contractors.fyi
Sign in

At Electrical LLC

Panel upgrade electrician working in Austin.

  • License active

19 panel upgrade jobs on Austin permits, 2022 to 2026. 67th most panel upgrade permits of 327 contractors in Austin.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?Texas electrical contractor license 39893, valid until Jan 29, 2027We matched it by the phone on their permits.Checks out
Jobs on record19 panel upgrade jobs on Austin permits, 2022 to 2026Every permit we have for them is panel upgrade.67th most panel upgrade permits of 327 contractors in Austin. That counts jobs, not quality.Our Austin permit records cover September 2021 to September 2026.

Records: City of Austin permits.

Cost and timing

Permit timeline

Across Austin, a panel upgrade permit stays open about 62 days, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. Waiting for the permit adds about 6 days. How long panel upgrade jobs take.

Track record

8 jobs in the last 12 months, up from 6 the year before

Q3 2022: 1 jobQ3 2023: 2 jobsQ4 2023: 1 jobQ2 2024: 1 jobQ4 2024: 2 jobsQ2 2025: 4 jobsQ4 2025: 1 jobQ1 2026: 1 jobQ2 2026: 6 jobsBusiest: 6 jobs2023202420252026
Each bar is 3 months of permits. The tallest is 6 jobs, April to June 2026. Across Austin, all contractors together had 17% more panel upgrade jobs in the last 12 months than in the 12 months before.

Where they work most

  • 787453 jobs
  • 787442 jobs
  • 787312 jobs
  • 787032 jobs
  • 787531 job

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Jun 1, 2026Panel upgradeExisting electrical sub-panel will be updated new electrical panel and breakers will be installed.(…78753not stated
May 18, 2026Panel upgradeExisting underground service will be upgraded/New grounding system and indoor sub-Panel will be…78744not stated
Apr 28, 2026Panel upgradeExpress - Install new toilet upgrade main electrical panel replace all hot and cold water lines…78721not stated
Apr 27, 2026Panel upgradeAddition of an electrical panel and outlets in the garage78731not stated
Apr 6, 2026Panel upgradeThe existing 200 amp electrical service will be updated with a new panel a new meter and an…78750not stated
Apr 1, 2026Panel upgradeExpress: Replace shower with roll-in shower install new diverter valve and piping replace existing…78745not stated
Mar 19, 2026Panel upgradeExisting electrical overhead service upgrade for main dwelling only78703not stated
Nov 20, 2025Panel upgradeUPDATE: Installation of temporary exterior outlets near the main panel Interior remodel Remodel…78703not stated
May 28, 2025Panel upgradeUpgrade existing underground electrical service and update sub-panel with New breakers78727not stated
May 27, 2025Panel upgrade, 200 sq ft200 Sqft shed with 50 amp sub panel from home/main panel78739not stated
Apr 23, 2025Panel upgradeExpress: Remove and replace roofing of the entire house using 30 year architectural shingles…78731not stated
Apr 8, 2025Panel upgradeUpgrade residential underground electrical service and subpanel78748not stated
Dec 27, 2024Panel upgradeUpdated existing electrical main panel with a new main breaker panel78744not stated
Dec 22, 2024Panel upgradeComplete main panel upgrade78726not stated
Jun 1, 2024Panel upgradeExpress garage access door replace same side side landing and ramp garage landing and ramp tub…78758not stated
Nov 27, 2023Panel upgradeUpgrade existing 100 amp service to 200 amp electrical service78724not stated
Aug 29, 2023Panel upgradeUpgrade existing electrical service with new 200 amp service78723not stated
Aug 29, 2023Panel upgradeUpgrade an old existing electrical service for a new 200 amp service78745not stated
Sep 22, 2022Panel upgradeReplace outside elec panel/subpanel and Pigtail aluminum wiring with copper rewire house78745not stated

What to ask before you hire

About At Electrical LLC

  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any panel upgrade electrician

  • Can you show me proof of liability insurance and your bond?
  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from At Electrical LLC

Five quick questions. We pass your request to At Electrical LLC.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to At Electrical LLC. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians near 78745 and 78744

See all 327 panel upgrade electricians in Austin, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.