contractors.fyi
Sign in

Express Construction Group Inc

ADU builder based in Burbank. Licensed since 1991.

  • License active
  • Workers' comp on file

13 jobs on Los Angeles permits, 2024 to 2026: 5 ADUs, 4 home additions, 2 remodels, 1 seismic retrofit, 1 roofing job. 87th most ADU permits of 271 contractors in Los Angeles.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?License 625249, active in the state's records on Sep 23, 2026General building, electricalNo complaints or citations on the board's public record.Checks out
Workers' comp?Workers' comp policy on file with the stateThis covers their crew if someone is hurt. It is not insurance for your home.On file
In business?Licensed since 1991
Jobs on record13 jobs on Los Angeles permits, 2024 to 2026: 5 ADUs, 4 home additions, 2 remodels, 1 seismic retrofit, 1 roofing jobThey are based in Burbank. Work outside Los Angeles is not in these records.87th most ADU permits of 271 licensed contractors in Los Angeles. That counts jobs, not quality.Our Los Angeles permit records cover September 2023 to September 2026.

Records: the state license board and City of Los Angeles permits.

State license board record

No complaints or citations on the board's public record.

Source: California Contractors State License Board, checked Oct 4, 2026. Look up license 625249 on CSLB

Cost and timing

Permit value (not a price)

Their typical permit lists $90,000 (half list more, half less)

That is the figure written on the permit form, which can be far from what you pay. What ADU jobs cost in Los Angeles.

Get 2 or 3 written quotes.

Permit timeline

Across Los Angeles, a ADU permit stays open about about 12 months, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. Waiting for the permit adds about about 4 months. How long ADU jobs take.

Track record

6 jobs in the last 12 months, about the same as 6 the year before

Q1 2024: 1 jobQ4 2024: 3 jobsQ1 2025: 2 jobsQ2 2025: 1 jobQ2 2026: 5 jobsQ3 2026: 1 jobBusiest: 5 jobs202420252026
Each bar is 3 months of permits. The tallest is 5 jobs, April to June 2026. Across Los Angeles, all contractors together had 1% more ADU jobs in the last 12 months than in the 12 months before.

Where they work most

  • 916065 jobs
  • 914063 jobs
  • 916023 jobs
  • 910421 job
  • 900421 job

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Jul 1, 2026ADUNEW DETACHED ADU PER GCS 66323(a)(4) NFPA 13D FIRE SPRINKLERS THROUGHO91606$60,000
May 28, 2026AdditionAddition and maor remodel to existing single family dwelling wi91606$200,000
May 28, 2026Addition**ePlan** (E) Garage conversion and addition to Accessory Dwelling Un91606$90,000
May 28, 2026ADU**ePlan** (E) Garage conversion and addition to Accessory Dwelling Un91606$90,000
Apr 21, 2026ADU(N) DETACHED ADU PER GCS 66323(a)(2), ALL WORK PER WFPP91042$100,000
Apr 21, 2026RemodelRemodel (e) single family dwelling w/ (n) addition (63 sf) and convert (e) att garage w/ new 2nd…91406$150,000
Apr 28, 2025RemodelAddition and maor remodel to existing single family dwelling with 32'-0" x 21'-0" two -story…91606$200,000
Jan 16, 2025AdditionPROPOSED 25'2"X32'8" ACCESSORY DWELLING UNIT PER LAMC 12.22A.33(c) &91602$98,000
Jan 16, 2025ADUPROPOSED 25'2"X32'8" ACCESSORY DWELLING UNIT PER LAMC 12.22A.33(c) &91602$98,000
Dec 14, 2024Addition, 489 sq ftADDITON TO (E) ONE STORY SINGLE FAMILY WITH JADU (489 SQ.FT) and (E)91406$50,000
Dec 14, 2024ADU, 489 sq ftADDITON TO (E) ONE STORY SINGLE FAMILY WITH JADU (489 SQ.FT) and (E)91406$50,000
Nov 27, 2024Seismic retrofitVoluntary seismic retrofitting with new foundation replacement and repair to replace post/piers in…90042$45,000
Mar 12, 2024Reroof, 20 squares (2,000 sq ft)Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq91602$4,000

What to ask before you hire

About Express Construction Group Inc

  • Ask what the warranty covers and for how long, in writing.

Worth asking any ADU builder

  • Can you show me proof of liability insurance and your bond?
  • Do you handle the plans, engineering and utility hookups, or do I?
  • How long from permit to the final inspection on your last three ADUs?
  • What is the payment schedule, and what is extra?

Get a quote from Express Construction Group Inc

Five quick questions. We pass your request to Express Construction Group Inc.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Express Construction Group Inc. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More ADU builders near 91606 and 91406

See all 271 ADU builders in Los Angeles, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.