contractors.fyi
Sign in

Sauer Paul Construction

ADU builder working in Los Angeles. Licensed since 2021.

  • License active
  • No workers' comp: the business told the state it has no employees

19 jobs on Los Angeles permits, 2023 to 2025: 11 ADUs, 6 home additions, 1 remodel, 1 seismic retrofit. 28th most ADU permits of 271 contractors in Los Angeles.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?License 1079869, active in the state's records on Sep 23, 2026General buildingNo complaints or citations on the board's public record.Checks out
Workers' comp?No workers' comp: the business told the state it has no employeesThis covers their crew if someone is hurt. It is not insurance for your home.Ask them
In business?Licensed since 2021
Jobs on record19 jobs on Los Angeles permits, 2023 to 2025: 11 ADUs, 6 home additions, 1 remodel, 1 seismic retrofit28th most ADU permits of 271 licensed contractors in Los Angeles. That counts jobs, not quality.Our Los Angeles permit records cover September 2023 to September 2026.

Records: the state license board and City of Los Angeles permits.

State license board record

No complaints or citations on the board's public record.

Source: California Contractors State License Board, checked Oct 4, 2026. Look up license 1079869 on CSLB

Cost and timing

Permit value (not a price)

Their typical permit lists $120,000 (half list more, half less)

That is the figure written on the permit form, which can be far from what you pay. What ADU jobs cost in Los Angeles.

Get 2 or 3 written quotes.

Permit timeline

Across Los Angeles, a ADU permit stays open about about 12 months, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. Waiting for the permit adds about about 4 months. How long ADU jobs take.

Track record

1 job in the last 12 months, down from 8 the year before

Q4 2023: 3 jobsQ1 2024: 2 jobsQ2 2024: 1 jobQ3 2024: 5 jobsQ2 2025: 3 jobsQ3 2025: 4 jobsQ4 2025: 1 jobBusiest: 5 jobsLatest: 1 job20242025
Each bar is 3 months of permits. The tallest is 5 jobs, July to September 2024. Across Los Angeles, all contractors together had 1% more ADU jobs in the last 12 months than in the 12 months before.

Where they work most

  • 916059 jobs
  • 913425 jobs
  • 913523 jobs
  • 914051 job
  • 916061 job

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

A row marked ×2 or more stands for that many similar jobs on one day in one ZIP code.

DateWorkZIPOn the permit form
Oct 30, 2025RemodelREMODEL OF (E) CHURCH W/ RESTRIPE PARKING LOT, ALL WORK PER ENGINEERING "COMPLY WITH DEPARTMENT…91352$75,000
Aug 14, 2025Addition (×2, same day)91605$160,000 each
Aug 14, 2025ADU (×2, same day)91605$160,000 each
Jun 18, 2025AdditionConversion of parking stalls to Two (2) New ADUs (1 parking sta91352$60,000
Jun 18, 2025ADUConversion of parking stalls to Two (2) New ADUs (1 parking sta91352$60,000
Apr 15, 2025AdditionSecond story addition to an (E) detached garage and conversion91605$160,000
Sep 24, 2024ADUConversion of existing garage to 2 new accessory dwelling units91342$350,000
Sep 9, 2024ADUConversion of 8 parking stalls to three attached ADUs per state91342$174,000
Aug 19, 2024ADU, 403 sq ftNEW DETACHED 1-STORY ADU (403 SQFT) PER CA GOVT. CODE 65852.2(e)(1)(D)91605$55,000
Aug 8, 2024AdditionConverted 6 tuck under parking stalls into 3 accessory dwelling unit p91605$115,300
Aug 8, 2024ADUConverted 6 tuck under parking stalls into 3 accessory dwelling unit p91605$115,300
Jun 18, 2024Seismic retrofitSoft-Story seismic retrofit per LABC Chapter 93: Verify work done under ADU Conversion permit…91405not stated
Mar 6, 2024ADU, 696 sq ftCONVERT (E) ATTACHED 4-CAR GARAGE INTO TWO ADUs (696 SQFT) PER CA GOVT91605$60,000
Jan 11, 2024ADUConvert (e) garage with in apartment to new attached adu per multiple91606$120,000
Nov 28, 2023ADUConvert a portion of detached carport into two detached ADUs per91342$116,000
Nov 9, 2023AdditionConversion of 4 existing garages to 2 accessory dwelling units per gcs91342$120,000
Nov 9, 2023ADUConversion of 4 existing garages to 2 accessory dwelling units per gcs91342$120,000

What to ask before you hire

About Sauer Paul Construction

  • Ask who will do the work. Anyone they pay to work on your home must be covered by workers' comp.
  • Ask what the warranty covers and for how long, in writing.

Worth asking any ADU builder

  • Can you show me proof of liability insurance and your bond?
  • Do you handle the plans, engineering and utility hookups, or do I?
  • How long from permit to the final inspection on your last three ADUs?
  • What is the payment schedule, and what is extra?

Get a quote from Sauer Paul Construction

Five quick questions. We pass your request to Sauer Paul Construction.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Sauer Paul Construction. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More ADU builders near 91605 and 91342

See all 271 ADU builders in Los Angeles, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.