contractors.fyi
Sign in

Viridi Construction Inc

ADU builder based in Northridge.

  • License 1043410 was not in the state's records on Sep 23, 2026

23 jobs on Los Angeles permits, 2023 to 2026: 13 ADUs, 10 home additions.

We could not find an active or renewable license for this business in the state's records on Sep 23, 2026. Check the license with the state before you hire.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?License 1043410 was not in the state's records on Sep 23, 2026Problem
Jobs on record23 jobs on Los Angeles permits, 2023 to 2026: 13 ADUs, 10 home additionsThey are based in Northridge. Work outside Los Angeles is not in these records.Our Los Angeles permit records cover September 2023 to September 2026.

Records: the state license board and City of Los Angeles permits.

Cost and timing

Permit value (not a price)

Their typical permit lists $59,000 (half list more, half less)

That is the figure written on the permit form, which can be far from what you pay. What ADU jobs cost in Los Angeles.

Get 2 or 3 written quotes.

Permit timeline

Across Los Angeles, a ADU permit stays open about about 12 months, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. Waiting for the permit adds about about 4 months. How long ADU jobs take.

Track record

3 jobs in the last 12 months, down from 7 the year before

Q4 2023: 1 jobQ1 2024: 6 jobsQ2 2024: 5 jobsQ3 2024: 1 jobQ4 2024: 1 jobQ1 2025: 3 jobsQ2 2025: 3 jobsQ3 2025: 2 jobsQ1 2026: 1 jobBusiest: 6 jobsLatest: 1 job202420252026
Each bar is 3 months of permits. The tallest is 6 jobs, January to March 2024. Across Los Angeles, all contractors together had 1% more ADU jobs in the last 12 months than in the 12 months before.

Where they work most

  • 900623 jobs
  • 900432 jobs
  • 900592 jobs
  • 913252 jobs
  • 902472 jobs

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Jan 10, 2026ADU, 830 sq ftNEW 1-STORY DETACHED IRREGULAR SHAPE (29'-0"x40'-0"), 830 SQFT ADU PER90037$120,000
Sep 23, 2025ADU, 1200 sq ftNEW (40'-0"x30'-0"),1200 SQFT 1 STORY DETACHED ADU PER LAMC 12.22 A.3391411$164,400
Sep 22, 2025AdditionConvert (e) det90002$97,000
Apr 8, 2025ADUConvert detached garage to accessory dwelling unit per lamc 12.22 a.3390047$60,000
Apr 3, 2025AdditionEcpc: convert existing dettached garage and a rumpus room to an adu90043$30,000
Apr 3, 2025ADUEcpc: convert existing dettached garage and a rumpus room to an adu90043$30,000
Jan 26, 2025Addition32'-6" x 16' irreg shaped addition to and convert (e) detached garage90062$75,000
Jan 15, 2025Addition(n) 500 sf adu addition (11515 1/2)to 2-story duplex per lamc 12.22 a90059$40,000
Jan 15, 2025ADU(n) 500 sf adu addition (11515 1/2)to 2-story duplex per lamc 12.22 a90059$40,000
Oct 17, 2024Addition14'-6" x 10'-5" addition to and convert the (e) detached garage into a90061$33,000
Sep 16, 2024Addition15'-10" x 18'-4" addition to and convert the (e) detached garage into91335$55,500
May 8, 2024ADUConvert (E) detached garage in to 1 story detached ADU per GCS 65852.291401$34,000
May 1, 2024ADUNo details on the permit91342$40,000
Apr 18, 2024AdditionConvert the (e) detached garage to an accessory dwelling unit per lamc90062$70,000
Apr 18, 2024ADUConvert the (e) detached garage to an accessory dwelling unit per lamc90062$70,000
Apr 11, 2024ADUNew detached 1-story 31' 11" x 28' 5" accessory dwelling unit per lamc91352$92,000
Mar 20, 2024AdditionAdd accessory dwelling unit over existing garage and new patio cover91325$59,000
Mar 20, 2024ADUAdd accessory dwelling unit over existing garage and new patio cover91325$59,000
Feb 7, 2024AdditionAdd to 3'-8" x 6'-9" and convert garage to new accessory dwelling unit90247$49,500
Feb 7, 2024ADUAdd to 3'-8" x 6'-9" and convert garage to new accessory dwelling unit90247$49,500
Feb 7, 2024ADUConvert (e) 20' x 20' detached garage to a detached accessory dwelling90011$55,000
Feb 5, 2024ADUGarage conversion to adu at the ground level and sfd on 2nd floor90008$60,000
Oct 14, 2023AdditionConvert detached garage with addition ( 18' x 12' ) into accessory dwe90042$45,000

What to ask before you hire

About Viridi Construction Inc

  • Do not hire until the contractor shows you an active license.
  • Ask what the warranty covers and for how long, in writing.

Worth asking any ADU builder

  • Can you show me proof of liability insurance and your bond?
  • Do you handle the plans, engineering and utility hookups, or do I?
  • How long from permit to the final inspection on your last three ADUs?
  • What is the payment schedule, and what is extra?

Get a quote from Viridi Construction Inc

Five quick questions. We pass your request to Viridi Construction Inc.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Viridi Construction Inc. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More ADU builders near 90062 and 90043

See all 271 ADU builders in Los Angeles, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.