Washburn Electric,llc
Panel upgrade electrician working in Austin.
- License active
22 jobs on Austin permits, 2021 to 2026: 19 panel upgrades, 3 EV charger installations. 72nd most panel upgrade permits of 327 contractors in Austin.
What the public records show
From the state's license records and the city's permits, one question at a time.
| Question | Records show | Mark |
|---|---|---|
| Licensed? | Texas electrical contractor license 21035, valid until Jan 6, 2027We matched it by the phone on their permits. | Checks out |
| Jobs on record | 22 jobs on Austin permits, 2021 to 2026: 19 panel upgrades, 3 EV charger installations72nd most panel upgrade permits of 327 contractors in Austin. That counts jobs, not quality.Our Austin permit records cover September 2021 to September 2026. |
Records: City of Austin permits.
Cost and timing
Permit timeline
Across Austin, a panel upgrade permit stays open about 62 days, from permit to final inspection
This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. Waiting for the permit adds about 6 days. How long panel upgrade jobs take.
Track record
5 jobs in the last 12 months, up from 2 the year before
Where they work most
- 787464 jobs
- 787314 jobs
- 787043 jobs
- 787592 jobs
- 787301 job
Jobs by kind of work
Latest jobs
Permit values are what the contractor wrote on the permit form, not what the owner paid.
| Date | Work | ZIP | On the permit form |
|---|---|---|---|
| Sep 15, 2026 | EV chargerInstall electric vehicle charger | 78730 | not stated |
| Apr 22, 2026 | Panel upgradeReplace electrical panel and meter service is ug | 78759 | not stated |
| Jan 23, 2026 | Panel upgradeREQUEST DISCONNECT Install 400A Transocket meter feeding a 400A automatic transfer switch which… | 78746 | not stated |
| Nov 7, 2025 | Panel upgradeReplace existing meter base and panel | 78744 | not stated |
| Oct 8, 2025 | Panel upgradeREQUEST TO DISCONNECT Relocate meter and panel five feet towards the rear on the left side of the… | 78759 | not stated |
| Jun 24, 2025 | Panel upgradeRequest to disconnect install new mast and new 200a meter base and exterior panel with 200a main… | 78757 | not stated |
| Dec 16, 2024 | Panel upgradeInterior remodel - demo existing laundry closet | 78703 | not stated |
| Aug 14, 2024 | Panel upgradeREQUEST TO DISCONNECT Replace exterior electrical panel | 78727 | not stated |
| May 16, 2024 | Panel upgradeUpgrade electrical service to 350 amps add 2nd 150a exterior panel | 78704 | not stated |
| Feb 16, 2024 | Panel upgrade*REQUEST TO DISCONNECT* Upgrade existing 200A meter to 320A. Add additional 200A panel with main… | 78705 | not stated |
| Dec 12, 2023 | Panel upgradeREQUEST TO DISCONNECT We are replacing the existing meter base and installing a new exterior panel… | 78704 | not stated |
| Aug 9, 2023 | Panel upgradeREQUEST TO DISCONNECT Install exterior panel with main breaker to match existing 200A meter base | 78749 | not stated |
| Jul 30, 2023 | Panel upgrade*request to disconnect* we are replacing exterior panel only.the existing panel & meter base are… | 78734 | not stated |
| Jul 21, 2023 | Panel upgradeUpgrade electrical meter base to 320A add panel with disconnect | 78746 | not stated |
| Feb 7, 2023 | Panel upgrade*Request to Disconnect* Replacing existing 200 Amp panel with new 200 Amp panel with a main circuit… | 78746 | not stated |
| Nov 17, 2022 | EV chargerInterior remodel & garage conversion . convert 20 sf of garage to conditioned space Remodel kitchen… | 78731 | not stated |
| Oct 11, 2022 | Panel upgradeInterior remodel removal of non load bearing wall upgrading plumbing electrical panel changing mech… | 78752 | not stated |
| Oct 6, 2022 | Panel upgradeMeter can required | 78731 | not stated |
| Jul 6, 2022 | Panel upgradeAdding laundry room replacing screen porch with sunroom kitchen remodel master bath remodel. Main… | 78746 | not stated |
| Mar 7, 2022 | Panel upgradeReplace exterior electrical panel | 78731 | not stated |
| Dec 1, 2021 | EV chargerInstall electric vehicle charging station | 78731 | not stated |
| Sep 27, 2021 | Panel upgradeElectrical service upgrade | 78704 | not stated |
What to ask before you hire
About Washburn Electric,llc
- Ask what the warranty covers and for how long, in writing.
- Search their name on the Better Business Bureau site, and read their reviews.
Worth asking any panel upgrade electrician
- Can you show me proof of liability insurance and your bond?
- What size panel, and does the utility need to change the service to my house?
- Who arranges the power shutoff with the utility?
- Who pulls the permit, and who meets the inspector?
Get a quote from Washburn Electric,llc
Five quick questions. We pass your request to Washburn Electric,llc.
Request for Washburn Electric,llc
- Where
- Job
- Start
- Budget
- Goes to
You decide who to hire. Your details go only to the contractors you pick. How we use your details
Sent. We have your request.
We pass it to Washburn Electric,llc. Replies usually come within a few days.
Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.
Open your job roomMore panel upgrade electricians near 78746 and 78731
- Jonestown Electrical Solutions LLC
- Salt Light & Electric
- Service Company of San Antonio LLC Dba Mr Electric of Austin
- Frank's Electric
- At Electrical LLC
- Davis Electric
See all 327 panel upgrade electricians in Austin, ranked by jobs
Run this business? Claim this page to get requests by email and reply to homeowners here.