contractors.fyi
Sign in

Jrs Electric LLC

Panel upgrade electrician working in Austin.

  • License active

25 jobs on Austin permits, 2022 to 2026: 24 panel upgrades, 1 EV charger installation. 53rd most panel upgrade permits of 327 contractors in Austin.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?Texas electrical contractor license 32629, valid until May 12, 2027We matched it by the phone on their permits.Checks out
Jobs on record25 jobs on Austin permits, 2022 to 2026: 24 panel upgrades, 1 EV charger installation53rd most panel upgrade permits of 327 contractors in Austin. That counts jobs, not quality.Our Austin permit records cover September 2021 to September 2026.

Records: City of Austin permits.

Cost and timing

Permit timeline

Across Austin, a panel upgrade permit stays open about 62 days, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. Waiting for the permit adds about 6 days. How long panel upgrade jobs take.

Track record

14 jobs in the last 12 months, up from 1 the year before

Q2 2022: 4 jobsQ3 2022: 3 jobsQ2 2023: 1 jobQ2 2024: 1 jobQ3 2024: 1 jobQ2 2025: 1 jobQ3 2025: 1 jobQ1 2026: 6 jobsQ2 2026: 4 jobsQ3 2026: 3 jobsBusiest: 6 jobs2023202420252026
Each bar is 3 months of permits. The tallest is 6 jobs, January to March 2026. Across Austin, all contractors together had 17% more panel upgrade jobs in the last 12 months than in the 12 months before.

Where they work most

  • 787453 jobs
  • 787572 jobs
  • 787022 jobs
  • 787532 jobs
  • 787352 jobs

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Sep 21, 2026Panel upgradeInstallation of EV charger78757not stated
Sep 21, 2026EV chargerInstallation of EV charger78757not stated
Jul 6, 2026Panel upgrade78702not stated
Jun 29, 2026Panel upgrade78753not stated
Jun 12, 2026Panel upgradeExpress: window replacement on front door light fixture replacement *** Service upgrade to…78731not stated
May 13, 2026Panel upgradeService upgrade wiring upgrade and sub panel replacement78735not stated
Apr 27, 2026Panel upgradeEmergency repair Meter can and main panel had to be replaced78723not stated
Mar 30, 2026Panel upgradeService upgrade to existing meter78750not stated
Mar 19, 2026Panel upgrade78704not stated
Mar 12, 2026Panel upgrade78745not stated
Feb 26, 2026Panel upgradeEmergency repair permit. Replacement of meter can replacement of damaged main panel78758not stated
Feb 10, 2026Panel upgradeService upgrade and indoor panel replacement78735not stated
Jan 15, 2026Panel upgrade78758not stated
Sep 28, 2025Panel upgradePanel replacement due ro burn buss78748not stated
Apr 7, 2025Panel upgrade*Partial Demo* Addition/Remodel to existing 1-Story SFR. Addition to include [New 1 bed 2bath] new…78737not stated
Aug 22, 2024Panel upgrade78702not stated
Jun 12, 2024Panel upgrade78753not stated
Apr 10, 2023Panel upgrade78704not stated
Aug 30, 2022Panel upgrade78745not stated
Jul 22, 2022Panel upgrade78752not stated
Jul 18, 2022Panel upgrade78745not stated
Jun 27, 2022Panel upgradeMain panel replacement Installation of vehicle charger in garage78729not stated
Jun 27, 2022Panel upgradeRebuild 150 amp service emergency repair78660not stated
Jun 6, 2022Panel upgrade78723not stated
Jun 6, 2022Panel upgrade78751not stated

What to ask before you hire

About Jrs Electric LLC

  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any panel upgrade electrician

  • Can you show me proof of liability insurance and your bond?
  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Jrs Electric LLC

Five quick questions. We pass your request to Jrs Electric LLC.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Jrs Electric LLC. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians near 78745 and 78757

See all 327 panel upgrade electricians in Austin, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.