contractors.fyi
Sign in

R.b. Electric LLC

Panel upgrade electrician working in Austin.

  • License active

23 jobs on Austin permits, 2021 to 2026: 21 panel upgrades, 1 solar installation, 1 EV charger installation. 65th most panel upgrade permits of 327 contractors in Austin.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?Texas electrical contractor license 27532, valid until Sep 5, 2027We matched it by the phone on their permits.Checks out
Jobs on record23 jobs on Austin permits, 2021 to 2026: 21 panel upgrades, 1 solar installation, 1 EV charger installation65th most panel upgrade permits of 327 contractors in Austin. That counts jobs, not quality.Our Austin permit records cover September 2021 to September 2026.

Records: City of Austin permits.

Cost and timing

Permit timeline

Across Austin, a panel upgrade permit stays open about 62 days, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. Waiting for the permit adds about 6 days. How long panel upgrade jobs take.

Track record

6 jobs in the last 12 months, up from 1 the year before

Q4 2021: 4 jobsQ4 2022: 2 jobsQ1 2023: 2 jobsQ4 2023: 3 jobsQ1 2024: 3 jobsQ2 2024: 2 jobsQ1 2025: 1 jobQ1 2026: 2 jobsQ2 2026: 2 jobsQ3 2026: 2 jobsBusiest: 4 jobsLatest: 2 jobs20222023202420252026
Each bar is 3 months of permits. The tallest is 4 jobs, October to December 2021. Across Austin, all contractors together had 17% more panel upgrade jobs in the last 12 months than in the 12 months before.

Where they work most

  • 787225 jobs
  • 787572 jobs
  • 787452 jobs
  • 787291 job
  • 787491 job

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Jul 22, 2026Panel upgrade78729not stated
Jul 10, 2026Panel upgradeResidential Electric service upgrade78749not stated
Jun 22, 2026Panel upgrade78653not stated
Jun 5, 2026Panel upgrade78759not stated
Feb 23, 2026Panel upgradeReplacing existing 15 A 120 V outlets with new temp proof outlets throw out house and replace 20 AM…78757not stated
Jan 29, 2026Panel upgradeExpress- Replace siding like for like replace drywall update fixtures update electrical box/panel…78701not stated
Jan 13, 2025Panel upgradeRequest to Disconnect Addition Interior remodel and small garage conversion into laundry room78731not stated
May 28, 2024SolarRelocate existing 120/240 V 1ph service to new service rack due to a new solar panel instalation78705not stated
May 17, 2024Panel upgradeUpgrade existing 125 A 120/240 V 1ph under ground service to a 200 A 120/240 V 1ph service78727not stated
Feb 28, 2024Panel upgradeService upgrade new 200 AMP overhead service78753not stated
Feb 26, 2024Panel upgradeService upgrade for SFR78745not stated
Feb 7, 2024Panel upgradeReplacing existing 125 A panel with new 125A 120/240V with main breaker78748not stated
Dec 8, 2023Panel upgrade78757not stated
Nov 21, 2023Panel upgradeInstall a 120/240 V 50 amp outlet for a new car charger unit from existing exterior panel at…78722not stated
Nov 21, 2023EV chargerInstall a 120/240 V 50 amp outlet for a new car charger unit from existing exterior panel at…78722not stated
Mar 21, 2023Panel upgradeNew service upgrade 300 amp 120/240 Volt over head service78746not stated
Feb 21, 2023Panel upgradeElectrical main service upgrade new meter and main panel78722not stated
Nov 2, 2022Panel upgradeService upgrade new 200 amp 120/240 v service overhead78704not stated
Oct 31, 2022Panel upgradeElectrical service upgrade main new 200 amp 120/240 V over head service and replacing existing sub…78722not stated
Nov 16, 2021Panel upgradeElectrical up grade removing old 125 amp service and replace it with a new up to code 150 amp…78752not stated
Oct 25, 2021Panel upgradeExpress: Replace drywall replace paneling replace interior and exterior doors replace flooring…78722not stated
Oct 21, 2021Panel upgradeRun 60 Amp 120/240 GFI circuit for jacuzzy power coming out of main out side panel78728not stated
Oct 11, 2021Panel upgradeReplace old Federal Pacific Panel with a new 125 amp main circuit out side panel and new sub panel…78745not stated

What to ask before you hire

About R.b. Electric LLC

  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any panel upgrade electrician

  • Can you show me proof of liability insurance and your bond?
  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from R.b. Electric LLC

Five quick questions. We pass your request to R.b. Electric LLC.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to R.b. Electric LLC. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians near 78722 and 78757

See all 327 panel upgrade electricians in Austin, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.