contractors.fyi
Sign in

Truebuilt Construction Inc

ADU builder based in Orange. Licensed since 2019.

  • License active
  • Workers' comp on file

17 jobs on Los Angeles permits, 2023 to 2026: 6 ADUs, 6 remodels, 3 roofing jobs, 2 home additions. 71st most ADU permits of 271 contractors in Los Angeles.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?License 1052087, active in the state's records on Sep 23, 2026General buildingNo complaints or citations on the board's public record.Checks out
Workers' comp?Workers' comp policy on file with the stateThis covers their crew if someone is hurt. It is not insurance for your home.On file
In business?Licensed since 2019
Jobs on record17 jobs on Los Angeles permits, 2023 to 2026: 6 ADUs, 6 remodels, 3 roofing jobs, 2 home additionsThey are based in Orange. Work outside Los Angeles is not in these records.71st most ADU permits of 271 licensed contractors in Los Angeles. That counts jobs, not quality.Our Los Angeles permit records cover September 2023 to September 2026.

Records: the state license board and City of Los Angeles permits.

State license board record

No complaints or citations on the board's public record.

Source: California Contractors State License Board, checked Oct 4, 2026. Look up license 1052087 on CSLB

Cost and timing

Permit value (not a price)

Their typical permit lists $237,090 (half list more, half less)

That is the figure written on the permit form, which can be far from what you pay. What ADU jobs cost in Los Angeles.

Get 2 or 3 written quotes.

Permit timeline

Across Los Angeles, a ADU permit stays open about about 12 months, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. Waiting for the permit adds about about 4 months. How long ADU jobs take.

Track record

Jobs per quarter

Q4 2023: 4 jobsQ1 2024: 3 jobsQ2 2024: 4 jobsQ3 2024: 2 jobsQ4 2024: 1 jobQ3 2025: 1 jobQ1 2026: 1 jobQ2 2026: 1 jobBusiest: 4 jobsLatest: 1 job202420252026
Each bar is 3 months of permits. The tallest is 4 jobs, October to December 2023.

Where they work most

  • 900045 jobs
  • 900164 jobs
  • 900193 jobs
  • 900262 jobs
  • 900342 jobs

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

A row marked ×2 or more stands for that many similar jobs on one day in one ZIP code.

DateWorkZIPOn the permit form
Apr 17, 2026ADUNew ground floor accessory dwelling unit, carport, and patio cover wit90016$190,000
Jan 29, 2026ADU2-story building- 2adus at rear of lot90026$300,000
Aug 16, 2025AdditionProposed 13'x20'10" bathrm & closet addition to existing bedroom at re90019$35,000
Nov 7, 2024ADUConvert 2 recreation rooms to 13'3"x18'0" accessory dwelling unit per90034$20,000
Aug 5, 2024AdditionEnclose ex 1st flr 4-car carport (20'4"x33'8") under ex 2-story duplex90016$60,000
Jul 22, 2024RemodelRemodel (e) sfd per engineering90016$30,000
Jun 24, 2024RemodelProposed 13'x20'10" bathrm & closet addition to existing bedroom at rear90019$35,000
May 10, 2024Reroof, 18 squares (1,800 sq ft)90019$22,227
May 10, 2024Reroof, 17 squares (1,700 sq ft)90016$22,677
Apr 30, 2024ADUNEW 2-STORY ADU PER LAMC 12.22 A.33(c) AND (d)90034$105,000
Mar 1, 2024ADUNew 3 story sfd with attached 2 story adu and attached 1-car garage at90038$340,000
Feb 22, 2024ADUNEW 3-STORY SINGLE FMAILY DWELLING AND ATTACHED 2-STORY ADU per LAMC90026$284,180
Jan 5, 2024RemodelExterior remodel to remove (e) attached patio cover and interior remodel to convert (e) mudroom to…90004$15,000
Nov 14, 2023Reroof, 25 squares (2,500 sq ft)90004$5,000
Nov 14, 2023Remodel (×2, same day)1 bathroom(s).Bathroom remodel for residential buildings (no structural changes)90004$5,000 each
Nov 14, 2023RemodelInterior kitchen remodel/repair (no changes in walls or openings)90004$12,000

What to ask before you hire

About Truebuilt Construction Inc

  • Ask what the warranty covers and for how long, in writing.

Worth asking any ADU builder

  • Can you show me proof of liability insurance and your bond?
  • Do you handle the plans, engineering and utility hookups, or do I?
  • How long from permit to the final inspection on your last three ADUs?
  • What is the payment schedule, and what is extra?

Get a quote from Truebuilt Construction Inc

Five quick questions. We pass your request to Truebuilt Construction Inc.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Truebuilt Construction Inc. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More ADU builders near 90004 and 90016

See all 271 ADU builders in Los Angeles, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.