contractors.fyi
Sign in

Willie Rivera Elec

Panel upgrade electrician working in Austin.

  • License active

22 panel upgrade jobs on Austin permits, 2021 to 2026. 61st most panel upgrade permits of 327 contractors in Austin.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?Texas electrical contractor license 23851, valid until Aug 14, 2027We matched it by the phone on their permits.Checks out
Jobs on record22 panel upgrade jobs on Austin permits, 2021 to 2026Every permit we have for them is panel upgrade.61st most panel upgrade permits of 327 contractors in Austin. That counts jobs, not quality.Our Austin permit records cover September 2021 to September 2026.

Records: City of Austin permits.

Cost and timing

Permit timeline

Across Austin, a panel upgrade permit stays open about 62 days, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. Waiting for the permit adds about 6 days. How long panel upgrade jobs take.

Track record

2 jobs in the last 12 months, down from 5 the year before

Q4 2021: 2 jobsQ1 2022: 3 jobsQ1 2023: 3 jobsQ2 2023: 1 jobQ3 2023: 2 jobsQ2 2024: 1 jobQ3 2024: 3 jobsQ1 2025: 1 jobQ2 2025: 1 jobQ3 2025: 3 jobsQ4 2025: 1 jobQ1 2026: 1 jobBusiest: 3 jobsBusiest: 3 jobs20222023202420252026
Each bar is 3 months of permits. The tallest is 3 jobs, January to March 2022. Across Austin, all contractors together had 17% more panel upgrade jobs in the last 12 months than in the 12 months before.

Where they work most

  • 787464 jobs
  • 787233 jobs
  • 787312 jobs
  • 787532 jobs
  • 787032 jobs

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Jan 7, 2026Panel upgradeExpress- Replace sheetrock new insulation new electrical (electrical wiring and panel) paint…78705not stated
Nov 7, 2025Panel upgradeRelocate existing 200 amp service on a metal rack for Generac install78731not stated
Sep 15, 2025Panel upgradeRebuild existing electrical service 150 amp panel78724not stated
Jul 10, 2025Panel upgradeReplace existing electrical service with a 200 amp meter can and electrical panel78752not stated
Jul 1, 2025Panel upgradeReplace existing electrical service with a 200 amp service78723not stated
May 1, 2025Panel upgrade, 450 sq ftExpress: Replace 450sqft of siding and 200sqft of trim (paint to match) remove 1200sqft of damaged…78702not stated
Jan 9, 2025Panel upgradeConvert existing underground 200 amp service to a 350amp overhead service on a metal rack78746not stated
Sep 17, 2024Panel upgrade, 10334 sq ftETJ-New SFR (AE Service) 10334 Sq78746not stated
Aug 30, 2024Panel upgradeReplace electrical service Riser (worn out SEU cable) install new meter can and electrical panel78753not stated
Aug 1, 2024Panel upgradeRepair :disconnect and reconnect power to residence78746not stated
May 6, 2024Panel upgradeAddition/ remodel of existing SFR. new addition of kitchen living and bath78756not stated
Sep 22, 2023Panel upgradeUpgrade existing electrical service to a 320 amp service78730not stated
Jul 10, 2023Panel upgradeReplace existing electrical panel only78726not stated
May 1, 2023Panel upgradeRepair Main Electrical Panel on Unit A No Meter can required78744not stated
Mar 14, 2023Panel upgradeExpress: replace sheetrock replace all electrical wiring and service panels replace insulation…78723not stated
Mar 1, 2023Panel upgrade2023 Winter Weather Event replace electrical panel and meter can due to tree limb damage from 2023…78753not stated
Jan 4, 2023Panel upgradeRelocate existing 200 amp service to achieve clearance compliance78703not stated
Mar 16, 2022Panel upgradeUpgrade existing electrical panel from 125 amps to 200 amps with new meter can78723not stated
Mar 3, 2022Panel upgradeUpgrade existing electrical panel to a 200 amp permanent meter loop rack to left rear of property78703not stated
Feb 14, 2022Panel upgradeInterior remodel of master bedroom and master bath78731not stated
Dec 7, 2021Panel upgradeInstall 200 amp electrical panel with meter can permanent meter loop overhead78746not stated
Oct 7, 2021Panel upgradeReplace existing 125amp electrical panel and meter can78758not stated

What to ask before you hire

About Willie Rivera Elec

  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any panel upgrade electrician

  • Can you show me proof of liability insurance and your bond?
  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Willie Rivera Elec

Five quick questions. We pass your request to Willie Rivera Elec.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Willie Rivera Elec. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians near 78746 and 78723

See all 327 panel upgrade electricians in Austin, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.