 12, 2023Panel upgradeUpdating service to 200 amps, turning existing panel into a sub panel and installing new panel in…Not listed$5,000
Nov 3, 2022Panel upgradeUpdating service to 200 amps/ Back-feeding existing panel from new panelNot listed$5,000
Oct 17, 2022Panel upgradeRewiring most of homeNot listed$24,000
Oct 7, 2022Panel upgradeInstalling feeder panel in main house to make room in main panel/ Running power from feeder to…Not listed$7,500
Sep 15, 2022Panel upgradeReplacing existing panel (already 200 amps) with larger 200 amp panel to accommodate future cooktopNot listed$2,500
Aug 31, 2022Panel upgradeHome rewire and 200 amp service upgradeNot listed$25,000
Aug 15, 2022Panel upgradeRewiring main floor of homeNot listed$25,000
Jul 21, 2022Panel upgradeReplacing 200 amp panel/ Running power for future EV installationNot listed$5,000
Jul 21, 2022EV chargerReplacing 200 amp panel/ Running power for future EV installationNot listed$5,000
Jun 20, 2022Panel upgradeUpgrading 100 amp service to 200 ampsNot listed$5,000
Jun 9, 2022Panel upgrade200 amp service upgradeNot listed$15,000
May 23, 2022EV chargerWiring unfinished basement and main floor bathroom/ Upgrading service to 200 amps/ Adding circuit…Not listed$24,000
May 11, 2022Panel upgradeUpgrading service to 200 amps/ Installing outdoor panel to pick up circuit for new electric range,…Not listed$8,000

What to ask before you hire

About Raincap Construction + Electric

  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any panel upgrade electrician

  • Can you show me proof of liability insurance and your bond?
  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Raincap Construction + Electric

Five quick questions. We pass your request to Raincap Construction + Electric.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Raincap Construction + Electric. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians near 98103 and 98125

See all 327 panel upgrade electricians in Seattle, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.