contractors.fyi
Sign in

Ameritech Electrical and Air Conditioning

Panel upgrade electrician working in Austin.

  • No Texas electrical contractor license matched this business by the phone on its permits, or by its name in the same city

11 jobs on Austin permits, 2022 to 2025: 10 panel upgrades, 1 EV charger installation. 120th most panel upgrade permits of 327 contractors in Austin.

What the public records show

From the city's permits, one question at a time.

QuestionRecords showMark
Licensed?No Texas electrical contractor license matched this business by the phone on its permits, or by its name in the same cityLook them up on the state's license search.Ask them
Jobs on record11 jobs on Austin permits, 2022 to 2025: 10 panel upgrades, 1 EV charger installation120th most panel upgrade permits of 327 contractors in Austin. That counts jobs, not quality.Our Austin permit records cover September 2021 to September 2026.

Records: City of Austin permits.

Cost and timing

Permit timeline

Across Austin, a panel upgrade permit stays open about 62 days, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. Waiting for the permit adds about 6 days. How long panel upgrade jobs take.

Track record

Jobs per quarter

Q2 2022: 1 jobQ2 2023: 2 jobsQ1 2024: 1 jobQ3 2024: 3 jobsQ4 2024: 1 jobQ2 2025: 1 jobQ3 2025: 1 jobQ4 2025: 1 jobBusiest: 3 jobs202320242025
Each bar is 3 months of permits. The tallest is 3 jobs, July to September 2024.

Where they work most

  • 787453 jobs
  • 787042 jobs
  • 787591 job
  • 787491 job
  • 787581 job

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Oct 27, 2025Panel upgradeNo details on the permit78704not stated
Jul 9, 2025Panel upgradeInterior remodel to kitchen and 2 bathrooms adding to existing covered patio updating electric…78759not stated
Apr 1, 2025Panel upgradeI going to change old fedal pacific panel to new 200 amps panel and meter78749not stated
Oct 17, 2024Panel upgradeInstall new meter and panel 200 amps (tree broke the old service pole)78758not stated
Sep 30, 2024Panel upgradeRun new wire for shed on pic pipe under ground and install small panel 6 spaces78744not stated
Aug 19, 2024Panel upgradeChange 100 amps panel disconnect ( no meter)78750not stated
Jul 1, 2024Panel upgradeInstall new meter and new 200 amps panel whit new breakers78727not stated
Mar 20, 2024Panel upgradeRemove old panel federal pacific for new 200 amps panel78704not stated
May 2, 2023Panel upgradeChange old panel for 200 amps panel for more spaces and install 220 for car charger for Tesla78745not stated
May 2, 2023EV chargerChange old panel for 200 amps panel for more spaces and install 220 for car charger for Tesla78745not stated
May 3, 2022Panel upgradeChange outside panel whit 200 amps meter can78745not stated

What to ask before you hire

About Ameritech Electrical and Air Conditioning

  • Ask for their electrical contractor license number and check it with the state.
  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any panel upgrade electrician

  • Can you show me proof of liability insurance and your bond?
  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Ameritech Electrical and Air Conditioning

Five quick questions. We pass your request to Ameritech Electrical and Air Conditioning.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Ameritech Electrical and Air Conditioning. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians near 78745 and 78704

See all 327 panel upgrade electricians in Austin, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.