contractors.fyi
Sign in

Denucci Electric

Panel upgrade electrician working in Austin.

  • License active

33 jobs on Austin permits, 2022 to 2026: 21 panel upgrades, 12 EV charger installations. 62nd most panel upgrade permits of 327 contractors in Austin.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?Texas electrical contractor license 35467, valid until Sep 25, 2027We matched it by the phone on their permits.Checks out
Jobs on record33 jobs on Austin permits, 2022 to 2026: 21 panel upgrades, 12 EV charger installations62nd most panel upgrade permits of 327 contractors in Austin. That counts jobs, not quality.Our Austin permit records cover September 2021 to September 2026.

Records: City of Austin permits.

Cost and timing

Permit timeline

Across Austin, a panel upgrade permit stays open about 62 days, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. Waiting for the permit adds about 6 days. How long panel upgrade jobs take.

Track record

8 jobs in the last 12 months, about the same as 8 the year before

Q4 2022: 2 jobsQ1 2023: 2 jobsQ2 2023: 3 jobsQ3 2023: 6 jobsQ4 2023: 1 jobQ1 2024: 1 jobQ3 2024: 2 jobsQ4 2024: 2 jobsQ1 2025: 2 jobsQ2 2025: 1 jobQ3 2025: 3 jobsQ4 2025: 3 jobsQ2 2026: 4 jobsQ3 2026: 1 jobBusiest: 6 jobsLatest: 1 job2023202420252026
Each bar is 3 months of permits. The tallest is 6 jobs, July to September 2023. Across Austin, all contractors together had 17% more panel upgrade jobs in the last 12 months than in the 12 months before.

Where they work most

  • 787595 jobs
  • 787453 jobs
  • 787493 jobs
  • 787313 jobs
  • 787233 jobs

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Sep 14, 2026Panel upgradeUpgrade the existing Underground service to a new 200amp Service existing location78759not stated
May 12, 2026Panel upgradeUpgrade main electrical panel and meter78757not stated
Apr 23, 2026Panel upgradeUpgrade underground service to a 200amp service and install 50amp car charger in garage78745not stated
Apr 23, 2026EV chargerUpgrade underground service to a 200amp service and install 50amp car charger in garage78745not stated
Apr 2, 2026EV chargerInstallation of 80amp car charger 4/7/26 SM - REVISED ** Requires a 100 amp overcurrent protection…78756not stated
Dec 16, 2025Panel upgradeUpgrade underground electrical service to a 200amp service and installation of new oven circuit78729not stated
Nov 3, 2025Panel upgradeUpgrade main electrical service78749not stated
Nov 3, 2025EV chargerUpgrade main electrical service78749not stated
Sep 5, 2025Panel upgradeUpgrade main service to 200amps install new sub panel and 3 dedicated circuits from new sub panel…78753not stated
Sep 5, 2025EV chargerUpgrade main service to 200amps install new sub panel and 3 dedicated circuits from new sub panel…78753not stated
Sep 3, 2025Panel upgradeAluminum pigtailing remediation 2 prong to 3 prong outlets replacement sub panel replacement and…78731not stated
Jun 23, 2025EV chargerAluminum remediation/pigtailing ev charger install and minor interior electrical78759not stated
Jan 15, 2025Panel upgrade**Upgrading main electrical service installing exterior sub panel installing EV car charger at…78751not stated
Jan 15, 2025EV charger**Upgrading main electrical service installing exterior sub panel installing EV car charger at…78751not stated
Dec 31, 2024Panel upgradeRelocate main panel and meter around the corner on house78757not stated
Dec 16, 2024Panel upgradeUpgrade main underground service and meter and replace sub panel78758not stated
Aug 19, 2024EV chargerInstallation of dedicated circuit for car charger78745not stated
Aug 13, 2024Panel upgradeDue to transformer blowing we replaced burnt breaker and evaluated panel for major damage78723not stated
Feb 2, 2024EV chargerInstall 50amp car charger circuit78749not stated
Oct 16, 2023Panel upgradeReplace main service and panel with 200amp meter and 200amp panel- overhead service78723not stated
Sep 20, 2023Panel upgradeInstall new subpanel in garage and circuit for car charger78731not stated
Sep 20, 2023EV chargerInstall new subpanel in garage and circuit for car charger78731not stated
Aug 7, 2023EV chargerInstall 6awg circuit for 60amp charger78759not stated
Jul 24, 2023Panel upgradeUpgrade main panel and meter to 200amp service78727not stated
Jul 19, 2023Panel upgradeReplace damaged main panel and meter78703not stated
Jul 5, 2023Panel upgradeAluminum pigtailing remediation main service and meter upgrade and sub panel upgrade78759not stated
Jun 17, 2023Panel upgradeUpgrade main service and panel to 200amps78752not stated
May 24, 2023Panel upgradeUpgraded main electrical service and meter with a 200amp service78703not stated
Apr 29, 2023Panel upgradeUpgrade main panel and meter to 200amp and install AFCI/GFCI breakers to properly protect 2 wire…78723not stated
Mar 29, 2023EV chargerInstall car charger power and generator interlock system78759not stated
Mar 22, 2023Panel upgradeUpgrade main service to 200amp service78741not stated
Nov 2, 2022Panel upgradeReplace main service and panel with 200amp meter and panel78748not stated
Oct 21, 2022EV chargerInstall dedicated circuit for car charger 14-50nema plug in garage78704not stated

What to ask before you hire

About Denucci Electric

  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any panel upgrade electrician

  • Can you show me proof of liability insurance and your bond?
  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Denucci Electric

Five quick questions. We pass your request to Denucci Electric.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Denucci Electric. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians near 78759 and 78745

See all 327 panel upgrade electricians in Austin, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.