contractors.fyi
Sign in

Beltran Electric

Panel upgrade electrician working in Austin.

  • Texas electrical contractor license 33000, expired Sep 30, 2026

24 jobs on Austin permits, 2021 to 2026: 22 panel upgrades, 2 solar installations. 57th most panel upgrade permits of 327 contractors in Austin.

The state showed this license as "expired" on Oct 4, 2026. Do not hire until that is cleared.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?Texas electrical contractor license 33000, expired Sep 30, 2026We matched it by the phone on their permits.Problem
Jobs on record24 jobs on Austin permits, 2021 to 2026: 22 panel upgrades, 2 solar installations57th most panel upgrade permits of 327 contractors in Austin. That counts jobs, not quality.Our Austin permit records cover September 2021 to September 2026.

Records: City of Austin permits.

Cost and timing

Permit timeline

Across Austin, a panel upgrade permit stays open about 62 days, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. Waiting for the permit adds about 6 days. How long panel upgrade jobs take.

Track record

10 jobs in the last 12 months, up from 4 the year before

Q4 2021: 1 jobQ2 2022: 1 jobQ4 2022: 1 jobQ2 2023: 2 jobsQ4 2023: 1 jobQ3 2024: 4 jobsQ1 2025: 1 jobQ2 2025: 1 jobQ3 2025: 2 jobsQ4 2025: 3 jobsQ1 2026: 1 jobQ2 2026: 5 jobsQ3 2026: 1 jobBusiest: 5 jobs20222023202420252026
Each bar is 3 months of permits. The tallest is 5 jobs, April to June 2026. Across Austin, all contractors together had 17% more panel upgrade jobs in the last 12 months than in the 12 months before.

Where they work most

  • 787454 jobs
  • 787463 jobs
  • 787583 jobs
  • 787572 jobs
  • 787211 job

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Aug 11, 2026Panel upgradeNo details on the permit78721not stated
Jun 1, 2026Panel upgradeRequesting Permit to do a Panel Upgrade from150 to 200 amps will install a new meter can and new…78745not stated
May 7, 2026Panel upgradeWe are upgrading the electrical panel from 150A to 200 amps we will repace the meter can and…78730not stated
Apr 21, 2026Panel upgradeRebiuld the electrical service Intall a new meter can and a new main panel78749not stated
Apr 11, 2026Panel upgradeRebuilt the electrical service replacement of the meter can and the main panel for units 1 and 2…78757not stated
Apr 9, 2026Panel upgradeRebuilt Electrical Service replacement of the meter can and the Main Panel78753not stated
Feb 12, 2026Panel upgradeWe are replacing main panel and meter can78746not stated
Dec 15, 2025SolarNo details on the permit78757not stated
Dec 8, 2025Solar, 16 kWInstall one (1) EG4 FlexBOSS 21 Hybrid Inverter (240 V 16 kW AC output) and three (3) EG4 PowerPro…78756not stated
Nov 10, 2025Panel upgradePamel Upgrade will be replacing meter can and main panel78745not stated
Sep 2, 2025Panel upgradeReplace the main panel and replace the meter can 200 amps78745not stated
Aug 5, 2025Panel upgradePanel and Meter can upgrade 200 AMPs78758not stated
Apr 22, 2025Panel upgradeNo details on the permit78748not stated
Feb 24, 2025Panel upgradeReplace meter can and Main Panel78758not stated
Aug 14, 2024Panel upgradePanel Upgrade from 200 amp to 320 amps **Install a 100Amp sub panel and 2 Tesla Chargers78703not stated
Aug 14, 2024Panel upgradeUpgrade panel service Bldg A78746not stated
Aug 14, 2024Panel upgradePanel upgrade for BLG B78746not stated
Jul 8, 2024Panel upgradeReplce meter and panel with new78759not stated
Dec 12, 2023Panel upgradePanel upgrade: remove old service and install a new 200-amp service78745not stated
Jun 21, 2023Panel upgradeInstall a new sub panel and main panel upgrade78723not stated
Apr 13, 2023Panel upgradeAddition and Remodel Replaced Main Panel with the equivalent Replaced Sub panel next to main Panel…78731not stated
Dec 14, 2022Panel upgradePanel upgrade78727not stated
May 24, 2022Panel upgradeInterior remodel updating kitchen bathroom and replacing windows and doors - add new sub panel &…78750not stated
Nov 10, 2021Panel upgradeWe be replacing the dated 200amp panel with new outdoor 200amp panel78758not stated

What to ask before you hire

About Beltran Electric

  • Do not hire until the state shows the license as active.
  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any panel upgrade electrician

  • Can you show me proof of liability insurance and your bond?
  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Beltran Electric

Five quick questions. We pass your request to Beltran Electric.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Beltran Electric. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians near 78745 and 78746

See all 327 panel upgrade electricians in Austin, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.