contractors.fyi
Sign in

Tomei Electric

Panel upgrade electrician working in Austin.

  • License active

26 jobs on Austin permits, 2022 to 2026: 25 panel upgrades, 1 EV charger installation. 51st most panel upgrade permits of 327 contractors in Austin.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?Texas electrical contractor license 33216, valid until Dec 17, 2026We matched it by the phone on their permits.Checks out
Jobs on record26 jobs on Austin permits, 2022 to 2026: 25 panel upgrades, 1 EV charger installation51st most panel upgrade permits of 327 contractors in Austin. That counts jobs, not quality.Our Austin permit records cover September 2021 to September 2026.

Records: City of Austin permits.

Cost and timing

Permit timeline

Across Austin, a panel upgrade permit stays open about 62 days, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. Waiting for the permit adds about 6 days. How long panel upgrade jobs take.

Track record

6 jobs in the last 12 months, down from 7 the year before

Q2 2022: 1 jobQ1 2023: 8 jobsQ3 2023: 1 jobQ1 2024: 1 jobQ2 2024: 2 jobsQ4 2024: 2 jobsQ1 2025: 2 jobsQ3 2025: 4 jobsQ4 2025: 2 jobsQ3 2026: 3 jobsBusiest: 8 jobsLatest: 3 jobs2023202420252026
Each bar is 3 months of permits. The tallest is 8 jobs, January to March 2023. Across Austin, all contractors together had 17% more panel upgrade jobs in the last 12 months than in the 12 months before.

Where they work most

  • 7874914 jobs
  • 787453 jobs
  • 787353 jobs
  • 787482 jobs
  • 787021 job

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

A row marked ×2 or more stands for that many similar jobs on one day in one ZIP code.

DateWorkZIPOn the permit form
Sep 23, 2026Panel upgradeRebuild of an overhead residential service whose SE cable and point of attachment have been damaged78749not stated
Sep 1, 2026Panel upgradeInstall two new circuits from the outdoor main panel to the garage area78749not stated
Jul 15, 2026Panel upgradeThis home has degraded SE cable an FPE main panel and an antiquated Square D subpanel78702not stated
Oct 28, 2025Panel upgradeRemove the existing 125A MLO main service panel and 150A meter socket78749not stated
Oct 21, 2025EV chargerThis residential unit was built in 2024 with an included electric vehicle charger circuit but no…78745not stated
Sep 25, 2025Panel upgradeInstall a feeder a sub panel device wiring device final lights and a mini split AC power to a small…78749not stated
Sep 20, 2025Panel upgradeReplace a 100-amp MLO which has no spare space with a new 200-amp MCB panel including a new 200-amp…78749not stated
Sep 18, 2025Panel upgradeProvide a 20-amp 240-volt circuit from the main outdoor panel to a new mini split AC condensing…78731not stated
Jul 1, 2025Panel upgradeRemove the existing meter socket and both main outdoor panels78746not stated
Mar 11, 2025Panel upgradeRemove existing overhead meter point of attachment and main outdoor panel then replace them with…78749not stated
Mar 11, 2025Panel upgradeRemove the existing underground meter socket and main outdoor electrical panel and replace them…78735not stated
Nov 20, 2024Panel upgradeRemove the existing SE cable point of attachment and weatherhead78735not stated
Oct 11, 2024Panel upgradeReplace a Zensco outdoor main panel and the associated underground meter socket with new 200A…78745not stated
Jun 25, 2024Panel upgradeUpgrade and build new service 200amp main breaker disconnect panel new AE Meter all grounding per…78748not stated
Jun 15, 2024Panel upgradeRebuild existing overhead electrical service that had been damaged in last years ice storm78749not stated
Feb 17, 2024Panel upgradeAn older Main Lug Only panel at this residence was damaged by lightning surge and needs to be…78745not stated
Jul 24, 2023Panel upgradeRemove an older GE MLO main panel and 150 amp meter socket and replace them with a new 200 amp…78749not stated
Mar 31, 2023Panel upgrade2023 winter weather event *Winter Storm Mara Event* Falling trees pulled the service entrance…78749not stated
Mar 31, 2023Panel upgrade (×2, same day)2023 Winter Weather Event Falling trees pulled the service entrance cable from the house damaging…78749not stated
Mar 31, 2023Panel upgrade2023 Winter Weather Event Falling trees pulled the service entrance cable from the house damaging…78749not stated
Mar 13, 2023Panel upgrade2023 Winter Weather Event The point of attachment and service entrance cable were torn from the…78703not stated
Mar 10, 2023Panel upgrade2023 Winter Weather Event Service entrance and meter were torn from the home and the main panel…78749not stated
Mar 10, 2023Panel upgrade2023 Winter Weather Event The point of attachment and service entrance conduit were torn from the…78748not stated
Jan 18, 2023Panel upgradeRemove the existing 150 amp overhead feed meter socket and main Zensco exterior electrical panel78749not stated
May 23, 2022Panel upgradeRemove the existing 200 amp Zinsco main exterior panel and replace it with a new 200 amp GE panel78735not stated

What to ask before you hire

About Tomei Electric

  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any panel upgrade electrician

  • Can you show me proof of liability insurance and your bond?
  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Tomei Electric

Five quick questions. We pass your request to Tomei Electric.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Tomei Electric. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians near 78749 and 78745

See all 327 panel upgrade electricians in Austin, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.