contractors.fyi
Sign in

Optomax Electric LLC

Panel upgrade electrician working in Austin.

  • License active

13 jobs on Austin permits, 2024 to 2026: 11 panel upgrades, 1 solar installation, 1 EV charger installation. 113th most panel upgrade permits of 327 contractors in Austin.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?Texas electrical contractor license 38900, valid until Feb 26, 2027We matched it by the phone on their permits.Checks out
Jobs on record13 jobs on Austin permits, 2024 to 2026: 11 panel upgrades, 1 solar installation, 1 EV charger installation113th most panel upgrade permits of 327 contractors in Austin. That counts jobs, not quality.Our Austin permit records cover September 2021 to September 2026.

Records: City of Austin permits.

Cost and timing

Permit timeline

Across Austin, a panel upgrade permit stays open about 62 days, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. Waiting for the permit adds about 6 days. How long panel upgrade jobs take.

Track record

1 job in the last 12 months, down from 6 the year before

Q2 2024: 3 jobsQ3 2024: 3 jobsQ4 2024: 2 jobsQ1 2025: 2 jobsQ2 2025: 2 jobsQ2 2026: 1 jobBusiest: 3 jobsLatest: 1 job20252026
Each bar is 3 months of permits. The tallest is 3 jobs, April to June 2024. Across Austin, all contractors together had 17% more panel upgrade jobs in the last 12 months than in the 12 months before.

Where they work most

  • 787493 jobs
  • 787592 jobs
  • 787042 jobs
  • 787542 jobs
  • 787021 job

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Jun 29, 2026Solar, 15.8 kW15.8 KW solar system78759not stated
Jun 10, 2025Panel upgradeUpgrade existing 125 amp overhead service to 200 amp Install 200 amp meter with bypass handle and…78702not stated
Apr 24, 2025Panel upgradeReplace existing 150 amp meter and main breaker panel with 200 amp meter with bypass handle and 200…78759not stated
Mar 11, 2025Panel upgradeReplace existing 125 main disconnect panel78704not stated
Feb 27, 2025Panel upgradeRequest to disconnect -Replace existing Main Lug Breaker Panel with 150 amp Main Breaker…78749not stated
Nov 12, 2024EV chargerInstall GFCI protected Nema-14-50 in garage to provide power for electric vehicle charger78754not stated
Nov 6, 2024Panel upgradeEmergency Overhead service rebuild78752not stated
Sep 17, 2024Panel upgradeRequest to disconnect -Replace existing damaged 100 amp main breaker panel78748not stated
Aug 12, 2024Panel upgradeBuild overhead service with metallic riser 200 amp meter and 125 amp main breaker panel78753not stated
Jul 18, 2024Panel upgradeReplace existing 150 amp main lug Challenger service panel with 150 amp Modern Main Breaker…78749not stated
Jun 22, 2024Panel upgradeReplace existing exterior main breaker and sub panel (Federal pacific). Install grounding system…78754not stated
Jun 12, 2024Panel upgradeReplace existing 150 amp meter enclosure and 100 amp back-fed main breaker panel with 200 amp meter…78749not stated
Jun 10, 2024Panel upgradeReplace damaged 200 amp main breaker panel with new 200 amp main breaker panel78704not stated

What to ask before you hire

About Optomax Electric LLC

  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any panel upgrade electrician

  • Can you show me proof of liability insurance and your bond?
  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Optomax Electric LLC

Five quick questions. We pass your request to Optomax Electric LLC.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Optomax Electric LLC. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians near 78749 and 78759

See all 327 panel upgrade electricians in Austin, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.