contractors.fyi
Sign in

Mid Construction Group

ADU builder based in Los Angeles. Licensed since 2017.

  • License active
  • Workers' comp on file

19 jobs on Los Angeles permits, 2023 to 2026: 11 ADUs, 7 home additions, 1 remodel. 24th most ADU permits of 271 contractors in Los Angeles.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?License 1030925, active in the state's records on Sep 23, 2026General buildingNo complaints or citations on the board's public record.Checks out
Workers' comp?Workers' comp policy on file with the stateThis covers their crew if someone is hurt. It is not insurance for your home.On file
In business?Licensed since 2017
Jobs on record19 jobs on Los Angeles permits, 2023 to 2026: 11 ADUs, 7 home additions, 1 remodel24th most ADU permits of 271 licensed contractors in Los Angeles. That counts jobs, not quality.Our Los Angeles permit records cover September 2023 to September 2026.

Records: the state license board and City of Los Angeles permits.

State license board record

No complaints or citations on the board's public record.

Source: California Contractors State License Board, checked Oct 4, 2026. Look up license 1030925 on CSLB

Cost and timing

Permit value (not a price)

Their typical permit lists $50,000 (half list more, half less)

That is the figure written on the permit form, which can be far from what you pay. What ADU jobs cost in Los Angeles.

Get 2 or 3 written quotes.

Permit timeline

Across Los Angeles, a ADU permit stays open about about 12 months, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. Waiting for the permit adds about about 4 months. How long ADU jobs take.

Track record

5 jobs in the last 12 months, about the same as 5 the year before

Q4 2023: 2 jobsQ1 2024: 2 jobsQ2 2024: 3 jobsQ3 2024: 2 jobsQ1 2025: 4 jobsQ2 2025: 1 jobQ1 2026: 1 jobQ3 2026: 4 jobsBusiest: 4 jobsBusiest: 4 jobs202420252026
Each bar is 3 months of permits. The tallest is 4 jobs, January to March 2025. Across Los Angeles, all contractors together had 1% more ADU jobs in the last 12 months than in the 12 months before.

Where they work most

  • 902912 jobs
  • 900052 jobs
  • 900072 jobs
  • 900362 jobs
  • 902922 jobs

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Sep 10, 2026AdditionConversion of an (e) garage into an adu with 2story addition90291$112,608
Sep 10, 2026ADUConversion of an (e) garage into an adu with 2story addition90291$112,608
Aug 22, 2026ADUNEW 2-STORY ADU PER CA Govt90005$90,000
Aug 20, 2026AdditionGround floor and 2nd floor addition to (e) 2-story sfd with att90005$480,000
Feb 27, 2026RemodelRemodel (E) duplex and 2nd story addition creating one additional unit90007$500,000
Apr 2, 2025ADUConvert portion of (e) garage to (10) new accessory dwelling units per91325$176,000
Feb 13, 2025AdditionConvert (e) detatched garage to (2) accessory dwelling unit with addit90036$50,000
Feb 13, 2025ADUConvert (e) detatched garage to (2) accessory dwelling unit with addit90036$50,000
Jan 30, 2025AdditionNew NEW ADU WITH ROOF DECK OVER (E) 2-CAR GARAGE PER LAMC 12.2290292$100,000
Jan 30, 2025ADUNew NEW ADU WITH ROOF DECK OVER (E) 2-CAR GARAGE PER LAMC 12.2290292$100,000
Jul 2, 2024AdditionConvert portion of existing crawl space to adu (543sf) in existing 8 u90019$40,000
Jul 2, 2024ADUConvert portion of existing crawl space to adu (543sf) in existing 8 u90019$40,000
Jun 11, 2024ADUConvert (19' x 20') garage into adu at the south side of the property90006$25,000
May 17, 2024ADUNew detached ADU for (E) fraternity house per state law GCS 65852.2(e)90007$350,532
Apr 19, 2024AdditionNew 1-story addition to single family dwelling and create an (e) one90066$250,000
Mar 18, 2024ADUConvert detached alq and garage to (2) accessory dwelling units per gc91601$30,000
Feb 8, 2024ADUConvert (e) detached garage into two accessory dwelling units per gcs90008$32,000
Oct 9, 2023AdditionConvert (E) garage to ADU with small addition per GCS 65852.2(e)(1)(D)90018$20,000
Oct 9, 2023ADUConvert (E) garage to ADU with small addition per GCS 65852.2(e)(1)(D)90018$20,000

What to ask before you hire

About Mid Construction Group

  • Ask what the warranty covers and for how long, in writing.

Worth asking any ADU builder

  • Can you show me proof of liability insurance and your bond?
  • Do you handle the plans, engineering and utility hookups, or do I?
  • How long from permit to the final inspection on your last three ADUs?
  • What is the payment schedule, and what is extra?

Get a quote from Mid Construction Group

Five quick questions. We pass your request to Mid Construction Group.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Mid Construction Group. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More ADU builders near 90291 and 90005

See all 271 ADU builders in Los Angeles, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.