contractors.fyi
Sign in

Aram Construction Company

ADU builder based in Beverly Hills. Licensed since 2009.

  • License active
  • Workers' comp on file

13 jobs on Los Angeles permits, 2020 to 2026: 5 ADUs, 3 roofing jobs, 3 remodels, 2 panel upgrades. 77th most ADU permits of 271 contractors in Los Angeles.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?License 934479, active in the state's records on Sep 23, 2026General engineering, general buildingNo complaints or citations on the board's public record.Checks out
Workers' comp?Workers' comp policy on file with the stateThis covers their crew if someone is hurt. It is not insurance for your home.On file
In business?Licensed since 2009
Jobs on record13 jobs on Los Angeles permits, 2020 to 2026: 5 ADUs, 3 roofing jobs, 3 remodels, 2 panel upgradesThey are based in Beverly Hills. Work outside Los Angeles is not in these records.77th most ADU permits of 271 licensed contractors in Los Angeles. That counts jobs, not quality.Our Los Angeles permit records cover September 2023 to September 2026.

Records: the state license board and City of Los Angeles permits.

State license board record

No complaints or citations on the board's public record.

Source: California Contractors State License Board, checked Oct 4, 2026. Look up license 934479 on CSLB

Cost and timing

Permit value (not a price)

Their typical permit lists $50,000 (half list more, half less)

That is the figure written on the permit form, which can be far from what you pay. What ADU jobs cost in Los Angeles.

Get 2 or 3 written quotes.

Permit timeline

Across Los Angeles, a ADU permit stays open about about 12 months, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. Waiting for the permit adds about about 4 months. How long ADU jobs take.

Track record

5 jobs in the last 12 months, up from 1 the year before

Q3 2020: 1 jobQ1 2023: 1 jobQ4 2023: 1 jobQ2 2024: 2 jobsQ3 2024: 2 jobsQ2 2025: 1 jobQ1 2026: 3 jobsQ2 2026: 2 jobsBusiest: 3 jobs202120222023202420252026
Each bar is 3 months of permits. The tallest is 3 jobs, January to March 2026. Across Los Angeles, all contractors together had 1% more ADU jobs in the last 12 months than in the 12 months before.

Where they work most

  • 900493 jobs
  • 902101 job
  • 900071 job
  • 900251 job
  • 900341 job

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Jun 2, 2026Reroof, 38 squares (3,800 sq ft)90210$18,500
Apr 28, 2026ADUCONVERT PART OF GARAGE INTO 4 ADUs (3722sf). CONVERT REC. ROOM INTO A90007$280,000
Mar 24, 2026ADUConversion of an (e) recreation room intoan ADU per LAMC12.22A.33(c)90025$20,000
Mar 11, 2026RemodelKitchen/bathroom remodel for residential buildings (no structural changes)90049$40,000
Feb 20, 2026ADUConvert existing recreation room on 1st floor of duplex to ADU per LAM90034$30,000
Apr 18, 2025ADUCONVERSION OF GYM/REC ROOM TO TWO BEDROOM (ADU) 818 sf90026$50,000
Jul 29, 2024RemodelRemodel to the (e)single family dwelling to include (n) entry door, add (n) storage and (n) powder…90077$20,000
Jul 17, 2024Remodel1 Kitchen & 1 Bathroom remodel for residential buildings ( no structural changes ) 2 Window (same…90045$75,000
Jun 28, 2024Reroof, 60 squares (6,000 sq ft)90049$25,000
Jun 12, 2024ADUNew detached 2-story ADU per ordinance 186,481. 1 OF 290063$200,000
Nov 15, 2023Reroof, 60 squares (6,000 sq ft)91406$25,000
Mar 28, 2023Panel upgradeService upgrade to 600 amps 120/240 1p 3w and installing new e90049not stated
Aug 18, 2020Panel upgradeFull plan check90004not stated

What to ask before you hire

About Aram Construction Company

  • Ask what the warranty covers and for how long, in writing.

Worth asking any ADU builder

  • Can you show me proof of liability insurance and your bond?
  • Do you handle the plans, engineering and utility hookups, or do I?
  • How long from permit to the final inspection on your last three ADUs?
  • What is the payment schedule, and what is extra?

Get a quote from Aram Construction Company

Five quick questions. We pass your request to Aram Construction Company.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Aram Construction Company. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More ADU builders near 90049 and 90210

See all 271 ADU builders in Los Angeles, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.