contractors.fyi
Sign in

Harbison Electric LLC

Panel upgrade electrician working in Austin.

  • License active

25 jobs on Austin permits, 2022 to 2026: 23 panel upgrades, 1 EV charger installation, 1 solar installation. 56th most panel upgrade permits of 327 contractors in Austin.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?Texas electrical contractor license 36532, valid until Oct 21, 2027We matched it by the phone on their permits.Checks out
Jobs on record25 jobs on Austin permits, 2022 to 2026: 23 panel upgrades, 1 EV charger installation, 1 solar installation56th most panel upgrade permits of 327 contractors in Austin. That counts jobs, not quality.Our Austin permit records cover September 2021 to September 2026.

Records: City of Austin permits.

Cost and timing

Permit timeline

Across Austin, a panel upgrade permit stays open about 62 days, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. Waiting for the permit adds about 6 days. How long panel upgrade jobs take.

Track record

8 jobs in the last 12 months, up from 7 the year before

Q1 2022: 3 jobsQ2 2022: 2 jobsQ4 2022: 3 jobsQ1 2024: 1 jobQ2 2024: 1 jobQ4 2024: 1 jobQ1 2025: 1 jobQ2 2025: 3 jobsQ3 2025: 2 jobsQ4 2025: 1 jobQ1 2026: 4 jobsQ2 2026: 1 jobQ3 2026: 2 jobsBusiest: 4 jobs20222023202420252026
Each bar is 3 months of permits. The tallest is 4 jobs, January to March 2026. Across Austin, all contractors together had 17% more panel upgrade jobs in the last 12 months than in the 12 months before.

Where they work most

  • 787294 jobs
  • 787504 jobs
  • 787452 jobs
  • 787232 jobs
  • 787272 jobs

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

A row marked ×2 or more stands for that many similar jobs on one day in one ZIP code.

DateWorkZIPOn the permit form
Sep 9, 2026Panel upgradeReplace the existing 200amp outdoor electrical service with new 320amp meter can reconfigure…78730not stated
Aug 19, 2026Panel upgradeReplace existing 200amp outdoor main service and panel with new 200amp main service and panel78729not stated
Apr 23, 2026Panel upgradeRemove 200amp main panel and replace with new 200amp main panel new meter can new riser78729not stated
Mar 18, 2026Panel upgradeReplace 100 amp panels for Unit 1 and Unit 2 with new 100amp panels78745not stated
Mar 17, 2026Panel upgradeReplace 100 amp panels for Unit 1 and Unit 2 with new 100amp panels78745not stated
Mar 16, 2026EV chargerInstalling an ev charger78729not stated
Jan 8, 2026Panel upgradeEmergency repairs due to meter can burning78729not stated
Nov 21, 2025Panel upgradeNo details on the permit78750not stated
Sep 20, 2025Panel upgradeRequest to disconnect/reconnect replacing 200amp panel with a new 200amp panel keeping existing…78735not stated
Aug 19, 2025Panel upgradeExpress: Remove and replace siding (like for like). Remove and replace composition shingle like for…78723not stated
May 27, 2025Panel upgradeUpgrade panel to 200amps78727not stated
May 1, 2025Panel upgradeNo details on the permit78750not stated
May 1, 2025Panel upgradeUpgrade panel to 200amps78759not stated
Feb 25, 2025SolarThe siding was replaced on a building78749not stated
Dec 3, 2024Panel upgradeTwo panel meter cans and overhead service upgrades78759not stated
Apr 2, 2024Panel upgradeReplace Main Electrical panel78750not stated
Feb 16, 2024Panel upgradeReplace burnt out panel and upgrade meter size to 320 amps78733not stated
Nov 28, 2022Panel upgrade (×2, same day)Replace 125 amp service with new 125 amp up to code service78758not stated
Oct 31, 2022Panel upgradeUpgrade from 125 to 200 amp service for future vehicle charger78746not stated
Jun 23, 2022Panel upgradeReplace 125 amp service for Unit A and for Unit B with new up to code 125 amp service78724not stated
May 12, 2022Panel upgradeUpgrading exterior service to 200A New meter base ground rods panel surge78723not stated
Mar 11, 2022Panel upgradeReplace 225 amp service with same but new and up to code78746not stated
Mar 4, 2022Panel upgradeReplace 125 Amp Service with new 125 amp service same up to code78727not stated
Feb 1, 2022Panel upgradeReplace 125 amp service with same but new and up to code78750not stated

What to ask before you hire

About Harbison Electric LLC

  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any panel upgrade electrician

  • Can you show me proof of liability insurance and your bond?
  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Harbison Electric LLC

Five quick questions. We pass your request to Harbison Electric LLC.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Harbison Electric LLC. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians near 78729 and 78750

See all 327 panel upgrade electricians in Austin, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.