contractors.fyi
Sign in

Trig Builders Inc

ADU builder based in North Hollywood. Licensed since 2017.

  • License active
  • Workers' comp on file

15 jobs on Los Angeles permits, 2023 to 2026: 7 ADUs, 6 remodels, 1 pool or spa, 1 home addition. 57th most ADU permits of 271 contractors in Los Angeles.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?License 1030887, active in the state's records on Sep 23, 2026General buildingNo complaints or citations on the board's public record.Checks out
Workers' comp?Workers' comp policy on file with the stateThis covers their crew if someone is hurt. It is not insurance for your home.On file
In business?Licensed since 2017
Jobs on record15 jobs on Los Angeles permits, 2023 to 2026: 7 ADUs, 6 remodels, 1 pool or spa, 1 home additionThey are based in North Hollywood. Work outside Los Angeles is not in these records.57th most ADU permits of 271 licensed contractors in Los Angeles. That counts jobs, not quality.Our Los Angeles permit records cover September 2023 to September 2026.

Records: the state license board and City of Los Angeles permits.

State license board record

No complaints or citations on the board's public record.

Source: California Contractors State License Board, checked Oct 4, 2026. Look up license 1030887 on CSLB

Cost and timing

Permit value (not a price)

Their typical permit lists $50,000 (half list more, half less)

That is the figure written on the permit form, which can be far from what you pay. What ADU jobs cost in Los Angeles.

Get 2 or 3 written quotes.

Permit timeline

Across Los Angeles, a ADU permit stays open about about 12 months, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. Waiting for the permit adds about about 4 months. How long ADU jobs take.

Track record

5 jobs in the last 12 months, down from 6 the year before

Q3 2023: 1 jobQ4 2023: 1 jobQ2 2024: 1 jobQ3 2024: 1 jobQ4 2024: 1 jobQ2 2025: 2 jobsQ3 2025: 3 jobsQ1 2026: 3 jobsQ2 2026: 2 jobsBusiest: 3 jobs202420252026
Each bar is 3 months of permits. The tallest is 3 jobs, July to September 2025. Across Los Angeles, all contractors together had 1% more ADU jobs in the last 12 months than in the 12 months before.

Where they work most

  • 916064 jobs
  • 900693 jobs
  • 914363 jobs
  • 914031 job
  • 914231 job

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Apr 28, 2026RemodelInterior remodel to combine existing suites into single executive suite (Suites 202 + 210). Add…91403$308,000
Apr 2, 2026ADUNEW 20' X 25' DETACHED ACCESSORY DWELLING UNIT PER LAMC 12.22 A.33(c)91423$50,000
Mar 24, 2026ADUConvert existing attached garage to ADU per LAMC 12.22 A.33 (c)91606$20,000
Mar 21, 2026Pool or spaNew irregular shaped 25' 11" x 14' 6" pool with spa90069$25,000
Mar 21, 2026AdditionMajor remodel to remove all walls/footings except for 12'-0" linear wa90069$550,000
Aug 18, 2025ADUNEW DETACHED ACCESSORY DWELLING UNIT PER LAMC 12.22 A.33(c) and (d)91606$120,000
Aug 18, 2025ADUCONVERT (E) ATT GARAGE TO JR ACCESSORY DWELLING UNIT PER GCS 65852.2(e91606$50,000
Jul 1, 2025ADUPropose 25'-2"x42' one story accessory dwelling unit with one open par91607$110,292
May 30, 2025RemodelMajor remodel,convert portion of garage to sfd, &21'3"x30'4" 2nd floor addition.(nfpa-13d fire…91436$100,000
May 2, 2025RemodelPool remodel: new spa within (e) pool shell all work per std#268 and eng details91436$10,000
Dec 11, 2024Remodel3 bathroom(s).Bathroom remodel for residential buildings (no structural changes).Kitchen remodel…91436$9,750
Jul 23, 2024Remodel25'-7" x 14'-10" addition and remodel for existing single family dwelling - per engineer91606$60,000
Jun 14, 2024ADUConvert ex detached 20'4"x20'1" garage into accessory dwelling unit pe90049$18,000
Dec 27, 2023ADUCONVERT DET GARAGE TO ADU PER CA Govt91364$30,000
Sep 15, 2023Remodel, 2993 sq ftMajor remodel to remove all walls/footings except for 12'-0" linear wall and build new 2 story…90069$550,000

What to ask before you hire

About Trig Builders Inc

  • Ask what the warranty covers and for how long, in writing.

Worth asking any ADU builder

  • Can you show me proof of liability insurance and your bond?
  • Do you handle the plans, engineering and utility hookups, or do I?
  • How long from permit to the final inspection on your last three ADUs?
  • What is the payment schedule, and what is extra?

Get a quote from Trig Builders Inc

Five quick questions. We pass your request to Trig Builders Inc.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Trig Builders Inc. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More ADU builders near 91606 and 90069

See all 271 ADU builders in Los Angeles, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.