contractors.fyi
Sign in

Power-up Electrical

Panel upgrade electrician working in Austin.

  • License active

24 jobs on Austin permits, 2023 to 2026: 21 panel upgrades, 2 solar installations, 1 EV charger installation. 64th most panel upgrade permits of 327 contractors in Austin.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?Texas electrical contractor license 36439, valid until Sep 18, 2027We matched it by the phone on their permits.Checks out
Jobs on record24 jobs on Austin permits, 2023 to 2026: 21 panel upgrades, 2 solar installations, 1 EV charger installation64th most panel upgrade permits of 327 contractors in Austin. That counts jobs, not quality.Our Austin permit records cover September 2021 to September 2026.

Records: City of Austin permits.

Cost and timing

Permit timeline

Across Austin, a panel upgrade permit stays open about 62 days, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. Waiting for the permit adds about 6 days. How long panel upgrade jobs take.

Track record

11 jobs in the last 12 months, up from 3 the year before

Q1 2023: 1 jobQ2 2023: 2 jobsQ3 2023: 2 jobsQ4 2023: 2 jobsQ3 2024: 3 jobsQ1 2025: 2 jobsQ2 2025: 1 jobQ4 2025: 3 jobsQ2 2026: 4 jobsQ3 2026: 4 jobsBusiest: 4 jobs2023202420252026
Each bar is 3 months of permits. The tallest is 4 jobs, April to June 2026. Across Austin, all contractors together had 17% more panel upgrade jobs in the last 12 months than in the 12 months before.

Where they work most

  • 787485 jobs
  • 787455 jobs
  • 787022 jobs
  • 787352 jobs
  • 787301 job

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Sep 7, 2026Panel upgradeReplacement of an existing exterior main Federal Pacific panel78748not stated
Aug 20, 2026Panel upgradeExterior Main panel replacement U/G78748not stated
Aug 11, 2026Panel upgradeExpress- Replace windows like for like across the house where we found water intrusion which…78730not stated
Jul 7, 2026Panel upgradeMain elctrica panel upgrade78727not stated
Jun 30, 2026Panel upgradeFPE Panel upgrade78745not stated
Jun 13, 2026Panel upgradeCompromised lug at meter base led to arcing inside main exterior panel78660not stated
Apr 15, 2026Panel upgradeFederal Pacific Panel main exterior panel replacement78745not stated
Apr 6, 2026Panel upgradeReplacing compromised FPE main electrical panel overhead78723not stated
Dec 16, 2025Panel upgradeExpress- Removal of rotting siding78745not stated
Nov 8, 2025Panel upgradeExpress- Replacement of old wooden siding & trim with new Hardie sidings and trim on existing…78751not stated
Nov 4, 2025Panel upgradeMain electrical upgrade of main disconnect panel78702not stated
Apr 17, 2025Panel upgradeNo details on the permit78725not stated
Mar 2, 2025Panel upgradeMain exterior electrical panel replacement78750not stated
Feb 16, 2025SolarNo details on the permit78735not stated
Aug 14, 2024Panel upgradeSwapping out Main disconnect panel keeping existing 200amp meter can78759not stated
Aug 1, 2024Panel upgradeReplacing exterior underground panel78745not stated
Jul 29, 2024Panel upgradeReplacement of overhead 100 amp main electrical service to main disconnect panel78749not stated
Oct 23, 2023Panel upgradeNo details on the permit78653not stated
Oct 22, 2023Panel upgradeMain panel upgrade underground service78735not stated
Sep 12, 2023Panel upgradeInstalling 125amp Exterior main panel 125 current main is inside the utility78748not stated
Sep 12, 2023EV chargerEV charger station installation78748not stated
Jun 13, 2023SolarUnderground service upgrade to a 200amp with main disconnect78745not stated
Apr 25, 2023Panel upgradeOverhead Service upgrade from 125amps to 200amps with main breaker disconnect78702not stated
Mar 21, 2023Panel upgradeUpgrading an 125 amp main load center to a 200 amp service with a main disconnect78748not stated

What to ask before you hire

About Power-up Electrical

  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any panel upgrade electrician

  • Can you show me proof of liability insurance and your bond?
  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Power-up Electrical

Five quick questions. We pass your request to Power-up Electrical.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Power-up Electrical. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians near 78748 and 78745

See all 327 panel upgrade electricians in Austin, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.