contractors.fyi
Sign in

Tapps Electric

Panel upgrade electrician based in Sumner.

  • License active
  • Insurance and bond on file

34 jobs on Seattle permits, 2022 to 2026: 25 panel upgrades, 5 heat pump installations, 4 EV charger installations. 63rd most panel upgrade permits of 327 contractors in Seattle.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?License TAPPSE*781QZ, active in the state's records on Oct 3, 2026Construction contractorThe same business also holds license TAPPSE*812QD (Electrical contractor), active in the state's records.Checks out
Insurance and bond?Bond $30,000 on file with the state, with no end date (it stays in force until the bond company cancels it)Liability insurance $1,000,000 on file with the state, until Sep 1, 2027.On file
Jobs on record34 jobs on Seattle permits, 2022 to 2026: 25 panel upgrades, 5 heat pump installations, 4 EV charger installationsThey are based in Sumner. Work outside Seattle is not in these records.63rd most panel upgrade permits of 327 licensed contractors in Seattle. That counts jobs, not quality.Our Seattle permit records cover October 2021 to September 2026.

Records: the state Department of Labor and Industries and City of Seattle permits.

Cost and timing

Permit value (not a price)

Their typical permit lists $7,150 (half list more, half less)

That is the figure written on the permit form, which can be far from what you pay. Kitchen jobs alone: typical permit $4,000 (5 permits, a small sample). What panel upgrade jobs cost in Seattle.

Get 2 or 3 written quotes.

Permit timeline

Across Seattle, a panel upgrade permit stays open about 37 days, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. How long panel upgrade jobs take.

Track record

5 jobs in the last 12 months, down from 9 the year before

Q1 2022: 1 jobQ4 2022: 2 jobsQ1 2023: 2 jobsQ2 2023: 1 jobQ3 2023: 4 jobsQ4 2023: 2 jobsQ1 2024: 5 jobsQ2 2024: 1 jobQ3 2024: 2 jobsQ1 2025: 2 jobsQ2 2025: 6 jobsQ3 2025: 1 jobQ4 2025: 3 jobsQ1 2026: 1 jobQ2 2026: 1 jobBusiest: 6 jobs20222023202420252026
Each bar is 3 months of permits. The tallest is 6 jobs, April to June 2025. Across Seattle, all contractors together had 74% fewer panel upgrade jobs in the last 12 months than in the 12 months before.

Where they work most

  • 981255 jobs
  • 981064 jobs
  • 981363 jobs
  • 981023 jobs
  • 981212 jobs

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Jun 10, 2026Heat pumpReplacement of (6) existing fan coil units and space heaters currently using electric resistance…98121$150,000
Jan 8, 2026Heat pumpHisense 4 ton R410A Heat Pump - Like for like replacement STFI98107$8,000
Nov 21, 2025Panel upgradeNew upgraded 320A service, split basement onto its own meter & panel, wire basement ADU98115$25,000
Nov 19, 2025Panel upgradeService upgrade to 320A, new construction of backyard DADU98118$25,000
Oct 13, 2025Panel upgradeKitchen is being moved around 6 feet to back wall close to stairs. We will need to junction and…98144$2,700
Aug 1, 2025Panel upgradeRewire, Panel and Service Change98106$18,000
Jun 16, 2025Panel upgradeInstall Panel - Replace old Challenger electrical panel with new Eaton BR 30 space panel - Install…98109$1,500
May 15, 2025Panel upgradeNo details on the permit98136not stated
May 15, 2025EV chargerNo details on the permit98136not stated
May 9, 2025Panel upgradeNo details on the permit98125$1,600
May 9, 2025EV chargerNo details on the permit98125$1,600
May 5, 2025Panel upgradeMain Service Equipment Upgrade  Supply and install a new 200-amp exterior electrical…98103$5,000
Jan 16, 2025Panel upgradeNo details on the permit98136$12,000
Jan 2, 2025Panel upgradeCondo needs a full service replacement and knob & tube rewire98105$4,000
Aug 27, 2024EV chargerAdding a level 2 EV charger to a parking spot98125$15,000
Aug 15, 2024Heat pumpDuctless mini-split install98115$20,000
May 16, 2024Panel upgradeUnit 007: 200A Indoor Panel (Good)98121$1,500
Feb 22, 2024Panel upgradeReplace (10) 100a Zinsco electric panels with new 100a Eaton BR electric panels98109$20,000
Feb 19, 2024Panel upgrade200 Amp Panel Change98102$25,000
Jan 31, 2024EV chargerNo details on the permit98106not stated
Jan 29, 2024Panel upgradePartial knob and tube rewire - 200A Panel Change - Whole Home Surge Protection98102$30,000
Jan 9, 2024Heat pumpReplacement of Furnace and Heat Pump98125$10,000
Dec 11, 2023Heat pumpReplacement of Mini Split - 3 Zone Mitsubishi with 2 heads98106$9,000
Oct 2, 2023Panel upgradeAddition of master bedroom and bathroom 6 circuits and a service change (addition onto home)98146$10,000
Sep 22, 2023Panel upgradeInstall new meter base, mast riser with wire and support kits. - Install new 42 space panel with…98125$6,000
Aug 28, 2023Panel upgradePanel change98118$3,000
Aug 9, 2023Panel upgradeDemo/tieback and panel relocate to kitchen with service and mast rebuild. -Demo and tie back all…98178$4,000
Jul 19, 2023Panel upgradeKitchen & Master Suite Addition With a 200amp Panel Change98177$9,000
May 16, 2023Panel upgrade[Unit 308] Relocate the range receptacle up to 12" so that it fits within the rear cutout section…98119not stated
Jan 27, 2023Panel upgrade320 Amp Service, Whole Home Rewire, Basement ADU. 1/23/2024 renewal98102$50,000
Jan 12, 2023Panel upgradeBring 20a dedicated circuit from panel in garage, through crawl space, to the washer located in the…Not listed$2,375
Nov 15, 2022Panel upgrade200 Amp like for like Panel Change (3) 72" 120v 1000 Watt Baseboard HeatersNot listed$5,000
Nov 11, 2022Panel upgradeNo details on the permitNot listednot stated
Jan 27, 2022Panel upgrade200amp service & panel change98106$8,300

What to ask before you hire

About Tapps Electric

  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any panel upgrade electrician

  • Can you show me proof of liability insurance and your bond?
  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Tapps Electric

Five quick questions. We pass your request to Tapps Electric.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Tapps Electric. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians near 98125 and 98106

See all 327 panel upgrade electricians in Seattle, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.