contractors.fyi
Sign in

Bird's Eye Electric

Panel upgrade electrician working in Austin.

  • License active

28 jobs on Austin permits, 2022 to 2026: 25 panel upgrades, 3 EV charger installations. 45th most panel upgrade permits of 327 contractors in Austin.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?Texas electrical contractor license 39856, valid until Jan 23, 2027We matched it by the phone on their permits.Checks out
Jobs on record28 jobs on Austin permits, 2022 to 2026: 25 panel upgrades, 3 EV charger installations45th most panel upgrade permits of 327 contractors in Austin. That counts jobs, not quality.Our Austin permit records cover September 2021 to September 2026.

Records: City of Austin permits.

Cost and timing

Permit timeline

Across Austin, a panel upgrade permit stays open about 62 days, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. Waiting for the permit adds about 6 days. How long panel upgrade jobs take.

Track record

3 jobs in the last 12 months, down from 10 the year before

Q4 2022: 1 jobQ2 2023: 1 jobQ3 2023: 4 jobsQ4 2023: 3 jobsQ1 2024: 3 jobsQ3 2024: 7 jobsQ4 2024: 1 jobQ2 2025: 1 jobQ3 2025: 4 jobsQ4 2025: 1 jobQ1 2026: 2 jobsBusiest: 7 jobs2023202420252026
Each bar is 3 months of permits. The tallest is 7 jobs, July to September 2024. Across Austin, all contractors together had 17% more panel upgrade jobs in the last 12 months than in the 12 months before.

Where they work most

  • 787315 jobs
  • 787234 jobs
  • 787353 jobs
  • 787032 jobs
  • 787042 jobs

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Mar 3, 2026Panel upgrade, 38 kWInstall ATS to back up sub panel at main house78757not stated
Jan 26, 2026Panel upgradeInstall ATS for sub panel back up at main house78702not stated
Nov 13, 2025Panel upgrade, 20 kWREQUEST TO DISCONNECT install 150 amp service rated ATS and 20KW generator78735not stated
Sep 19, 2025Panel upgradeUpgrade overhead service to 200 amp78731not stated
Sep 10, 2025Panel upgrade**REQUEST TO DISCONNECT install 150 amp ATS replace existing main panel w/ new MLO 150 amp sub…78703not stated
Sep 3, 2025Panel upgrade, 26 kWREQUEST TO DISCONNECT install 200 amp ATS 26KW generator replace existing 200 amp MCB panel with…78731not stated
Jul 11, 2025Panel upgrade, 26 kWUpgrade service to 200 amp78723not stated
Jun 11, 2025Panel upgrade, 60 kWRequest to disconnect Install 350 amp service rated ATS and 60 KW generator78703not stated
Oct 2, 2024Panel upgradeElectrical service upgrade for units A and B. will be installing new overhead riser and (2) AE…78741not stated
Sep 26, 2024Panel upgradeInstall 50 amp hardwired EV charger78723not stated
Sep 26, 2024EV chargerInstall 50 amp hardwired EV charger78723not stated
Sep 26, 2024Panel upgrade, 20 kWREQUEST TO DISCONNECT install 200 amp ATS on existing 200 amp panel78723not stated
Sep 24, 2024Panel upgradeREQUEST TO DISCONNECT install 150 amp and 200 amp automatic transfer switch on existing 150 amp and…78735not stated
Sep 6, 2024Panel upgradeUpgrade main electrical service to 200 amp78735not stated
Aug 15, 2024Panel upgrade, 22 kW**request to disconnect** install 150 amp ATS and 22kw generator78753not stated
Jul 25, 2024Panel upgrade200 amp service upgrade-install 200 amp ATS 200 amp meter enclosure new 200 amp mlo loadcenter…78739not stated
Mar 15, 2024Panel upgrade, 26 kW*request to disconnect* install 200 amp service rated ATS and 26kw generator78731not stated
Mar 4, 2024Panel upgrade, 26 kW*request to disconnect* install 200 amp service rated ATS and 26KW generator78704not stated
Feb 19, 2024EV chargerInstall 50 amp EV charger station - hardwired w/ GFCI protection built in78731not stated
Nov 27, 2023Panel upgradeInstall 200 amp overhead service upgrade in existing location with new 200 amp meter enclosure and…78704not stated
Oct 21, 2023Panel upgrade**request to disconnect** replace existing main MLO panel with new 150 amp main breaker panel78749not stated
Oct 19, 2023EV chargerInstall surface mount NEMA 14-50r with 50 amp 240v gfci breaker for ev charger78653not stated
Sep 21, 2023Panel upgradeService upgrade to 200 amp includes new 200 amp 42 circuit panel and new 200 amp meter can78731not stated
Aug 8, 2023Panel upgradeUpgrading existing 150amp service to 225amp78724not stated
Aug 8, 2023Panel upgrade, 26 kWReplace meter can install new 200 amp mcb panel install new 200 amp ATS install new 26KW generator78746not stated
Jul 31, 2023Panel upgradeInstall standalone overhead 200 amp meterloop at back NW corner of property with new 200 amp mcb…78751not stated
May 12, 2023Panel upgrade*Partial demo* Addition/remodel to existing 1-story single family residential to include: new…78746not stated
Dec 6, 2022Panel upgrade**request for disconnect -- install 200 amp main disconnect at meter per code78734not stated

What to ask before you hire

About Bird's Eye Electric

  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any panel upgrade electrician

  • Can you show me proof of liability insurance and your bond?
  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Bird's Eye Electric

Five quick questions. We pass your request to Bird's Eye Electric.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Bird's Eye Electric. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians near 78731 and 78723

See all 327 panel upgrade electricians in Austin, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.