contractors.fyi
Sign in

Electric Connection Services

Panel upgrade electrician working in Austin.

  • License active

27 jobs on Austin permits, 2021 to 2026: 22 panel upgrades, 5 EV charger installations. 58th most panel upgrade permits of 327 contractors in Austin.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?Texas electrical contractor license 34405, valid until Apr 15, 2027We matched it by the phone on their permits.Checks out
Jobs on record27 jobs on Austin permits, 2021 to 2026: 22 panel upgrades, 5 EV charger installations58th most panel upgrade permits of 327 contractors in Austin. That counts jobs, not quality.Our Austin permit records cover September 2021 to September 2026.

Records: City of Austin permits.

Cost and timing

Permit timeline

Across Austin, a panel upgrade permit stays open about 62 days, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. Waiting for the permit adds about 6 days. How long panel upgrade jobs take.

Track record

5 jobs in the last 12 months, about the same as 5 the year before

Q4 2021: 2 jobsQ1 2022: 2 jobsQ2 2022: 2 jobsQ3 2022: 2 jobsQ2 2023: 4 jobsQ1 2024: 2 jobsQ2 2024: 1 jobQ3 2024: 3 jobsQ1 2025: 1 jobQ2 2025: 2 jobsQ3 2025: 1 jobQ4 2025: 1 jobQ1 2026: 1 jobQ2 2026: 3 jobsBusiest: 4 jobsLatest: 3 jobs20222023202420252026
Each bar is 3 months of permits. The tallest is 4 jobs, April to June 2023. Across Austin, all contractors together had 17% more panel upgrade jobs in the last 12 months than in the 12 months before.

Where they work most

  • 787274 jobs
  • 787314 jobs
  • 787443 jobs
  • 787483 jobs
  • 787492 jobs

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
May 4, 2026Panel upgradeRun conduit approximately 40ft on left side of house from main panel to garage for nema 14-50r…78727not stated
May 4, 2026EV chargerRun conduit approximately 40ft on left side of house from main panel to garage for nema 14-50r…78727not stated
May 1, 2026Panel upgradeInterior Remodel Remove wall paneling in master bedroom add R-15 insulation in exterior walls…78749not stated
Jan 5, 2026Panel upgradeRebuild electrical service replace meter and panel78731not stated
Oct 2, 2025Panel upgradeUpgrade electrical service to a 200a replace meter and electrical panel. Replace existing wiring…78744not stated
Aug 6, 2025Panel upgradeReplace Interior panel78727not stated
May 23, 2025Panel upgradeReplace failing electric meter enclosure - service upgrade - Replacing electrical panel and meter*78727not stated
Apr 30, 2025Panel upgradeExpress: Replace siding replace drywall replace existing bathroom fixtures replace shower surround…78751not stated
Jan 13, 2025Panel upgradeEmergency electrical meter and main panel replacement78744not stated
Sep 27, 2024Panel upgradeUpgrade electrical service replace meter can and main panel78759not stated
Aug 14, 2024Panel upgradeInstalled new car charger in garage78731not stated
Aug 14, 2024EV chargerInstalled new car charger in garage78731not stated
Apr 4, 2024Panel upgrade78744not stated
Mar 22, 2024EV chargerEV Charger install78617not stated
Mar 6, 2024Panel upgrade78723not stated
Jun 22, 2023Panel upgrade78704not stated
Jun 5, 2023Panel upgradeInstall hardwired EV charger in garage78748not stated
Jun 5, 2023EV chargerInstall hardwired EV charger in garage78748not stated
Apr 30, 2023Panel upgrade78731not stated
Sep 2, 2022Panel upgradeUpgrade electrical service and run new line for car charger to garage from exterior panel78758not stated
Sep 2, 2022EV chargerUpgrade electrical service and run new line for car charger to garage from exterior panel78758not stated
May 6, 2022Panel upgrade78722not stated
May 6, 2022Panel upgrade78759not stated
Mar 4, 2022Panel upgrade78745not stated
Feb 28, 2022Panel upgradeEmergency panel replacement78749not stated
Dec 14, 2021Panel upgrade78728not stated
Nov 11, 2021Panel upgrade78748not stated

What to ask before you hire

About Electric Connection Services

  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any panel upgrade electrician

  • Can you show me proof of liability insurance and your bond?
  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Electric Connection Services

Five quick questions. We pass your request to Electric Connection Services.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Electric Connection Services. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians near 78727 and 78731

See all 327 panel upgrade electricians in Austin, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.